GALICIA 13. Call 1/2019 grants for project implementation under the new GENERATION Broadband Extension Programme (Q3206380): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed label, description and/or aliases in pt) |
||||||||||||||
(3 intermediate revisions by the same user not shown) | |||||||||||||||
label / pt | label / pt | ||||||||||||||
GALÍCIA 13. Convite 1/2019 — Subvenções para a execução de projetos no âmbito do novo programa GENERATION de extensão da banda larga | |||||||||||||||
Property / contained in Local Administrative Unit | |||||||||||||||
Property / contained in Local Administrative Unit: Ourense / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 3,944,192.0 Euro / rank | |||||||||||||||
Property / summary: The correct implementation of the project is conditional on the achievement of the objectives of providing coverage of broadband services at speeds of at least 100Mbps, through the technology solution chosen, a FTTH network based on the GPON standard, 7,063 real estate units of 471 individual population entities and 1 area less than a single population entity, corresponding to the municipalities of Aranga, Bergondo, Brión, Cabanas, A Capela, Dodro, Ferrol, Irixoa, Monfero, Narón, Neda, Oleiros, Paderne, Padron, As Pontes de García Rodríguez, Rianxo, Rois (province of A Coruña), O Corgo, Láncara (province of Lugo), Avión, Coles, Leiro, Ourense, A Peroxa, Vilamarín (province of Ourense), Fornelos de Montes, A Lama and Ponte Caldelas (province of Pontevedra), which are specified in the “Geographical scope” of the concession decision. (English) / qualifier | |||||||||||||||
readability score: 0.5436414523083575
| |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
A correta execução do projeto está condicionada à realização dos objetivos de fornecimento de cobertura de serviços de banda larga a débitos de, pelo menos, 100 Mbps, através da solução tecnológica escolhida, uma rede FTTH baseada na norma GPON, 7 063 unidades imobiliárias de 471 unidades populacionais individuais e uma área inferior a uma única entidade populacional, correspondentes aos municípios de Aranga, Bergondo, Brión, Cabanas, A Capela, Dodro, Ferrol, Irixoa, Monfero, Narón, Neda, Oleiros, Paderne, Padron, As Pontes de García Rodríguez, Rianxo, Rois (província de A Coruña), O Corgo, Láncara (província de Lugo), Avión, Coles, Leiro, Ourense, A Peroxa, Vilamarín (província de Ourense), Fornelos de Montes, A Lama e Ponte Caldelas (província de Pontevedra), que são especificados no «âmbito geográfico» da decisão de concessão. (Portuguese) | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 3,155,353.8 Euro / rank | |||||||||||||||
Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 80.00000507074706 percent / rank | |||||||||||||||
Property / date of last update | |||||||||||||||
| |||||||||||||||
Property / date of last update: 12 June 2023 / rank | |||||||||||||||
Property / location (string) | |||||||||||||||
Property / location (string): Varios Municipios de Galicia / rank | |||||||||||||||
Property / contained in NUTS | |||||||||||||||
Property / contained in NUTS: Galicia / rank | |||||||||||||||
Property / location (string) | |||||||||||||||
Varios Municipios de Galicia | |||||||||||||||
Property / location (string): Varios Municipios de Galicia / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / contained in NUTS | |||||||||||||||
Property / contained in NUTS: Pontevedra Province / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / contained in NUTS: Pontevedra Province / qualifier | |||||||||||||||
Property / contained in Local Administrative Unit | |||||||||||||||
Property / contained in Local Administrative Unit: Lalín / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / coordinate location | |||||||||||||||
42°34'30.22"N, 8°8'1.90"W
| |||||||||||||||
Property / coordinate location: 42°34'30.22"N, 8°8'1.90"W / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / coordinate location: 42°34'30.22"N, 8°8'1.90"W / qualifier | |||||||||||||||
Property / budget | |||||||||||||||
3,944,192.0 Euro
| |||||||||||||||
Property / budget: 3,944,192.0 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
2,260,022.0 Euro
| |||||||||||||||
Property / EU contribution: 2,260,022.0 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / co-financing rate | |||||||||||||||
57.3 percent
| |||||||||||||||
Property / co-financing rate: 57.3 percent / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / date of last update | |||||||||||||||
20 December 2023
| |||||||||||||||
Property / date of last update: 20 December 2023 / rank | |||||||||||||||
Normal rank |
Latest revision as of 21:50, 10 October 2024
Project Q3206380 in Spain
Language | Label | Description | Also known as |
---|---|---|---|
English | GALICIA 13. Call 1/2019 grants for project implementation under the new GENERATION Broadband Extension Programme |
Project Q3206380 in Spain |
Statements
2,260,022.0 Euro
0 references
3,944,192.0 Euro
0 references
57.3 percent
0 references
27 May 2019
0 references
31 December 2021
0 references
TELEFONICA DE ESPANA, S.A.
