DIRECTOR SIMERI-MUCONE (Q2021716): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed label, description and/or aliases in pt)
 
(5 intermediate revisions by 2 users not shown)
label / ptlabel / pt
DIRETOR SIMERI-MUCONE
Diretor SIMERI-MUCONE
Property / summary: THIS PROJECT RELATES TO THE ADAPTATION OF THE TRANSPORT LINE OF 150 KV SIMERI-CATANZARO THROUGH THE REPLACEMENT OF CONDUCTORS WITH AN ALUMINIUM ALLOY ROPE (ZTAL) — WITH ALUMINIUM ALLOY CORD (ACI) BEING 22.75 MM), INSTALLATION OF TECHNOLOGICALLY ADVANCED COMPONENTS SUCH AS PHASOR MEASUREMENT UNIT IN CATANZARO, CALUSIA AND MUCONE AND THE INSTALLATION OF A (NEW GENERATION) PLANT TRANSFORMER IN CATANZARO PLANT. (English) / qualifier
 
readability score: 0.088538193607984
Amount0.088538193607984
Unit1
Property / summaryProperty / summary
ESTE PROJETO DIZ RESPEITO À ADAPTAÇÃO DA LINHA DE TRANSPORTE DE 150 KV SIMERI-CATANZARO ATRAVÉS DA SUBSTITUIÇÃO DE CONDUTORES POR UM CABO DE LIGA DE ALUMÍNIO (ZTAL) — COM UM CABO DE LIGA DE ALUMÍNIO (ACI) DE 22,75 MM), À INSTALAÇÃO DE COMPONENTES TECNOLOGICAMENTE AVANÇADOS, TAIS COMO A UNIDADE DE MEDIÇÃO DE FASORES EM CATANZARO, CALUSIA E MUCONE, E À INSTALAÇÃO DE UM TRANSFORMADOR DE (NOVA GERAÇÃO) NA FÁBRICA DE CATANZARO. (Portuguese)
O PRESENTE PROJECTO RELACIONA-SE COM A ADAPTAÇÃO DA LINHA DE TRANSPORTE DE 150 KV SIMERI-CATANZARO ATRAVÉS DA SUBSTITUIÇÃO DE CONDUTORES COM UMA ROPA DE LIGA DE ALUMÍNIO (ZTAL) — COM UMA LIGA DE ALUMÍNIO (ACI) DE 22,75 MM), A INSTALAÇÃO DE COMPONENTES TECNOLÓGICAMENTE AVANÇADOS, COMO UNIDADE DE MEDIÇÃO DE FASORES EM CATANZARO, CALUSIA E MUCONE E A INSTALAÇÃO DE UM TRANSFORMADOR DE PLANTA (NOVA GERAÇÃO) EM PLANTA CATANZARO. (Portuguese)
Property / contained in Local Administrative Unit
 
Property / contained in Local Administrative Unit: Simeri Crichi / rank
 
Normal rank
Property / Call for proposal
 
Property / Call for proposal: Manifestazione Reti trasmissione / rank
 
Normal rank

Latest revision as of 04:48, 11 October 2024

Project Q2021716 in Italy
Language Label Description Also known as
English
DIRECTOR SIMERI-MUCONE
Project Q2021716 in Italy

    Statements

    0 references
    1,119,038.47 Euro
    0 references
    1,542,801.01 Euro
    0 references
    72.53 percent
    0 references
    13 March 2018
    0 references
    20 April 2021
    0 references
    30 November 2020
    0 references
    "TERNA - RETE ELETTRICA NAZIONALE SOCIETA' PER AZIONI" (IN FORMA ABBREVIATA "TERNA S.P.A.")
    0 references

