“Modernisation of Odrzański locks on the section in the management of Gliwice Gliwice – adaptation to the third class of the waterway” Phase II (Q85875): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed label, description and/or aliases in pt)
 
(7 intermediate revisions by 2 users not shown)
label / ptlabel / pt
«Modernização das eclusas de Oder na secção do Conselho de Administração da RZGW Gliwice adaptação à terceira classe da via navegável» Fase II
«Modernização das eclusas de Odrzański no troço de gestão de Gliwice Gliwice adaptação à terceira classe da via navegável» Fase II
Property / beneficiary name (string)
PAŃSTWOWE GOSPODARSTWO WODNE WODY POLSKIE
 
Property / beneficiary name (string): PAŃSTWOWE GOSPODARSTWO WODNE WODY POLSKIE / rank
Normal rank
 
Property / summary: The project consists of the completion of complex construction works leading to the modernisation of two locks on the Gliwice Canal – the Elbe and Dzierżno. The completion of the works will reduce the locking period at the Swan mucus by 7 minutes, and on Śkuza Dzierżno by 10 minutes. (English) / qualifier
 
readability score: 0.0059626123225785
Amount0.0059626123225785
Unit1
Property / summaryProperty / summary
O projeto consiste na conclusão de obras complexas que conduziram à modernização de duas eclusas no Canal de Gliwice — Łabęda e Dzierżno. A execução das obras permitirá encurtar o período de bloqueio na fechadura do Elba em 7 minutos, e no aperto Dzierżno em 10 minutos. (Portuguese)
O projeto consiste na conclusão de obras de construção complexas conducentes à modernização de duas eclusas no canal de Gliwice – o Elba e Dzierżno. A conclusão das obras reduzirá o período de bloqueio no muco de cisne em 7 minutos e em Śkuza Dzierżno em 10 minutos. (Portuguese)
Property / coordinate location: 50°18'4.0"N, 18°39'44.3"E / qualifier
 
Property / coordinate location: 50°23'29.8"N, 18°36'39.2"E / qualifier
 
Property / coordinate location: 50°21'34.9"N, 18°24'29.9"E / qualifier
 
Property / beneficiary
 
Property / beneficiary: State Water Holding "Polish Waters" / rank
Normal rank
 
Property / contained in NUTS: Gliwicki / qualifier
 
Property / date of last update
24 May 2023
Timestamp+2023-05-24T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / date of last update: 24 May 2023 / rank
Normal rank
 
Property / contained in Local Administrative Unit
 
Property / contained in Local Administrative Unit: Gliwice / rank
 
Normal rank
Property / contained in Local Administrative Unit: Gliwice / qualifier
 
Property / beneficiary
 
Property / beneficiary: State Water Holding "Polish Waters" / rank
 
Normal rank
Property / beneficiary name (string)
 
PAŃSTWOWE GOSPODARSTWO WODNE WODY POLSKIE
Property / beneficiary name (string): PAŃSTWOWE GOSPODARSTWO WODNE WODY POLSKIE / rank
 
Normal rank
Property / date of last update
 
13 December 2023
Timestamp+2023-12-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / date of last update: 13 December 2023 / rank
 
Normal rank

Latest revision as of 22:02, 12 October 2024

Project Q85875 in Poland
Language Label Description Also known as
English
“Modernisation of Odrzański locks on the section in the management of Gliwice Gliwice – adaptation to the third class of the waterway” Phase II
Project Q85875 in Poland

    Statements

    0 references
    41,408,723.51 zloty
    0 references
    9,205,159.24 Euro
    13 January 2020
    0 references
    48,716,145.49 zloty
    0 references
    10,829,599.14 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2016
    0 references
    31 December 2020
    0 references
    PAŃSTWOWE GOSPODARSTWO WODNE WODY POLSKIE
    0 references
    0 references