0 references
La correcta ejecución del proyecto queda supeditada a la consecución de los objetivos, consistentes en proporcionar cobertura de servicios de banda ancha a velocidades de al menos 100Mbps, mediante la solución tecnológica elegida, una red FTTH basada en el estándar GPON, a 7.063 unidades inmobiliarias de 471 entidades singulares de población y 1 zona inferior a entidad singular de población, correspondientes a los municipios de Aranga, Bergondo, Brión, Cabanas, A Capela, Dodro, Ferrol, Irixoa, Monfero, Narón, Neda, Oleiros, Paderne, Padrón, As Pontes de García Rodríguez, Rianxo, Rois (provincia de A Coruña), O Corgo, Láncara (provincia de Lugo), Avión, Coles, Leiro, Ourense, A Peroxa, Vilamarín (provincia de Ourense), Fornelos de Montes, A Lama y Ponte Caldelas (provincia de Pontevedra), las cuales se especifican en el anexo "Ámbito geográfico" de la resolución de concesión. (Spanish)
0 references
The correct implementation of the project is conditional on the achievement of the objectives of providing coverage of broadband services at speeds of at least 100Mbps, through the technology solution chosen, a FTTH network based on the GPON standard, 7,063 real estate units of 471 individual population entities and 1 area less than a single population entity, corresponding to the municipalities of Aranga, Bergondo, Brión, Cabanas, A Capela, Dodro, Ferrol, Irixoa, Monfero, Narón, Neda, Oleiros, Paderne, Padron, As Pontes de García Rodríguez, Rianxo, Rois (province of A Coruña), O Corgo, Láncara (province of Lugo), Avión, Coles, Leiro, Ourense, A Peroxa, Vilamarín (province of Ourense), Fornelos de Montes, A Lama and Ponte Caldelas (province of Pontevedra), which are specified in the “Geographical scope” of the concession decision. (English)
13 October 2021
0.5436414523083575
0 references
La mise en œuvre correcte du projet est subordonnée à la réalisation des objectifs de couverture des services à large bande à des vitesses d’au moins 100 Mbps, grâce à la solution technologique choisie, un réseau FTTH basé sur la norme GPON, 7 063 unités immobilières de 471 entités individuelles de population et une zone inférieure à une seule entité de population, correspondant aux municipalités d’Aranga, Bergondo, Brión, Cabanas, A Capela, Dodro, Ferrol, Irixoa, Monfero, Narón, Neda, Oleiros, Paderne, Padron, As Pontes de García Rodríguez, Rianxo, Rois (province d’A Coruña), O Corgo, Láncara (province de Lugo), Avión, Coles, Leiro, Ourense, A Peroxa, Vilamarín (province d’Ourense), Fornelos de Montes, A Lama et Ponte Caldelas (province de Pontevedra), qui sont spécifiés dans le «champ d’application géographique» de la décision de concession. (French)
5 December 2021
0 references
Die ordnungsgemäße Durchführung des Projekts setzt voraus, dass die Ziele erreicht werden, Breitbanddienste mit Geschwindigkeiten von mindestens 100 Mbit/s durch die gewählte Technologielösung zu decken, ein FTTH-Netz auf der Grundlage des GPON-Standards, 7.063 Immobilieneinheiten von 471 einzelnen Bevölkerungseinheiten und 1 Fläche weniger als eine einzige Bevölkerungseinheit, entsprechend den Gemeinden Aranga, Bergondo, Brión, Cabanas, a Capela, Dodro, Ferrol, Irixoa, Monfero, Narón, Neda, Oleiros, Paderne, Padron, As Pontes de García Rodríguez, Rianxo, Rois (Provinz A Coruña), O Corgo, Láncara (Provinz Lugo), Avión, Coles, Leiro, Ourense, A Peroxa, Vilamarín (Provinz Ourense), Fornelos de Montes, A Lama und Ponte Caldelas (Provinz Pontevedra), die im „Geografischen Geltungsbereich“ der Konzessionsentscheidung aufgeführt sind. (German)