    38°57'17.96"N, 16°38'28.00"E
    0 references
    IL PRESENTE PROGETTO RIGUARDA INTERVENTI DI ADEGUAMENTO DELLA LINEA DI TRASPORTO A 150 KV SIMERI-CATANZARO ATTRAVERSO LA SOSTITUZIONE DI CONDUTTORI CON CONDUTTORI INNOVATIVI AD ALTA CAPACITà (CONDUTTORI A CORDA DI LEGA DI ALLUMINIO (ZTAL) - LEGA FE-NI RIVESTITA DI ALLUMINIO (ACI) Ø 22,75 MM), INSTALLAZIONE DI COMPONENTI TECNOLOGICAMENTE AVANZATI QUALI PHASOR MEASUREMENT UNIT PRESSO LE S.E. DI CATANZARO, CALUSIA E MUCONE E L'INSTALLAZIONE DI UN TRASFORMATORE AD OLIO VEGETALE (DI NUOVA GENERAZIONE) PRESSO LA STAZIONE DI CATANZARO. (Italian)
    0 references
    THIS PROJECT RELATES TO THE ADAPTATION OF THE TRANSPORT LINE OF 150 KV SIMERI-CATANZARO THROUGH THE REPLACEMENT OF CONDUCTORS WITH AN ALUMINIUM ALLOY ROPE (ZTAL) — WITH ALUMINIUM ALLOY CORD (ACI) BEING 22.75 MM), INSTALLATION OF TECHNOLOGICALLY ADVANCED COMPONENTS SUCH AS PHASOR MEASUREMENT UNIT IN CATANZARO, CALUSIA AND MUCONE AND THE INSTALLATION OF A (NEW GENERATION) PLANT TRANSFORMER IN CATANZARO PLANT. (English)
    0.088538193607984
    0 references
    CE PROJET CONCERNE L’ADAPTATION DE LA LIGNE DE TRANSPORT SIMERI-CATANZARO 150 KV PAR LE REMPLACEMENT DES CONDUCTEURS PAR DES CONDUCTEURS INNOVANTS À HAUTE CAPACITÉ (CONDUCTEURS DE CÂBLES EN ALLIAGE D’ALUMINIUM (ZTAL) — ALLIAGE FE-NI REVÊTU D’ALUMINIUM (ACI) 22,75 MM), L’INSTALLATION DE COMPOSANTS TECHNOLOGIQUEMENT AVANCÉS TELS QUE L’UNITÉ DE MESURE DU PHASOR À LA S.E. DE CATANZARO, CALUSIA ET MUCONE ET L’INSTALLATION D’UN TRANSFORMATEUR D’HUILE VÉGÉTALE (NOUVELLE GÉNÉRATION) À LA STATION DE CATANZARO. (French)
    14 December 2021
    0 references
    DIT PROJECT HEEFT BETREKKING OP DE AANPASSING VAN DE TRANSPORTLIJN SIMERI-CATANZARO 150 KV DOOR DE VERVANGING VAN GELEIDERS DOOR INNOVATIEVE HOOGVERMOGEN GELEIDERS (ALUMINIUMLEGERING (ZTAL) KABELGELEIDERS — ALUMINIUM-GECOATE FE-NI-LEGERING (ACI) 22,75 MM), INSTALLATIE VAN TECHNOLOGISCH GEAVANCEERDE COMPONENTEN ZOALSPHASORMEETEENHEID BIJ DE S.E. VAN CATANZARO, CALUSIA EN MUCONE EN DE INSTALLATIE VAN EEN TRANSFORMATOR VOOR PLANTAARDIGE OLIE (NIEUWE GENERATIE) IN HET CATANZARO-STATION. (Dutch)
