Completion of the Residual Water Drainage Subsystem of Mezio Alguidar (Q2982273): Difference between revisions
Jump to navigation
Jump to search
(BatchIngestion) |
(Added qualifier: readability score (P590521): 0.0320816263050304) |
||||||||||||||
(One intermediate revision by the same user not shown) | |||||||||||||||
Property / beneficiary name (string) | |||||||||||||||
Property / beneficiary name (string): MUNICÍPIO DE LOUSADA / rank | |||||||||||||||
Property / summary: The present operation includes the installation of the low-level networks necessary to complete the Mezio Subsystem, as well as the geological study and topographic survey necessary for the respective project. It is also planned to install the high Interceptors to close this subsystem. (English) / qualifier | |||||||||||||||
readability score: 0.0320816263050304
| |||||||||||||||
Property / beneficiary | |||||||||||||||
Property / beneficiary: Q3000056 (Deleted Item) / rank | |||||||||||||||
Property / date of last update | |||||||||||||||
| |||||||||||||||
Property / date of last update: 23 May 2023 / rank | |||||||||||||||
Property / beneficiary | |||||||||||||||
Property / beneficiary: MUNICÍPIO DE LOUSADA / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / beneficiary name (string) | |||||||||||||||
MUNICÍPIO DE LOUSADA | |||||||||||||||
Property / beneficiary name (string): MUNICÍPIO DE LOUSADA / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / date of last update | |||||||||||||||
14 November 2023
| |||||||||||||||
Property / date of last update: 14 November 2023 / rank | |||||||||||||||
Normal rank |
Latest revision as of 16:18, 12 March 2024
Project Q2982273 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Completion of the Residual Water Drainage Subsystem of Mezio Alguidar |
Project Q2982273 in Portugal |
Statements
779,237.44 Euro
0 references
916,361.0 Euro
0 references
85.04 percent
0 references
8 October 2016
0 references
30 September 2020
0 references
MUNICÍPIO DE LOUSADA
0 references
A presente operação contempla a instalação das redes em baixa necessárias para concluir o Subsistema do Mezio, bem como o estudo geológico e o levantamento topográfico necessários para o respetivo projeto. Prevê-se também a instalação dos Intercetores em alta que permitem fechar este subsistema. (Portuguese)
0 references
The present operation includes the installation of the low-level networks necessary to complete the Mezio Subsystem, as well as the geological study and topographic survey necessary for the respective project. It is also planned to install the high Interceptors to close this subsystem. (English)
9 July 2021
0.0320816263050304
0 references
Cette opération comprend l’installation des réseaux bas nécessaires à l’achèvement du sous-système Mezio, ainsi que l’étude géologique et le relevé topographique requis pour le projet concerné. Des dispositions sont également prévues pour l’installation d’intercepteurs élevés pour fermer ce sous-système. (French)
7 December 2021
0 references
Dieser Betrieb umfasst die Installation der für die Fertigstellung des Mezio-Subsystems erforderlichen niedrigen Netze sowie die für das jeweilige Projekt erforderliche geologische Untersuchung und topografische Erhebung. Außerdem ist vorgesehen, dass das Teilsystem mit hohen Abfanggeräten geschlossen werden kann. (German)
15 December 2021
0 references
Deze operatie omvat de installatie van de lage netwerken die nodig zijn voor de voltooiing van het subsysteem Mezio, alsmede de geologische studie en topografische enquête die nodig zijn voor het desbetreffende project. Ook is voorzien in de installatie van hoge interceptoren om dit subsysteem te sluiten. (Dutch)
20 December 2021
0 references
Tale operazione comprende l'installazione delle reti basse necessarie per completare il sottosistema Mezio, nonché lo studio geologico e l'indagine topografica necessaria per il rispettivo progetto. È previsto anche l'installazione di intercettori di alto livello per la chiusura di questo sottosistema. (Italian)
18 January 2022
0 references
Esta operación incluye la instalación de las redes bajas necesarias para completar el subsistema Mezio, así como el estudio geológico y el estudio topográfico necesario para el proyecto respectivo. También se prevén créditos para la instalación de interceptores de alta intensidad para cerrar este subsistema. (Spanish)
22 January 2022
0 references
Käesolev tegevus hõlmab Mezio allsüsteemi lõpuleviimiseks vajalike madalatasemeliste võrkude paigaldamist ning vastava projekti jaoks vajalikku geoloogilist uuringut ja topograafilist uuringut. Selle allsüsteemi sulgemiseks on kavas paigaldada ka kõrged Interceptorid. (Estonian)
3 August 2022
0 references
Ši operacija apima žemo lygio tinklų, reikalingų Mezio posistemiui užbaigti, įrengimą, taip pat atitinkamam projektui būtiną geologinį tyrimą ir topografinį tyrimą. Taip pat planuojama įrengti aukštus perėmiklius šiam posistemiui uždaryti. (Lithuanian)