9 December 2021
0 references
De correcte uitvoering van het project is afhankelijk van de verwezenlijking van de doelstellingen om breedbanddiensten met snelheden van ten minste 100Mbps te dekken door middel van de gekozen technologieoplossing, een FTTH-netwerk op basis van de GPON-norm, 7 063 vastgoedeenheden van 471 individuele bevolkingsentiteiten en 1 gebied van minder dan één inwonerentiteit, overeenkomend met de gemeenten Aranga, Bergondo, Brión, Cabanas, A Capela, Dodro, Ferrol, Irixoa, Monfero, Narón, Neda, Oleiros, Paderne, Padron, As Pontes de García Rodríguez, Rianxo, Rois (provincie A Coruña), O Corgo, Láncara (provincie Lugo), Avión, Coles, Leiro, Ourense, A Peroxa, Vilamarín (provincie Ourense), Fornelos de Montes, A Lama en Ponte Caldelas (provincie Pontevedra), die zijn omschreven in de geografische werkingssfeer van de concessiebeschikking. (Dutch)
17 December 2021
0 references
La corretta attuazione del progetto è subordinata al conseguimento degli obiettivi di fornire la copertura dei servizi a banda larga a velocità di almeno 100Mbps, attraverso la soluzione tecnologica scelta, una rete FTTH basata sulla norma GPON, 7.063 unità immobiliari di 471 singole entità della popolazione e 1 area inferiore a un'unica entità della popolazione, corrispondente ai comuni di Aranga, Bergondo, Brión, Cabanas, A Capela, Dodro, Ferrol, Irixoa, Monfero, Narón, Neda, Oleiros, Paderne, Padron, As Pontes de García Rodríguez, Rianxo, Rois (provincia di A Coruña), O Corgo, Láncara (provincia di Lugo), Avión, Coles, Leiro, Ourense, A Peroxa, Vilamarín (provincia di Ourense), Fornelos de Montes, A Lama e Ponte Caldelas (provincia di Pontevedra), che sono specificati nell'ambito di applicazione geografico della decisione. (Italian)
16 January 2022
0 references
Η ορθή υλοποίηση του έργου εξαρτάται από την επίτευξη των στόχων της παροχής ευρυζωνικών υπηρεσιών με ταχύτητες τουλάχιστον 100Mbps, μέσω της επιλεγείσας τεχνολογικής λύσης, ενός δικτύου FTTH βάσει του προτύπου GPON, 7.063 κτηματομεσιτικών μονάδων 471 μεμονωμένων πληθυσμιακών οντοτήτων και 1 περιοχής μικρότερης από μία πληθυσμιακή οντότητα, που αντιστοιχεί στους δήμους Aranga, Bergondo, Brión, Cabanas, A Capela, Dodro, Ferrol, Irixoa, Monfero, Narón, Neda, Oleiros, Paderne, Padron, As Pontes de García Rodríguez, Rianxo, Rois (επαρχία A Coruña), O Corgo, Láncara (επαρχία Lugo), Avión, Coles, Leiro, Ourense, A Peroxa, Vilamarín (επαρχία Ourense), Fornelos de Montes, A Lama και Ponte Caldelas (επαρχία Pontevedra), οι οποίες προσδιορίζονται στο «γεωγραφικό πεδίο εφαρμογής» της απόφασης παραχώρησης. (Greek)
18 August 2022
0 references
En korrekt gennemførelse af projektet er betinget af, at målene om at sikre dækning af bredbåndstjenester med en hastighed på mindst 100 Mbps nås ved hjælp af den valgte teknologiløsning, et FTTH-net baseret på GPON-standarden, 7.063 fast ejendomsenheder med 471 individuelle befolkningsenheder og 1 område mindre end en enkelt befolkningsenhed svarende til kommunerne Aranga, Bergondo, Brión og Cabanas. a Capela, Dodro, Ferrol, Irixoa, Monfero, Narón, Neda, Oleiros, Paderne, Padron, As Pontes de García Rodríguez, Rianxo, Rois (provins A Coruña), O Corgo, Láncara (provinsen Lugo), Avión, Coles, Leiro, Ourense, A Peroxa, Vilamarín (provinsen Ourense) Fornelos de Montes, A Lama og Ponte Caldelas (provins Pontevedra), som er specificeret i koncessionsbeslutningens "geografiske anvendelsesområde". (Danish)