    23 December 2021
    0 references
    DIESES PROJEKT BETRIFFT DIE ANPASSUNG DER TRANSPORTLINIE SIMERI-CATANZARO 150 KV DURCH DEN AUSTAUSCH VON LEITERN DURCH INNOVATIVE HOCHLEISTUNGSLEITER (ALUMINIUMLEGIERUNG (ZTAL) SEILLEITER – ALUMINIUM-BESCHICHTETE FE-NI-LEGIERUNG (ACI) 22,75 MM), INSTALLATION VON TECHNOLOGISCH FORTSCHRITTLICHEN KOMPONENTEN WIE PHASOR-MESSEINHEIT AN DER S.E. VON CATANZARO, CALUSIA UND MUCONE UND DIE INSTALLATION EINES PFLANZENÖLTRANSFORMATORS (NEUE GENERATION) AN DER STATION CATANZARO. (German)
    24 December 2021
    0 references
    ESTE PROYECTO SE REFIERE A LA ADAPTACIÓN DE LA LÍNEA DE TRANSPORTE SIMERI-CATANZARO 150 KV MEDIANTE LA SUSTITUCIÓN DE CONDUCTORES POR CONDUCTORES INNOVADORES DE ALTA CAPACIDAD (ALEACIÓN DE ALUMINIO (ZTAL) — ALEACIÓN FE-NI (ACI) REVESTIDA DE ALUMINIO (ACI) 22,75 MM), LA INSTALACIÓN DE COMPONENTES TECNOLÓGICAMENTE AVANZADOS COMO LA UNIDAD DE MEDICIÓN DE FASES EN LA S.E. DE CATANZARO, CALUSIA Y MUCONE Y LA INSTALACIÓN DE UN TRANSFORMADOR DE ACEITE VEGETAL (NUEVA GENERACIÓN) EN LA ESTACIÓN DE CATANZARO. (Spanish)
    24 January 2022
    0 references
    DETTE PROJEKT VEDRØRER TILPASNINGEN AF TRANSPORTLINJEN PÅ 150 KV SIMERI-CATANZARO GENNEM UDSKIFTNING AF LEDERE MED ET ALUMINIUMSLEGERINGSREB (ZTAL) — MED EN ALUMINIUMSLEGERINGSLEDNING (ACI) PÅ 22,75 MM), INSTALLATION AF TEKNOLOGISK AVANCEREDE KOMPONENTER SÅSOM PHASORMÅLEENHED I CATANZARO, CALUSIA OG MUCONE OG INSTALLATION AF EN (NY GENERATION) FABRIKSTRANSFORMER I CATANZARO. (Danish)
    5 July 2022
    0 references
    ΤΟ ΈΡΓΟ ΑΥΤΌ ΑΦΟΡΆ ΤΗΝ ΠΡΟΣΑΡΜΟΓΉ ΤΗΣ ΓΡΑΜΜΉΣ ΜΕΤΑΦΟΡΆΣ ΤΩΝ 150 KV SIMERI-CATANZARO ΜΈΣΩ ΤΗΣ ΑΝΤΙΚΑΤΆΣΤΑΣΗΣ ΤΩΝ ΑΓΩΓΏΝ ΜΕ ΈΝΑ ΣΧΟΙΝΊ ΑΠΌ ΚΡΆΜΑ ΑΛΟΥΜΙΝΊΟΥ (ZTAL) — ΜΕ ΚΑΛΏΔΙΟ ΚΡΆΜΑΤΟΣ ΑΛΟΥΜΙΝΊΟΥ (ACI) 22,75 MM), ΤΗΝ ΕΓΚΑΤΆΣΤΑΣΗ ΤΕΧΝΟΛΟΓΙΚΆ ΠΡΟΗΓΜΈΝΩΝ ΕΞΑΡΤΗΜΆΤΩΝ ΌΠΩΣ Η ΜΟΝΆΔΑ ΜΈΤΡΗΣΗΣ ΤΟΥ ΦΆΣΟΡ ΣΤΟ CATANZARO, CALUSIA ΚΑΙ MUCONE ΚΑΙ ΤΗΝ ΕΓΚΑΤΆΣΤΑΣΗ (ΝΈΑΣ) ΜΟΝΆΔΑΣ ΜΕΤΑΣΧΗΜΑΤΙΣΤΉ ΣΤΟ ΕΡΓΟΣΤΆΣΙΟ CATANZARO. (Greek)
