Construction of the S7 expressway. Warsaw – Grójec (Q85866): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed label, description and/or aliases in pt)
 
(6 intermediate revisions by 2 users not shown)
label / ptlabel / pt
Construção da via expressa S7, secção. Varsóvia Grójec
Construção da via rápida S7. Varsóvia Grójec
Property / EU contribution
542,448,242.39 zloty
Amount542,448,242.39 zloty
Unitzloty
 
Property / EU contribution: 542,448,242.39 zloty / rank
Normal rank
 
Property / EU contribution
120,586,244.28 Euro
Amount120,586,244.28 Euro
UnitEuro
 
Property / EU contribution: 120,586,244.28 Euro / rank
Preferred rank
 
Property / EU contribution: 120,586,244.28 Euro / qualifier
exchange rate to Euro: 0.24 Euro
Amount0.24 Euro
UnitEuro
 
Property / EU contribution: 120,586,244.28 Euro / qualifier
point in time: 13 January 2020
Timestamp+2020-01-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / beneficiary name (string)
GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD
 
Property / beneficiary name (string): GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD / rank
Normal rank
 
Property / summary: The main part of the project is the construction of the S7 expressway on a section starting near the “Airport” junction to the Grójec ring road, located in the TEN-T comprehensive network with a total length of 29.16 km. (English) / qualifier
 
readability score: 0.0583732646136578
Amount0.0583732646136578
Unit1
Property / summaryProperty / summary
A parte principal do projeto é a construção da via rápida S7 no troço que começa em torno do cruzamento «Aeroporto» com a estrada circular de Grójca, localizada na rede global da RTE-T com um comprimento total de 29,16 km. (Portuguese)
A parte principal do projeto é a construção da via rápida S7 num troço que começa perto do cruzamento do «aeroporto» com a circunvalação de Grójec, localizado na rede global da RTE-T, com um comprimento total de 29,16 km. (Portuguese)
Property / coordinate location: 51°51'55.8"N, 20°52'3.0"E / qualifier
 
Property / coordinate location: 52°5'20.4"N, 20°56'31.9"E / qualifier
 
Property / coordinate location: 52°4'28.9"N, 21°1'37.6"E / qualifier
 
Property / coordinate location: 51°58'48.0"N, 20°50'1.3"E / qualifier
 
Property / coordinate location: 52°9'29.9"N, 20°55'27.1"E / qualifier
 
Property / coordinate location: 52°14'1.3"N, 21°4'17.0"E / qualifier
 
Property / beneficiary
 
Property / beneficiary: General Directorate for National Roads and Highways / rank
Normal rank
 
Property / budget
638,174,402.82 zloty
Amount638,174,402.82 zloty
Unitzloty
 
Property / budget: 638,174,402.82 zloty / rank
Normal rank
 
Property / budget
141,866,169.75 Euro
Amount141,866,169.75 Euro
UnitEuro
 
Property / budget: 141,866,169.75 Euro / rank
Preferred rank
 
Property / budget: 141,866,169.75 Euro / qualifier
exchange rate to Euro: 0.24 Euro
Amount0.24 Euro
UnitEuro
 
Property / budget: 141,866,169.75 Euro / qualifier
point in time: 13 January 2020
Timestamp+2020-01-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / contained in NUTS: Miasto Warszawa / qualifier
 
Property / contained in NUTS: Warszawski zachodni / qualifier
 
Property / contained in NUTS: Żyrardowski / qualifier
 
Property / co-financing rate
85.0 percent
Amount85.0 percent
Unitpercent
 
Property / co-financing rate: 85.0 percent / rank
Normal rank
 
Property / date of last update
24 May 2023
Timestamp+2023-05-24T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / date of last update: 24 May 2023 / rank
Normal rank
 
Property / contained in Local Administrative Unit
 
Property / contained in Local Administrative Unit: Warszawa / rank
 
Normal rank
Property / contained in Local Administrative Unit: Warszawa / qualifier
 
Property / instance of
 
Property / instance of: Major Projects / rank
 
Normal rank
Property / Major project CCI
 
2018PL16CFMP004
Property / Major project CCI: 2018PL16CFMP004 / rank
 
Normal rank
Property / beneficiary
 
Property / beneficiary: Q4611933 / rank
 
Normal rank
Property / beneficiary name (string)
 
GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD
Property / beneficiary name (string): GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD / rank
 
Normal rank
Property / budget
 
638,174,400.0 zloty
Amount638,174,400.0 zloty
Unitzloty
Property / budget: 638,174,400.0 zloty / rank
 
Normal rank
Property / budget
 
153,161,860.0 Euro
Amount153,161,860.0 Euro
UnitEuro
Property / budget: 153,161,860.0 Euro / rank
 