18 August 2022
0 references
Hankkeen asianmukainen toteuttaminen edellyttää, että saavutetaan tavoitteet laajakaistapalvelujen kattavuudesta vähintään 100 Mbit/s:n nopeuksilla valitun teknologiaratkaisun avulla GPON-standardiin perustuvan FTTH-verkon, 471 yksittäisen väestöyksikön 7 063 kiinteistöyksikön ja yhden alueen alle yhden asukasyksikön, joka vastaa Arangan, Bergondon, Briónin ja Cabanan kuntia, avulla. a Capela, Dodro, Ferrol, Irixoa, Monfero, Narón, Neda, Oleiros, Paderne, Padron, As Pontes de García Rodríguez, Rianxo, Rois (A Coruñan maakunta), O Corgo, Láncara (Lugon maakunta), Avión, Coles, Leiro, Ourense, A Peroxa, Vilamarín (Ourensen maakunta), Fornelos de Montes, A Lama ja Ponte Caldelas (Pontevedran maakunta), jotka määritellään toimilupapäätöksen maantieteellisessä soveltamisalassa. (Finnish)
18 August 2022
0 references
L-implimentazzjoni korretta tal-proġett hija kondizzjonali fuq il-kisba tal-objettivi li tiġi pprovduta kopertura tas-servizzi tal-broadband b’veloċitajiet ta’ mill-inqas 100Mbps, permezz tas-soluzzjoni teknoloġika magħżula, netwerk FTTH ibbażat fuq l-istandard GPON, 7,063 unità ta’ proprjetà immobbli ta’ 471 entità individwali tal-popolazzjoni u żona waħda inqas minn entità waħda tal-popolazzjoni, li tikkorrispondi għall-muniċipalitajiet ta’ Aranga, Bergondo, Brión, Cabanas, A Capela, Dodro, Ferrol, Irixoa, Monfero, Narón, Neda, Oleiros, Paderne, Padron, As Pontes de García Rodríguez, Rianxo, Rois (provinċja ta’ A Coruña), O Corgo, Láncara (provinċja ta’ Lugo), Avión, Coles, Leiro, Ourense, A Peroxa, Vilamarín (provinċja ta’ Ourense), Fornelos de Montes, A Lama u Ponte Caldelas (provinċja ta’ Pontevedra), li huma speċifikati fl-“ambitu ġeografiku” tad-deċiżjoni ta’ konċessjoni. (Maltese)
18 August 2022
0 references
Projekta pareiza īstenošana ir atkarīga no tā, vai tiek sasniegti mērķi nodrošināt platjoslas pakalpojumu pārklājumu ar ātrumu vismaz 100 Mb/s, izmantojot izvēlēto tehnoloģisko risinājumu, FTTH tīklu, kura pamatā ir GPON standarts, 7063 nekustamā īpašuma vienības, kas sastāv no 471 individuālas iedzīvotāju vienības, un vienu teritoriju, kas ir mazāka par vienu iedzīvotāju vienību, kas atbilst Aranga, Bergondo, Brión, Cabanas pašvaldībām, a Capela, Dodro, Ferrol, Irixoa, Monfero, Narón, Neda, Oleiros, Paderne, Padron, As Pontes de García Rodríguez, Rianxo, Rois (A Coruña province), O Corgo, Láncara (Lugo province), Avión, Coles, Leiro, Ourense, A Peroxa, Vilamarín (mūsdienu province), Fornelos de Montes, A Lama un Ponte Caldelas (Pontevedra province), kas ir precizētas koncesijas lēmuma “Ģeogrāfiskās darbības jomā”. (Latvian)
18 August 2022
0 references
Správna realizácia projektu je podmienená dosiahnutím cieľov poskytovania širokopásmových služieb rýchlosťou najmenej 100 Mb/s prostredníctvom zvoleného technologického riešenia, siete FTTH založenej na štandarde GPON, 7 063 realitných jednotiek 471 jednotlivých obyvateľov a o jednu plochu menšiu ako jeden obyvateľský subjekt, čo zodpovedá obciam Aranga, Bergondo, Brión, Cabanas, a Capela, Dodro, Ferrol, Irixoa, Monfero, Narón, Neda, Oleiros, Paderne, Padron, As Pontes de García Rodríguez, Rianxo, Rois (provincia A Coruña), O Corgo, Láncara (provincia Lugo), Avión, Coles, Leiro, Ourense, A Peroxa, Vilamarín (provincia Ourense), Fornelos de Montes, A Lama a Ponte Caldelas (provincia Pontevedra), ktoré sú špecifikované v „geografickom rozsahu“ rozhodnutia o koncesii. (Slovak)