    5 July 2022
    0 references
    OVAJ PROJEKT ODNOSI SE NA PRILAGODBU TRANSPORTNE LINIJE OD 150 KV SIMERI-CATANZARO ZAMJENOM VODIČA ALUMINIJSKOM UŽETU (ZTAL) – S UŽETOM OD ALUMINIJSKE LEGURE (ACI) 22,75 MM, UGRADNJOM TEHNOLOŠKI NAPREDNIH KOMPONENTI KAO ŠTO JE FASORSKA MJERNA JEDINICA U CATANZARU, CALUZIJI I MUCONEU TE UGRADNJI TRANSFORMATORA (NOVE GENERACIJE) U POSTROJENJU CATANZARO. (Croatian)
    5 July 2022
    0 references
    ACEST PROIECT SE REFERĂ LA ADAPTAREA LINIEI DE TRANSPORT DE 150 KV SIMERI-CATANZARO PRIN ÎNLOCUIREA CONDUCTOARELOR CU O FRÂNGHIE DIN ALIAJ DE ALUMINIU (ZTAL) – CU CABLU DIN ALIAJ DE ALUMINIU (ACI) FIIND 22,75 MM), INSTALAREA DE COMPONENTE AVANSATE DIN PUNCT DE VEDERE TEHNOLOGIC, CUM AR FI UNITATEA DE MĂSURARE A PHASOR ÎN CATANZARO, CALUSIA ȘI MUCONE ȘI INSTALAREA UNUI TRANSFORMATOR DE UZINĂ (DE NOUĂ GENERAȚIE) ÎN UZINA CATANZARO. (Romanian)
    5 July 2022
    0 references
    TENTO PROJEKT SA TÝKA PRISPÔSOBENIA PREPRAVNEJ LINKY 150 KV SIMERI-CATANZARO NAHRADENÍM VODIČOV LANOM Z HLINÍKOVEJ ZLIATINY (ZTAL) – S POVRAZOM Z HLINÍKOVEJ ZLIATINY (ACI) S DĹŽKOU 22,75 MM), INŠTALÁCIOU TECHNOLOGICKY VYSPELÝCH KOMPONENTOV, AKO JE JEDNOTKA NA MERANIE FÁZ V CATANZARO, KALUSIA A MUCONE A INŠTALÁCIA (NOVEJ GENERÁCIE) RASTLINNÉHO TRANSFORMÁTORA V ZÁVODE CATANZARO. (Slovak)
    5 July 2022
    0 references
    DAN IL-PROĠETT HUWA RELATAT MAL-ADATTAMENT TAL-LINJA TA’ TRASPORT TA’ 150 KV SIMERI-CATANZARO PERMEZZ TAS-SOSTITUZZJONI TA’ KONDUTTURI B’ĦABEL TAL-LIGA TAL-ALUMINJU (ZTAL) — BIL-KORDA TAL-LIGA TAL-ALUMINJU (ACI) TKUN TA’ 22.75 MM), L-INSTALLAZZJONI TA’ KOMPONENTI TEKNOLOĠIKAMENT AVVANZATI BĦALL-UNITÀ TAL-KEJL TAL-PALETTI F’CATANZARO, CALUSIA U MUCONE U L-INSTALLAZZJONI TA’ TRANSFORMER TAL-IMPJANT (TA’ ĠENERAZZJONI ĠDIDA) FL-IMPJANT TA’ CATANZARO. (Maltese)
    5 July 2022
    0 references
