VILLAGE RECOVERY — MARIAN — SEISMIC UPGRADING OF THE MAF B-C (Q2073251): Difference between revisions
Jump to navigation
Jump to search
(BatchIngestion) |
(Changed label, description and/or aliases in pt) |
||||||
(2 intermediate revisions by the same user not shown) | |||||||
label / pt | label / pt | ||||||
RECUPERAÇÃO DE | RECUPERAÇÃO DE VILLAGENS — MARIANO — UPGRADING SEISMIC DO MAF B-C | ||||||
Property / summary: STRUCTURAL REHABILITATION OF BUILDINGS B-C THROUGH TWO METHODS SUGGESTED BY THE DESIGN OF THE CONSTRUCTION AND ITS STRUCTURAL FEATURES, WITH A SEISMIC JOINT SEPARATING THE UNIT INTO TWO SEPARATE BLOCKS (English) / qualifier | |||||||
readability score: 0.0025716998508216
| |||||||
Property / summary | Property / summary | ||||||
REABILITAÇÃO ESTRUTURAL DOS EDIFÍCIOS B-C ATRAVÉS DE DOIS MÉTODOS SUGERIDOS PELA CONCEÇÃO DA CONSTRUÇÃO E DAS SUAS CARACTERÍSTICAS ESTRUTURAIS, COM UMA SEPARAÇÃO CONJUNTA DA UNIDADE EM DOIS BLOCOS SEPARADOS (Portuguese) |
Latest revision as of 19:07, 9 October 2024
Project Q2073251 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | VILLAGE RECOVERY — MARIAN — SEISMIC UPGRADING OF THE MAF B-C |
Project Q2073251 in Italy |
Statements
72,299.3 Euro
0 references
367,290.32 Euro
0 references
19.68 percent
0 references
30 September 2014
0 references
17 October 2018
0 references
30 September 2018
0 references
COMUNE DI CISON DI VALMARINO
0 references
ADEGUAMENTO SISMICO DI RECUPERO STRUTTURALE DEI FABBRICATI B-C ATTRAVERSO DUE MODALITA' SUGGERITE DALLA CONFORMAZIONE DELLA COSTRUZIONE E DALLE SUE PECULIARITA' STRUTTURALI, CON CREAZIONE DI GIUNTO SISMICO CHE SEPARA L'UNITA' IN DUE BLOCCHI DISTINTI (Italian)
0 references
STRUCTURAL REHABILITATION OF BUILDINGS B-C THROUGH TWO METHODS SUGGESTED BY THE DESIGN OF THE CONSTRUCTION AND ITS STRUCTURAL FEATURES, WITH A SEISMIC JOINT SEPARATING THE UNIT INTO TWO SEPARATE BLOCKS (English)
0.0025716998508216
0 references
AJUSTEMENT SISMIQUE DE LA RÉCUPÉRATION STRUCTURELLE DES BÂTIMENTS B-C PAR DEUX MODES SUGGÉRÉS PAR LA CONFORMATION DE LA CONSTRUCTION ET DE SES PARTICULARITÉS STRUCTURELLES, AVEC LA CRÉATION D’UN JOINT SISMIQUE QUI SÉPARE L’UNITÉ EN DEUX BLOCS DISTINCTS (French)
16 December 2021
0 references
SEISMISCHE AANPASSING VAN HET STRUCTURELE HERSTEL VAN B-C GEBOUWEN DOOR MIDDEL VAN TWEE MODI GESUGGEREERD DOOR DE CONFORMATIE VAN DE CONSTRUCTIE EN ZIJN STRUCTURELE EIGENAARDIGHEDEN, MET DE CREATIE VAN SEISMISCHE GEWRICHT DAT DE EENHEID IN TWEE VERSCHILLENDE BLOKKEN SCHEIDT (Dutch)