18 August 2022
0 references
Tá cur chun feidhme ceart an tionscadail ag brath ar bhaint amach na gcuspóirí a bhaineann le clúdach seirbhísí leathanbhanda a sholáthar ag luasanna 100Mbps ar a laghad, tríd an réiteach teicneolaíochta a roghnaíodh, líonra FTTH bunaithe ar chaighdeán GPON, 7,063 aonad eastáit réadaigh de 471 eintiteas daonra aonair agus limistéar 1 níos lú ná aonán daonra amháin, a fhreagraíonn do bhardais Aranga, Bergondo, Brión, Cabanas, A Capela, Dodro, Ferrol, Irixoa, Monfero, Narón, Neda, Oleiros, Paderne, Padron, Mar Pontes de García Rodríguez, Rianxo, Rois (cúige A Coruña), O Corgo, Láncara (foinse Lugo), Avión, Coles, Leiro, Ourense, A Peroxa, Vilamarín (cruth Árense), Fornelos de Montes, A Lama agus Ponte Caldelas (cúige Pontevedra), atá sonraithe i “raon feidhme geografach” an chinnidh lamháltais. (Irish)
18 August 2022
0 references
Správná realizace projektu je podmíněna dosažením cílů zajištění pokrytí širokopásmových služeb rychlostí nejméně 100 Mb/s prostřednictvím zvoleného technologického řešení, sítě FTTH založené na standardu GPON, 7 063 realitních jednotek 471 jednotlivých jednotek obyvatelstva a 1 oblasti menší než jeden subjekt obyvatelstva, odpovídající obcím Aranga, Bergondo, Brión, Cabanas, Capela, Dodro, Ferrol, Irixoa, Monfero, Narón, Neda, Oleiros, Paderne, Padron, As Pontes de García Rodríguez, Rianxo, Rois (provincie A Coruña), O Corgo, Láncara (provincie Lugo), Avión, Coles, Leiro, Ourense, Peroxa, Vilamarín (provincie Ourense), Fornelos de Montes, A Lama a Ponte Caldelas (provincie Pontevedra), které jsou uvedeny v „zeměpisné oblasti působnosti“ rozhodnutí o koncesi. (Czech)
18 August 2022
0 references
A correta execução do projeto está condicionada à realização dos objetivos de fornecimento de cobertura de serviços de banda larga a débitos de, pelo menos, 100 Mbps, através da solução tecnológica escolhida, uma rede FTTH baseada na norma GPON, 7 063 unidades imobiliárias de 471 unidades populacionais individuais e uma área inferior a uma única entidade populacional, correspondentes aos municípios de Aranga, Bergondo, Brión, Cabanas, A Capela, Dodro, Ferrol, Irixoa, Monfero, Narón, Neda, Oleiros, Paderne, Padron, As Pontes de García Rodríguez, Rianxo, Rois (província de A Coruña), O Corgo, Láncara (província de Lugo), Avión, Coles, Leiro, Ourense, A Peroxa, Vilamarín (província de Ourense), Fornelos de Montes, A Lama e Ponte Caldelas (província de Pontevedra), que são especificados no «âmbito geográfico» da decisão de concessão. (Portuguese)
18 August 2022
0 references
Projekti nõuetekohane rakendamine sõltub sellest, kas saavutatakse eesmärk tagada lairibateenuste katvus kiirusega vähemalt 100 Mbit/s valitud tehnoloogialahenduse, GPON standardil põhineva FTTH võrgu, 7,063 kinnisvaraühiku, mis koosneb 471 üksikust rahvastikuüksusest, ja ühe ala, mis on väiksem kui üks rahvastikuüksus, mis vastab Aranga, Bergondo, Brióni ja Cabanase omavalitsustele; a Capela, Dodro, Ferrol, Irixoa, Monfero, Narón, Neda, Oleiros, Paderne, Padron, As Pontes de García Rodríguez, Rianxo, Rois (A Coruña provints), O Corgo, Láncara (Lugo provints), Avión, Coles, Leiro, Ourense, A Peroxa, Vilamarín (Meie provints), Fornelos de Montes, A Lama ja Ponte Caldelas (Pontevedra provints), mis on määratletud kontsessiooniotsuse geograafilises kohaldamisalas. (Estonian)