    50°18'4.0"N, 18°39'44.3"E
    0 references

    50°23'29.8"N, 18°36'39.2"E
    0 references

    50°21'34.9"N, 18°24'29.9"E
    0 references
    Projekt polega na wykoniu kompleksowych prac budowlanych prowadzących do modernizacji dwóch śluz na Kanale Gliwickim - Łabędy i Dzierżno. Wykonanie prac pozwoli na skrócenie okresu śluzowania na śluzie Łabędy o 7 minut, a na śkuzie Dzierżno o 10 minut. (Polish)
    0 references
    The project consists of the completion of complex construction works leading to the modernisation of two locks on the Gliwice Canal – the Elbe and Dzierżno. The completion of the works will reduce the locking period at the Swan mucus by 7 minutes, and on Śkuza Dzierżno by 10 minutes. (English)
    14 October 2020
    0.0059626123225785
    0 references
    Le projet consiste en l’achèvement de travaux de construction complexes menant à la modernisation de deux écluses sur le canal de Gliwice — Łabęda et Dzierżno. L’exécution des travaux permettra de raccourcir la période de verrouillage sur l’écluse de l’Elbe de 7 minutes, et sur la pression Dzierżno de 10 minutes. (French)
    30 November 2021
    0 references
    Das Projekt besteht aus der Fertigstellung komplexer Bauarbeiten, die zur Modernisierung zweier Schleusen am Gliwice-Kanal – Łabęda und Dzierżno – führen. Die Ausführung der Arbeiten ermöglicht es, die Verriegelungszeit auf der Elbeschleuse um 7 Minuten und auf der Squeeze Dzierżno um 10 Minuten zu verkürzen. (German)
    7 December 2021
    0 references
    Het project bestaat uit de voltooiing van complexe bouwwerken die leiden tot de modernisering van twee sluizen op het Gliwicekanaal — Łabęda en Dzierżno. De uitvoering van de werken maakt het mogelijk om de vergrendelingsperiode op het Elbe-slot met 7 minuten te verkorten en op de knijp Dzierżno met 10 minuten. (Dutch)
    16 December 2021
    0 references
    Il progetto consiste nel completamento di complessi lavori di costruzione che portano alla modernizzazione di due chiuse sul canale Gliwice — Łabęda e Dzierżno. L'esecuzione dei lavori permetterà di accorciare il periodo di chiusura sulla serratura dell'Elba di 7 minuti, e sulla spremuta Dzierżno di 10 minuti. (Italian)
    16 January 2022
    0 references
    El proyecto consiste en la finalización de obras de construcción complejas que conducen a la modernización de dos esclusas en el Canal de Gliwice — Łabęda y Dzierżno. La ejecución de las obras permitirá acortar el período de bloqueo en la cerradura del Elba en 7 minutos, y en la compresión Dzierżno en 10 minutos. (Spanish)
    19 January 2022
    0 references
    Projektet består i færdiggørelse af komplekse byggearbejder, der fører til modernisering af to sluser på Gliwice-kanalen — Łabęda og Dzierżno. Udførelsen af arbejderne vil gøre det muligt at forkorte låsetiden på Elben-låsen med 7 minutter, og på klemmen Dzierżno med 10 minutter. (Danish)
    26 July 2022
    0 references
    Το έργο συνίσταται στην ολοκλήρωση σύνθετων κατασκευαστικών εργασιών που οδήγησαν στον εκσυγχρονισμό δύο κλειδαριών στο κανάλι Gliwice — Łabęda και Dzierżno. Η εκτέλεση των εργασιών θα επιτρέψει τη συντόμευση της περιόδου κλειδώματος στην κλειδαριά του Έλβα κατά 7 λεπτά και στη συμπίεση κατά 10 λεπτά. (Greek)
    26 July 2022
    0 references
    Projekt se sastoji od završetka složenih građevinskih radova koji su doveli do modernizacije dviju brava na kanalu Gliwice – Łabęda i Dzierżno. Izvođenje radova omogućit će skratiti razdoblje zaključavanja na Elbe bravu za 7 minuta, a na stiskanje Dzierżno za 10 minuta. (Croatian)
    26 July 2022
    0 references
    Proiectul constă în finalizarea lucrărilor complexe de construcție care au condus la modernizarea a două ecluze pe canalul Gliwice – Łabęda și Dzierżno. Executarea lucrărilor va permite scurtarea perioadei de blocare pe încuietoarea Elba cu 7 minute, iar pe Dzierżno cu 10 minute. (Romanian)
    26 July 2022
    0 references
    Projekt pozostáva z dokončenia komplexných stavebných prác vedúcich k modernizácii dvoch plavebných komôr na kanáli Gliwice – Łabęda a Dzierżno. Vykonanie prác umožní skrátiť uzamykaciu dobu na zámku Labe o 7 minút a na stlačení Dzierżno o 10 minút. (Slovak)