23 December 2021
0 references
SEISMISCHE ANPASSUNG DER STRUKTURELLEN WIEDERHERSTELLUNG VON B-C-GEBÄUDEN DURCH ZWEI MODI, DIE DURCH DIE KONSTRUKTION DES BAUS UND SEINE STRUKTURELLEN BESONDERHEITEN VORGESCHLAGEN WERDEN, MIT DER SCHAFFUNG EINES SEISMISCHEN GELENKS, DAS DIE EINHEIT IN ZWEI VERSCHIEDENE BLÖCKE TRENNT (German)
24 December 2021
0 references
AJUSTE SÍSMICO DE LA RECUPERACIÓN ESTRUCTURAL DE EDIFICIOS B-C A TRAVÉS DE DOS MODOS SUGERIDOS POR LA CONFORMACIÓN DE LA CONSTRUCCIÓN Y SUS PECULIARIDADES ESTRUCTURALES, CON LA CREACIÓN DE UNA ARTICULACIÓN SÍSMICA QUE SEPARA LA UNIDAD EN DOS BLOQUES DISTINTOS (Spanish)
25 January 2022
0 references
HOONETE B-C STRUKTUURNE REHABILITATSIOON KAHE MEETODI ABIL, MIDA ON SOOVITATUD KONSTRUKTSIOONI JA SELLE KONSTRUKTSIOONILISTE OMADUSTEGA, SEISMILINE LIIGEND, MIS ERALDAB VEEREMIÜKSUSE KAHEKS ERALDI PLOKIKS (Estonian)
27 July 2022
0 references
PASTATŲ B-C STRUKTŪRINĖ REKONSTRUKCIJA DVIEM METODAIS, KURIUOS SIŪLO KONSTRUKCIJOS KONSTRUKCIJA IR JOS STRUKTŪRINĖS YPATYBĖS, SEISMINE JUNGTIMI ATSKIRIANT ĮRENGINĮ Į DU ATSKIRUS BLOKUS (Lithuanian)
27 July 2022
0 references
STRUKTURNA REHABILITACIJA ZGRADA B-C KROZ DVIJE METODE PREDLOŽENE PROJEKTIRANJEM KONSTRUKCIJE I NJEZINIM KONSTRUKCIJSKIM ZNAČAJKAMA, S SEIZMIČKIM SPOJEM KOJI ODVAJA JEDINICU U DVA ODVOJENA BLOKA (Croatian)
27 July 2022
0 references
ΔΟΜΙΚΉ ΑΠΟΚΑΤΆΣΤΑΣΗ ΚΤΙΡΊΩΝ B-C ΜΕ ΔΎΟ ΜΕΘΌΔΟΥΣ ΠΟΥ ΠΡΟΤΕΊΝΟΝΤΑΙ ΑΠΌ ΤΟ ΣΧΕΔΙΑΣΜΌ ΤΗΣ ΚΑΤΑΣΚΕΥΉΣ ΚΑΙ ΤΑ ΔΟΜΙΚΆ ΧΑΡΑΚΤΗΡΙΣΤΙΚΆ ΤΗΣ, ΜΕ ΣΕΙΣΜΙΚΌ ΣΎΝΔΕΣΜΟ ΠΟΥ ΧΩΡΊΖΕΙ ΤΗ ΜΟΝΆΔΑ ΣΕ ΔΎΟ ΞΕΧΩΡΙΣΤΆ ΤΜΉΜΑΤΑ (Greek)
27 July 2022
0 references
ŠTRUKTURÁLNA OBNOVA BUDOV B-C PROSTREDNÍCTVOM DVOCH METÓD NAVRHNUTÝCH NÁVRHOM STAVBY A JEJ KONŠTRUKČNÝCH PRVKOV, SO SEIZMICKÝM KĹBOM, KTORÝ ODDEĽUJE JEDNOTKU DO DVOCH SAMOSTATNÝCH BLOKOV (Slovak)
27 July 2022
0 references
RAKENNUSTEN RAKENTEELLINEN KUNNOSTAMINEN B-C KÄYTTÄEN KAHTA MENETELMÄÄ, JOITA RAKENNUSSUUNNITTELU JA SEN RAKENTEELLISET OMINAISUUDET EHDOTTAVAT, SEISMISELLÄ LIITOKSELLA, JOKA EROTTAA YKSIKÖN KAHDEKSI ERILLISEKSI LOHKOKSI (Finnish)
27 July 2022
0 references
RENOWACJA STRUKTURALNA BUDYNKÓW B-C ZA POMOCĄ DWÓCH METOD SUGEROWANYCH PRZEZ PROJEKT KONSTRUKCJI I JEJ CECHY KONSTRUKCYJNE, ZE ZŁĄCZEM SEJSMICZNYM ODDZIELAJĄCYM JEDNOSTKĘ NA DWA ODDZIELNE BLOKI (Polish)
27 July 2022
0 references
A B-C ÉPÜLETEK SZERKEZETI REHABILITÁCIÓJA AZ ÉPÍTÉS ÉS SZERKEZETI JELLEMZŐI ÁLTAL JAVASOLT KÉT MÓDSZERREL, EGY SZEIZMIKUS KÖZÖSSÉGGEL, AMELY AZ EGYSÉGET KÉT KÜLÖNÁLLÓ BLOKKRA BONTJA (Hungarian)