18 August 2022
0 references
A projekt helyes megvalósításának feltétele, hogy a választott technológiai megoldás, a GPON szabványon alapuló FTTH-hálózat, a 471 egyéni népességű egységből álló 7 063 ingatlanegység és egy lakosnál kisebb területű, Aranga, Bergondo, Brión és Cabanas településeknek megfelelő, legalább 100 Mbps sebességű szélessávú szolgáltatások lefedettsége elérje a kitűzött célokat, a Capela, Dodro, Ferrol, Irixoa, Monfero, Narón, Neda, Oleiros, Paderne, Padron, As Pontes de García Rodríguez, Rianxo, Rois (A Coruña tartománya), O Corgo, Láncara (Lugó megye), Avión, Coles, Leiro, Ourense, A Peroxa, Vilamarín (Ourense megye), Fornelos de Montes, A Lama és Ponte Caldelas (Ponevedra tartomány), amelyeket a koncessziós határozat „Földrajzi hatálya” határoz meg. (Hungarian)
18 August 2022
0 references
Правилното изпълнение на проекта зависи от постигането на целите за осигуряване на покритие на широколентови услуги със скорост най-малко 100 Mbps, чрез избраното технологично решение, FTTH мрежа, базирана на стандарта GPON, 7 063 единици недвижими имоти от 471 отделни единици от населението и 1 район по-малко от един субект от населението, съответстващи на общините Aranga, Bergondo, Brión, Cabanas, A Capela, Dodro, Ferrol, Irixoa, Monfero, Narón, Neda, Oleiros, Paderne, Padron, As Pontes de García Rodríguez, Rianxo, Rois (провинция A Coruña), O Corgo, Láncara (провинция Lugo), Avión, Coles, Leiro, Ourense, A Peroxa, Vilamarín (провинция Оренсе), Fornelos de Montes, A Lama и Ponte Caldelas (провинция Pontevedra), които са посочени в „Географския обхват“ на решението за концесия. (Bulgarian)
18 August 2022
0 references
Teisingas projekto įgyvendinimas priklauso nuo to, ar bus pasiekti tikslai užtikrinti plačiajuosčio ryšio paslaugų aprėptį ne mažesne kaip 100 Mbps sparta, naudojant pasirinktą technologinį sprendimą, FTTH tinklą, pagrįstą GPON standartu, 7 063 nekilnojamojo turto vienetus, priklausančius 471 individualiam gyventojų vienetui ir 1 rajonui, mažesniam už vieną gyventojų vienetą, atitinkantį Aranga, Bergondo, Brión, Cabanas savivaldybes, Capela, Dodro, Ferrol, Irixoa, Monfero, Narón, Neda, Oleiros, Paderne, Padron, As Pontes de García Rodríguez, Rianxo, Rois (Korunjos provincija), O Corgo, Lįncara (Liugo provincija), Avión, Coles, Leiro, Ourense, A Peroxa, Vilamarín (Ourensės provincija), Fornelos de Montes, A Lama ir Ponte Caldelas (Pontevedros provincija), kurios nurodytos koncesijos sprendimo „Geografinėje taikymo srityje“. (Lithuanian)
18 August 2022
0 references
Ispravna provedba projekta uvjetovana je postizanjem ciljeva pokrivenosti širokopojasnih usluga brzinom od najmanje 100Mbps, pomoću odabranog tehnološkog rješenja, FTTH mreže koja se temelji na standardu GPON, 7.063 jedinice nekretnina od 471 pojedinačni populacijski subjekt i 1 područje manje od jednog subjekta stanovništva, što odgovara općinama Aranga, Bergondo, Brión, Cabanas, Capela, Dodro, Ferrol, Irixoa, Monfero, Narón, Neda, Oleiros, Paderne, Padron, As Pontes de García Rodríguez, Rianxo, Rois (pokrajina A Coruña), O Corgo, Láncara (pokrajina Lugo), Avión, Coles, Leiro, Ourense, A Peroxa, Vilamarín (pokrajina Ourense), Fornelos de Montes, A Lama i Ponte Caldelas (pokrajina Pontevedra), koji su navedeni u „zemljopisnom području primjene” odluke o koncesiji. (Croatian)
18 August 2022
0 references