    26 July 2022
    0 references
    Il-proġett jikkonsisti fit-tlestija ta’ xogħlijiet kumplessi ta’ kostruzzjoni li jwasslu għall-modernizzazzjoni ta’ żewġ serraturi fil-Kanal ta’ Gliwice — Łabęda u Dzierżno. L-eżekuzzjoni tax-xogħlijiet se tippermetti li jitqassar il-perjodu ta ‘qfil fuq il-lock Elbe b’7 minuti, u fuq il-kompressjoni Dzierżno b’10 minuti. (Maltese)
    26 July 2022
    0 references
    O projeto consiste na conclusão de obras de construção complexas conducentes à modernização de duas eclusas no canal de Gliwice – o Elba e Dzierżno. A conclusão das obras reduzirá o período de bloqueio no muco de cisne em 7 minutos e em Śkuza Dzierżno em 10 minutos. (Portuguese)
    26 July 2022
    0 references
    Hanke koostuu monimutkaisten rakennustöiden loppuun saattamisesta, jotka johtavat Gliwicen kanavan kahden lukon – Łabędan ja Dzierżnon – nykyaikaistamiseen. Töiden suorittamisella voidaan lyhentää lukitusaikaa Elbe-lukituksessa 7 minuuttia ja puristaa Dzierżno kymmenellä minuutilla. (Finnish)
    26 July 2022
    0 references
    Projekt obsega dokončanje kompleksnih gradbenih del, ki so privedle do posodobitve dveh zapornic na kanalu Gliwice – Łabęda in Dzierżno. Izvedba del bo omogočila skrajšanje obdobja zaklepanja na ključavnici Labe za 7 minut, na stisku Dzierżno pa za 10 minut. (Slovenian)
    26 July 2022
    0 references
    Projekt spočívá v dokončení komplexních stavebních prací vedoucích k modernizaci dvou zámků na kanálu Gliwice – Łabęda a Dzierżno. Provedení prací umožní zkrátit dobu zamykání na Labském zámku o 7 minut a na stisknutí Dzierżna o 10 minut. (Czech)
    26 July 2022
    0 references
    Projektą sudaro sudėtingi statybos darbai, kuriais modernizuojamos dvi Gliwice kanalo spynos – Łabęda ir Dzierżno. Darbų vykdymas leis sutrumpinti Elbės spynos fiksavimo laikotarpį 7 min., o „Dzierżno“ – 10 minučių. (Lithuanian)
    26 July 2022
    0 references
    Projekts ietver sarežģītu būvdarbu pabeigšanu, lai modernizētu divas slūžas Glivices kanālā — Łabęda un Dzierżno. Darbu izpilde ļaus saīsināt bloķēšanas laiku uz Elbas slēdzenes par 7 minūtēm, un uz saspiest Dzierżno par 10 minūtēm. (Latvian)
    26 July 2022
    0 references
    Проектът се състои в завършване на комплексни строителни работи, водещи до модернизация на две ключалки на канала Gliwice — Łabęda и Dzierżno. Изпълнението на работите ще позволи да се съкрати периодът на заключване на ключалката Elbe с 7 минути, а на стискането Dzierżno с 10 минути. (Bulgarian)
    26 July 2022
    0 references
    A projekt a Gliwice-csatorna két zsilipjének – Łabęda és Dzierżno – modernizálásához vezető komplex építési munkálatok befejezéséből áll. A munkálatok végrehajtása lehetővé teszi az Elba zár zárolási idejének lerövidítését 7 perccel, a Dzierżno szorításnál pedig 10 perccel. (Hungarian)
    26 July 2022
    0 references
    Is éard atá sa tionscadal ná oibreacha tógála casta a chríochnú as a dtiocfaidh nuachóiriú dhá ghlais ar Chanáil Gliwice — Łabęda agus Dzierżno. Ligfidh cur i gcrích na n-oibreacha an tréimhse glasála ar ghlas Elbe a ghiorrú faoi 7 nóiméad, agus ar an Dzierżno squeeze faoi 10 nóiméad. (Irish)
    26 July 2022
    0 references
    Projektet består av slutförandet av komplexa byggnadsarbeten som leder till modernisering av två slussar på Gliwicekanalen – Łabęda och Dzierżno. Genomförandet av arbetena kommer att göra det möjligt att förkorta låstiden på Elbe-låset med 7 minuter och på pressa Dzierżno med 10 minuter. (Swedish)
    26 July 2022
    0 references
    Projekt hõlmab keerukate ehitustööde lõpuleviimist, mis viivad Gliwice kanali kahe luku – Łabęda ja Dzierżno – moderniseerimiseni. Tööde teostamine võimaldab lühendada Elbe lukustusaega 7 minuti võrra ja suruda Dzierżno 10 minuti võrra. (Estonian)
    26 July 2022
    0 references
    WOJ.: ŚLĄSKIE, POW.: Gliwice
    0 references
    WOJ.: ŚLĄSKIE, POW.: gliwicki
    0 references
    13 December 2023
    0 references

    Identifiers

    POIS.03.02.00-00-0001/16
    0 references