Preferred rank
Property / EU contribution
 
542,448,260.0 zloty
Amount542,448,260.0 zloty
Unitzloty
Property / EU contribution: 542,448,260.0 zloty / rank
 
Normal rank
Property / EU contribution
 
130,187,576.0 Euro
Amount130,187,576.0 Euro
UnitEuro
Property / EU contribution: 130,187,576.0 Euro / rank
 
Preferred rank
Property / co-financing rate
 
85.0 percent
Amount85.0 percent
Unitpercent
Property / co-financing rate: 85.0 percent / rank
 
Normal rank
Property / date of last update
 
13 December 2023
Timestamp+2023-12-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / date of last update: 13 December 2023 / rank
 
Normal rank

Latest revision as of 22:04, 12 October 2024

Project Q85866 in Poland
Language Label Description Also known as
English
Construction of the S7 expressway. Warsaw – Grójec
Project Q85866 in Poland

    Statements

    0 references
    0 references
    0 references
    542,448,260.0 zloty
    0 references
    130,187,576.0 Euro
    0 references
    638,174,400.0 zloty
    0 references
    153,161,860.0 Euro
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2023
    0 references
    GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD
    0 references
    0 references
    0 references

    51°51'55.8"N, 20°52'3.0"E
    0 references

    52°5'20.4"N, 20°56'31.9"E
    0 references

    52°4'28.9"N, 21°1'37.6"E
    0 references

    51°58'48.0"N, 20°50'1.3"E
    0 references

    52°9'29.9"N, 20°55'27.1"E
    0 references

    52°14'1.3"N, 21°4'17.0"E
    0 references
    Zasadniczą częścią przedsięwzięcia jest budowa drogi ekspresowej S7 na odcinku mającym początek w okolicach węzła „Lotnisko” do obwodnicy Grójca, zlokalizowanej w sieci kompleksowej TEN-T o łącznej długości 29,16 km. (Polish)
    0 references
    The main part of the project is the construction of the S7 expressway on a section starting near the “Airport” junction to the Grójec ring road, located in the TEN-T comprehensive network with a total length of 29.16 km. (English)
    14 October 2020
    0.0583732646136578
    0 references
    La partie principale du projet est la construction de la voie express S7 sur la section commençant autour de la jonction «aéroport» de la rocade de Grójca, située dans le réseau global RTE-T d’une longueur totale de 29,16 km. (French)
    30 November 2021
    0 references
    Der Hauptteil des Projekts ist der Bau der Schnellstraße S7 auf dem Abschnitt, der um die Kreuzung „Flughafen“ zur Ringstraße Grójca beginnt, die sich im TEN-V-Gesamtnetz mit einer Gesamtlänge von 29,16 km befindet. (German)
    7 December 2021
    0 references
    Het grootste deel van het project is de aanleg van de S7-snelweg op het gedeelte dat begint rond het knooppunt „Luchthaven” naar de ringweg Grójca, gelegen in het uitgebreide TEN-T-netwerk met een totale lengte van 29,16 km. (Dutch)
    16 December 2021
    0 references
    La parte principale del progetto è la costruzione della superstrada S7 sul tratto che inizia intorno allo svincolo "Airport" con la tangenziale di Grójca, situata nella rete globale TEN-T per una lunghezza totale di 29,16 km. (Italian)
    16 January 2022
    0 references
    La parte principal del proyecto es la construcción de la autopista S7 en el tramo que comienza en torno al cruce «Aeropuerto» con la carretera de circunvalación de Grójca, ubicada en la red global de la RTE-T con una longitud total de 29,16 km. (Spanish)
    19 January 2022
    0 references
    Hoveddelen af projektet er opførelsen af S7-motorvejen på den strækning, der begynder omkring "lufthavnskrydset" til ringvejen Grójca, som ligger i det samlede TEN-T-net med en samlet længde på 29,16 km. (Danish)
    26 July 2022
    0 references
    Το κύριο μέρος του έργου είναι η κατασκευή της οδού ταχείας κυκλοφορίας S7 στο τμήμα που αρχίζει γύρω από τη διασταύρωση «Αερολιμένας» με την περιφερειακή οδό Grójca, που βρίσκεται στο εκτεταμένο δίκτυο ΔΕΔ-Μ συνολικού μήκους 29,16 km. (Greek)
    26 July 2022
    0 references