Ett korrekt genomförande av projektet förutsätter att målen att tillhandahålla bredbandstjänster med hastigheter på minst 100 Mbit/s uppnås genom den valda tekniska lösningen, ett FTTH-nät baserat på GPON-standarden, 7 063 fastighetsenheter med 471 enskilda befolkningsenheter och ett område som är mindre än en enda befolkningsenhet, motsvarande kommunerna Aranga, Bergondo, Brión och Cabanas. a Capela, Dodro, Ferrol, Irixoa, Monfero, Narón, Neda, Oleiros, Paderne, Padron, As Pontes de García Rodríguez, Rianxo, Rois (provinsen A Coruña), O Corgo, Láncara (provinsen Lugo), Avión, Coles, Leiro, Ourense, A Peroxa, Vilamarín (provinsen Ourense). Fornelos de Montes, A Lama och Ponte Caldelas (provinsen Pontevedra), som specificeras i koncessionsbeslutets geografiska tillämpningsområde. (Swedish)
18 August 2022
0 references
Implementarea corectă a proiectului este condiționată de îndeplinirea obiectivelor de asigurare a acoperirii serviciilor în bandă largă la viteze de cel puțin 100Mbps, prin intermediul soluției tehnologice alese, o rețea FTTH bazată pe standardul GPON, 7 063 de unități imobiliare de 471 de entități individuale de populație și o zonă mai mică decât o singură entitate de populație, corespunzătoare municipalităților Aranga, Bergondo, Brión, Cabanas, a Capela, Dodro, Ferrol, Irixoa, Monfero, Narón, Neda, Oleiros, Paderne, Padron, As Pontes de García Rodríguez, Rianxo, Rois (provincia A Coruña), O Corgo, Láncara (provincia Lugo), Avión, Coles, Leiro, Ourense, A Peroxa, Vilamarín (provincia Ourense), Fornelos de Montes, A Lama și Ponte Caldelas (provincia Pontevedra), care sunt specificate în „domeniul geografic de aplicare” al deciziei de concesiune. (Romanian)
18 August 2022
0 references
Pravilno izvajanje projekta je pogojeno z doseganjem ciljev zagotavljanja pokritosti s širokopasovnimi storitvami pri hitrostih najmanj 100 Mb/s, in sicer z izbrano tehnološko rešitvijo, omrežjem FTTH, ki temelji na standardu GPON, 7.063 nepremičninskimi enotami 471 posameznih populacijskih subjektov in enim območjem, manjšim od enega samega prebivalstva, kar ustreza občinam Aranga, Bergondo, Brión, Cabanas, Capela, Dodro, Ferrol, Irixoa, Monfero, Narón, Neda, Oleiros, Paderne, Padron, As Pontes de García Rodríguez, Rianxo, Rois (provinca A Coruña), O Corgo, Láncara (provinca Lugo), Avión, Coles, Leiro, Ourense, A Peroxa, Vilamarín (provinca Ourense), Fornelos de Montes, A Lama in Ponte Caldelas (provinca Pontevedra), ki so opredeljena v „geografskem področju uporabe“ odločbe o koncesiji. (Slovenian)
18 August 2022
0 references
Prawidłowa realizacja projektu jest uzależniona od osiągnięcia celów polegających na zapewnieniu zasięgu usług szerokopasmowych z prędkością co najmniej 100 Mb/s, poprzez wybrane rozwiązanie technologiczne, sieć FTTH opartą na standardzie GPON, 7 063 jednostki nieruchomości składające się z 471 jednostek zaludnienia oraz 1 obszar mniejszy niż jeden podmiot populacyjny, odpowiadający gminom Aranga, Bergondo, Brión, Cabanas, Capela, Dodro, Ferrol, Irixoa, Monfero, Narón, Neda, Oleiros, Paderne, Padron, As Pontes de García Rodríguez, Rianxo, Rois (prowincja A Coruña), O Corgo, Láncara (prowincja Lugo), Avión, Coles, Leiro, Ourense, A Peroxa, Vilamarín (prowincja Ourense), Fornelos de Montes, A Lama i Ponte Caldelas (prowincja Pontevedra), które są określone w „zakresie geograficznym” decyzji o koncesji. (Polish)
18 August 2022
0 references
Varios Municipios de Galicia
0 references
20 December 2023
0 references
Identifiers
TSI-061000-2019-0118
0 references