27 July 2022
0 references
STRUKTURÁLNÍ OBNOVA BUDOV B-C DVĚMA METODAMI NAVRŽENÝMI NÁVRHEM STAVBY A JEHO KONSTRUKČNÍMI PRVKY, SEISMICKÝM KLOUBEM DĚLÍCÍM JEDNOTKU DO DVOU SAMOSTATNÝCH BLOKŮ (Czech)
27 July 2022
0 references
ĒKU B-C STRUKTURĀLĀ ATJAUNOŠANA, IZMANTOJOT DIVAS METODES, KAS IEROSINĀTAS KONSTRUKCIJAS PROJEKTĀ UN TĀS STRUKTURĀLAJĀS ĪPAŠĪBĀS, AR SEISMISKO SAVIENOJUMU, KAS ATDALA VIENĪBU DIVOS ATSEVIŠĶOS BLOKOS (Latvian)
27 July 2022
0 references
ATHSHLÁNÚ STRUCHTÚRACH FOIRGNEAMH B-C TRÍ DHÁ MHODH A MHOLTAR TRÍ DHEARADH NA TÓGÁLA AGUS A GHNÉITHE STRUCHTÚRACHA, LE COMHPHÁIRTEACH SEISMEACH A SCARANN AN T-AONAD INA DHÁ BHLOC AR LEITH (Irish)
27 July 2022
0 references
STRUKTURNA SANACIJA STAVB B-C Z DVEMA METODAMA, KI JU PREDLAGA ZASNOVA GRADNJE IN NJENIH STRUKTURNIH ZNAČILNOSTI, S SEIZMIČNIM SPOJOM, KI LOČUJE ENOTO NA DVA LOČENA BLOKA (Slovenian)
27 July 2022
0 references
СТРУКТУРНА РЕХАБИЛИТАЦИЯ НА СГРАДИ B-C ЧРЕЗ ДВА МЕТОДА, ПРЕДЛОЖЕНИ ОТ ПРОЕКТИРАНЕТО НА КОНСТРУКЦИЯТА И НЕЙНИТЕ СТРУКТУРНИ ХАРАКТЕРИСТИКИ, СЪС СЕИЗМИЧНО СЪЕДИНЕНИЕ, РАЗДЕЛЯЩО ЕДИНИЦАТА НА ДВА ОТДЕЛНИ БЛОКА (Bulgarian)
27 July 2022
0 references
RIABILITAZZJONI STRUTTURALI TAL-BINI B-C PERMEZZ TA’ ŻEWĠ METODI SSUĠĠERITI MID-DISINN TAL-KOSTRUZZJONI U L-KARATTERISTIĊI STRUTTURALI TAGĦHA, B’ĠONTA SISMIKA LI TISSEPARA L-UNITÀ F’ŻEWĠ BLOKKI SEPARATI (Maltese)
27 July 2022
0 references
REABILITAÇÃO ESTRUTURAL DOS EDIFÍCIOS B-C ATRAVÉS DE DOIS MÉTODOS SUGERIDOS PELA CONCEÇÃO DA CONSTRUÇÃO E DAS SUAS CARACTERÍSTICAS ESTRUTURAIS, COM UMA SEPARAÇÃO CONJUNTA DA UNIDADE EM DOIS BLOCOS SEPARADOS (Portuguese)
27 July 2022
0 references
STRUKTUREL ISTANDSÆTTELSE AF BYGNINGER B-C VED HJÆLP AF TO METODER FORESLÅET AF KONSTRUKTIONEN OG DENS STRUKTURELLE TRÆK, MED ET SEISMISK LED, DER ADSKILLER ENHEDEN I TO SEPARATE BLOKKE (Danish)
27 July 2022
0 references
REABILITAREA STRUCTURALĂ A CLĂDIRILOR B-C PRIN DOUĂ METODE SUGERATE DE PROIECTAREA CONSTRUCȚIEI ȘI CARACTERISTICILE SALE STRUCTURALE, CU O ÎMBINARE SEISMICĂ CARE SEPARĂ UNITATEA ÎN DOUĂ BLOCURI SEPARATE (Romanian)
27 July 2022
0 references
STRUKTURELL UPPRUSTNING AV BYGGNADER B-C GENOM TVÅ METODER SOM FÖRESLÅS AV KONSTRUKTIONEN OCH DESS STRUKTURELLA EGENSKAPER, MED EN SEISMISK FOG SOM SEPARERAR ENHETEN I TVÅ SEPARATA BLOCK (Swedish)
27 July 2022
0 references
CISON DI VALMARINO
0 references
8 April 2023
0 references
Identifiers
I89J16000220006
0 references