    O PRESENTE PROJECTO RELACIONA-SE COM A ADAPTAÇÃO DA LINHA DE TRANSPORTE DE 150 KV SIMERI-CATANZARO ATRAVÉS DA SUBSTITUIÇÃO DE CONDUTORES COM UMA ROPA DE LIGA DE ALUMÍNIO (ZTAL) — COM UMA LIGA DE ALUMÍNIO (ACI) DE 22,75 MM), A INSTALAÇÃO DE COMPONENTES TECNOLÓGICAMENTE AVANÇADOS, COMO UNIDADE DE MEDIÇÃO DE FASORES EM CATANZARO, CALUSIA E MUCONE E A INSTALAÇÃO DE UM TRANSFORMADOR DE PLANTA (NOVA GERAÇÃO) EM PLANTA CATANZARO. (Portuguese)
    5 July 2022
    0 references
    TÄMÄ HANKE LIITTYY 150 KV:N SIMERI-CATANZARON KULJETUSLINJAN MUKAUTTAMISEEN VAIHTAMALLA JOHTIMET ALUMIINISEOSKÖYSI (ZTAL) – ALUMIINISEOSJOHTO (ACI) ON 22,75 MM, ASENTAMINEN TEKNISESTI EDISTYKSELLISIIN KOMPONENTTEIHIN, KUTEN FASORIN MITTAYKSIKKÖ CATANZAROON, CALUSIAAN JA MUCONEEN, SEKÄ (UUDEN SUKUPOLVEN) KASVIMUUNTAJAN ASENTAMINEN CATANZARON LAITOKSEEN. (Finnish)
    5 July 2022
    0 references
    PROJEKT TEN DOTYCZY DOSTOSOWANIA LINII TRANSPORTOWEJ 150 KV SIMERI-CATANZARO POPRZEZ WYMIANĘ PRZEWODÓW NA LINĘ ZE STOPU ALUMINIUM (ZTAL) – Z PRZEWODEM ZE STOPU ALUMINIUM (ACI) WYNOSZĄCYM 22,75 MM), MONTAŻ ZAAWANSOWANYCH TECHNOLOGICZNIE ELEMENTÓW, TAKICH JAK JEDNOSTKA MIARY PHASORÓW W CATANZARO, CALUSIA I MUCONE ORAZ INSTALACJA TRANSFORMATORA (NOWEJ GENERACJI) W ZAKŁADZIE CATANZARO. (Polish)
    5 July 2022
    0 references
    TA PROJEKT SE NANAŠA NA PRILAGODITEV TRANSPORTNE LINIJE 150 KV SIMERI-CATANZARO Z ZAMENJAVO PREVODNIKOV Z VRVJO IZ ALUMINIJEVE ZLITINE (ZTAL) – S KORDOM IZ ALUMINIJEVE ZLITINE (ACI) 22,75 MM), NAMESTITVIJO TEHNOLOŠKO NAPREDNIH KOMPONENT, KOT JE FAZARSKA MERSKA ENOTA V CATANZARU, CALUSIA IN MUCONE, TER NAMESTITVIJO (NOVE GENERACIJE) RASTLINSKEGA TRANSFORMATORJA V OBRATU CATANZARO. (Slovenian)
    5 July 2022
    0 references
    TENTO PROJEKT SE TÝKÁ ÚPRAVY PŘEPRAVNÍ LINKY 150 KV SIMERI-CATANZARO NAHRAZENÍM VODIČŮ LANEM Z HLINÍKOVÉ SLITINY (ZTAL) – S ŠŇŮROU Z HLINÍKOVÉ SLITINY (ACI) 22,75 MM), INSTALACÍ TECHNOLOGICKY VYSPĚLÝCH KOMPONENTŮ, JAKO JE FÁZOVÁ MĚŘICÍ JEDNOTKA V CATANZARO, CALUSIA A MUCONE, A INSTALACÍ TRANSFORMÁTORU (NOVÉ GENERACE) V ZÁVODĚ CATANZARO. (Czech)
    5 July 2022
    0 references