    Glavni dio projekta je izgradnja autoceste S7 na dionici koja počinje oko spoja „Zračna luka” do obilaznice Grójca, koja se nalazi u sveobuhvatnoj mreži TEN-T ukupne duljine 29,16 km. (Croatian)
    26 July 2022
    0 references
    Partea principală a proiectului este construcția autostrăzii S7 pe tronsonul care pornește în jurul joncțiunii „Aeroport” până la șoseaua de centură Grójca, situată în rețeaua globală TEN-T, cu o lungime totală de 29,16 km. (Romanian)
    26 July 2022
    0 references
    Hlavnou časťou projektu je výstavba rýchlostnej cesty S7 na úseku začínajúcom okolo križovatky „letisko“ k okruhu Grójca, ktorý sa nachádza v komplexnej sieti TEN-T s celkovou dĺžkou 29,16 km. (Slovak)
    26 July 2022
    0 references
    Il-parti ewlenija tal-proġett hija l-kostruzzjoni tal-expressway S7 fis-sezzjoni li tibda madwar il-junction tal-“Ajruport” mar-ring road Grójca, li tinsab fin-netwerk komprensiv tat-TEN-T b’tul totali ta’ 29.16 km. (Maltese)
    26 July 2022
    0 references
    A parte principal do projeto é a construção da via rápida S7 num troço que começa perto do cruzamento do «aeroporto» com a circunvalação de Grójec, localizado na rede global da RTE-T, com um comprimento total de 29,16 km. (Portuguese)
    26 July 2022
    0 references
    Hankkeen pääosa on S7-moottoritien rakentaminen lentoaseman ja Grójcan kehätien risteyksen ympärille alkavalle osalle, joka sijaitsee kattavassa TEN-T-verkossa, jonka kokonaispituus on 29,16 kilometriä. (Finnish)
    26 July 2022
    0 references
    Glavni del projekta je gradnja hitre ceste S7 na odseku, ki se začne okoli križišča „Letališče“ do obvoznice Grójca, ki se nahaja v celovitem omrežju TEN-T s skupno dolžino 29,16 km. (Slovenian)
    26 July 2022
    0 references
    Hlavní součástí projektu je výstavba rychlostní silnice S7 na úseku začínajícím kolem křižovatky „Letiště“ k okruhu Grójca, který se nachází v globální síti TEN-T o celkové délce 29,16 km. (Czech)
    26 July 2022
    0 references
    Pagrindinė projekto dalis – greitkelio S7 tiesimas ruože, prasidedančiame aplink „Oro uosto“ jungtį su Grójca žiediniu keliu, esančiu TEN-T visuotiniame tinkle, kurio bendras ilgis yra 29,16 km. (Lithuanian)
    26 July 2022
    0 references
    Projekta galvenā daļa ir ātrgaitas šosejas S7 izbūve posmā, kas sākas ap “lidostas” savienojumu ar Grójca apvedceļu, kas atrodas TEN-T visaptverošajā tīklā ar kopējo garumu 29,16 km. (Latvian)
    26 July 2022
    0 references
    Основната част от проекта е изграждането на автомагистрала S7 в участъка, започващ около кръстовището „летище“ до околовръстния път Grójca, разположен в широкообхватната мрежа TEN-T с обща дължина 29,16 km. (Bulgarian)
    26 July 2022
    0 references
    A projekt fő része az S7-es gyorsforgalmi út megépítése a Grójcai körgyűrűhöz vezető „Repülőtér” csomópont körüli szakaszon, amely a TEN-T átfogó hálózatában 29,16 km teljes hosszúságú. (Hungarian)
    26 July 2022
    0 references
    Is é an chuid is mó den tionscadal ná tógáil an luasbhealaigh S7 ar an gcuid a thosaíonn timpeall an acomhal “Aerfort” chuig an mbóthar fáinne Grójca, atá suite i ngréasán cuimsitheach TEN-T le fad iomlán 29.16 km. (Irish)
    26 July 2022
    0 references
    Huvuddelen av projektet är byggandet av S7-motorvägen på den sträcka som börjar runt ”Airport” korsningen till Grójca ringvägen, som ligger i TEN-T övergripande nät med en total längd på 29,16 km. (Swedish)
    26 July 2022
    0 references
    Projekti põhiosaks on kiirtee S7 ehitamine, mis asub TEN-T üldvõrgus 29,16 km pikkuses TEN-T üldvõrgus asuva Grójca ringtee ristmiku ümber asuval lõigul. (Estonian)
    26 July 2022
    0 references
    WOJ.: MAZOWIECKIE, POW.: Warszawa
    0 references
    WOJ.: MAZOWIECKIE, POW.: grójecki
    0 references
    WOJ.: MAZOWIECKIE, POW.: piaseczyński
    0 references
    WOJ.: MAZOWIECKIE, POW.: pruszkowski
    0 references
    13 December 2023
    0 references

    Identifiers

    POIS.03.01.00-00-0045/18
    0 references
    4888
    0 references
    2018PL16CFMP004
    0 references