3 August 2022
0 references
Ova operacija uključuje postavljanje mreža niske razine potrebnih za dovršenje podsustava Mezio, kao i geološke studije i topografske preglede potrebne za predmetni projekt. Također se planira ugradnja visokih presretača kako bi se zatvorio ovaj podsustav. (Croatian)
3 August 2022
0 references
Η παρούσα λειτουργία περιλαμβάνει την εγκατάσταση των δικτύων χαμηλού επιπέδου που είναι απαραίτητα για την ολοκλήρωση του υποσυστήματος Mezio, καθώς και τη γεωλογική μελέτη και την τοπογραφική έρευνα που απαιτούνται για το αντίστοιχο έργο. Προβλέπεται επίσης η εγκατάσταση των υψηλών αναχαιτιστών για το κλείσιμο αυτού του υποσυστήματος. (Greek)
3 August 2022
0 references
Súčasná prevádzka zahŕňa inštaláciu nízkoúrovňových sietí potrebných na dokončenie subsystému Mezio, ako aj geologickú štúdiu a topografický prieskum potrebný pre príslušný projekt. Plánuje sa tiež inštalovať vysoké zachytávače na uzavretie tohto subsystému. (Slovak)
3 August 2022
0 references
Tähän toimeen kuuluu Mezio-osajärjestelmän täydentämiseksi tarvittavien matalan tason verkkojen asentaminen sekä kyseisen hankkeen edellyttämä geologinen tutkimus ja topografinen tutkimus. Tämän osajärjestelmän sulkemista varten on myös tarkoitus asentaa korkeat interseptorit. (Finnish)
3 August 2022
0 references
Niniejsza operacja obejmuje instalację sieci niskiego poziomu niezbędnych do ukończenia podsystemu Mezio, a także badania geologiczne i badania topograficzne niezbędne dla danego projektu. Planuje się również zainstalowanie wysokich interceptorów w celu zamknięcia tego podsystemu. (Polish)
3 August 2022
0 references
A jelen művelet magában foglalja a Mezio alrendszer befejezéséhez szükséges alacsony szintű hálózatok telepítését, valamint az adott projekthez szükséges földtani tanulmányokat és topográfiai felmérést. Az alrendszer bezárása érdekében a tervek szerint a magas Interceptorokat is beépítik. (Hungarian)
3 August 2022
0 references
Současný provoz zahrnuje instalaci nízkoúrovňových sítí nezbytných pro dokončení subsystému Mezio, jakož i geologickou studii a topografický průzkum nezbytný pro příslušný projekt. Plánuje se také instalace vysokých stíhačů pro uzavření tohoto subsystému. (Czech)
3 August 2022
0 references
Pašreizējā darbība ietver Mezio apakšsistēmas pabeigšanai nepieciešamo zema līmeņa tīklu uzstādīšanu, kā arī attiecīgajam projektam nepieciešamo ģeoloģisko izpēti un topogrāfisko izpēti. Plānots arī uzstādīt augstos pārtvērējus, lai slēgtu šo apakšsistēmu. (Latvian)
3 August 2022
0 references
Áirítear leis an oibríocht reatha suiteáil na líonraí ar leibhéal íseal is gá chun Fochóras Mezio a chur i gcrích, chomh maith leis an staidéar geolaíoch agus an suirbhé topagrafach is gá don tionscadal faoi seach. Tá sé beartaithe freisin na hArd-Idirghabhálaithe a shuiteáil chun an fochóras seo a dhúnadh. (Irish)
3 August 2022
0 references
Ta operacija vključuje namestitev omrežij na nizki ravni, potrebnih za dokončanje podsistema Mezio, ter geološko študijo in topografsko raziskavo, potrebno za zadevni projekt. Načrtuje se tudi namestitev visokih prestreznikov za zapiranje tega podsistema. (Slovenian)
3 August 2022
0 references
Настоящата експлоатация включва инсталирането на мрежи на ниско ниво, необходими за завършване на подсистемата Mezio, както и геоложките проучвания и топографските проучвания, необходими за съответния проект. Планира се също така да се инсталират високите прехващачи, за да се затвори тази подсистема. (Bulgarian)
3 August 2022
0 references
Din l-operazzjoni tinkludi l-installazzjoni tan-netwerks ta’ livell baxx meħtieġa biex titlesta s-Subsistema Mezio, kif ukoll l-istudju ġeoloġiku u l-istħarriġ topgrafiku meħtieġ għall-proġett rispettiv. Huwa ppjanat ukoll li jiġu installati l-Interċettituri għoljin biex jagħlqu din is-subsistema. (Maltese)
3 August 2022
0 references
Den nuværende operation omfatter installation af de lavniveaunet, der er nødvendige for at færdiggøre Mezio-delsystemet, samt den geologiske undersøgelse og topografiske undersøgelser, der er nødvendige for det pågældende projekt. Det er også planlagt at installere de høje interceptorer for at lukke dette delsystem. (Danish)
3 August 2022
0 references
Prezenta operațiune include instalarea rețelelor de nivel scăzut necesare pentru finalizarea subsistemului Mezio, precum și studiul geologic și studiul topografic necesare pentru proiectul respectiv. De asemenea, este planificat să se instaleze interceptoarele înalte pentru a închide acest subsistem. (Romanian)
3 August 2022
0 references
Den nuvarande åtgärden omfattar installation av de lågnivånät som krävs för att slutföra Mezio-delsystemet, samt den geologiska studie och topografiska undersökning som krävs för respektive projekt. Man planerar också att installera de höga avskiljarna för att stänga detta delsystem. (Swedish)
3 August 2022
0 references
Lousada
0 references
14 November 2023
0 references
Identifiers
POSEUR-03-2012-FC-000380
0 references