    ŠIS PROJEKTAS SUSIJĘS SU 150 KV SIMERI-CATANZARO TRANSPORTAVIMO LINIJOS PRITAIKYMU KEIČIANT LAIDININKUS ALIUMINIO LYDINIO LYNU (ZTAL) SU ALIUMINIO LYDINIO KORDU (ACI) 22,75 MM), TECHNOLOGIŠKAI PAŽANGIŲ KOMPONENTŲ, TOKIŲ KAIP FAZORIŲ MATAVIMO ĮRENGINYS CATANZARO, CALUSIA IR MUCONE, ĮRENGIMU IR (NAUJOS KARTOS) GAMYKLOS TRANSFORMATORIAUS ĮRENGIMU CATANZARO GAMYKLOJE. (Lithuanian)
    5 July 2022
    0 references
    ŠIS PROJEKTS ATTIECAS UZ 150 KV SIMERI-KATANZARO TRANSPORTA LĪNIJAS PIELĀGOŠANU, NOMAINOT VADUS AR ALUMĪNIJA SAKAUSĒJUMA VIRVI (ZTAL) — AR ALUMĪNIJA SAKAUSĒJUMA VADU (ACI) 22,75 MM), UZSTĀDOT TEHNOLOĢISKI PROGRESĪVUS KOMPONENTUS, PIEMĒRAM, FASORA MĒRVIENĪBU KATANZARO, KALIZIJĀ UN MUKONĀ, UN (JAUNĀS PAAUDZES) AUGU TRANSFORMATORA UZSTĀDĪŠANU KATANZARO RŪPNĪCĀ. (Latvian)
    5 July 2022
    0 references
    ТОЗИ ПРОЕКТ Е СВЪРЗАН С АДАПТИРАНЕТО НА ТРАНСПОРТНАТА ЛИНИЯ 150 KV SIMERI-CATANZARO ЧРЕЗ ПОДМЯНА НА ПРОВОДНИЦИ С ВЪЖЕ ОТ АЛУМИНИЕВА СПЛАВ (ZTAL) — С КАБЕЛ ОТ АЛУМИНИЕВА СПЛАВ (ACI) — 22,75 MM), ИНСТАЛИРАНЕ НА ТЕХНОЛОГИЧНО НАПРЕДНАЛИ КОМПОНЕНТИ КАТО ИЗМЕРВАТЕЛНА ЕДИНИЦА ЗА ФАЗОРИ В КАТАНЗАРО, КАЛУЗИЯ И МУКОНЕ И ИНСТАЛИРАНЕ НА ТРАНСФОРМАТОР (ОТ НОВО ПОКОЛЕНИЕ) В ЦЕНТРАЛАТА В КАТАНЗАРО. (Bulgarian)
    5 July 2022
    0 references
    EZ A PROJEKT A 150 KV-OS SIMERI-CATANZARO SZÁLLÍTÓVEZETÉK ÁTALAKÍTÁSÁRA IRÁNYUL, A VEZETÉKEK ALUMÍNIUMÖTVÖZET KÖTÉLLEL (ZTAL) VALÓ CSERÉJÉVEL – 22,75 MM ALUMÍNIUMÖTVÖZET KÁBELLEL (ACI) –, TECHNOLÓGIAILAG FEJLETT ALKATRÉSZEK, PÉLDÁUL PHASOR MÉRŐEGYSÉG TELEPÍTÉSÉVEL CATANZARO, CALUSIA ÉS MUCONE TERÜLETÉN, VALAMINT EGY (ÚJ GENERÁCIÓS) ÜZEM TRANSZFORMÁTOR TELEPÍTÉSE CATANZARO ÜZEMBEN. (Hungarian)
    5 July 2022
    0 references
    BAINEANN AN TIONSCADAL SEO LE HOIRIÚNÚ NA LÍNE IOMPAIR DE 150 KV SIMERI-CATANZARO TRÍ THÉAD CÓIMHIOTAL ALÚMANAIM (ZTAL) A CHUR IN IONAD SEOLTÓIRÍ — LE CORDA CÓIMHIOTAIL ALÚMANAIM (ACI) 22.75 MM), SUITEÁIL COMHPHÁIRTEANNA CHUN CINN Ó THAOBH NA TEICNEOLAÍOCHTA DE AMHAIL AONAD TOMHAIS PHASOR I CATANZARO, CALUSIA AGUS MUCONE AGUS CLAOCHLADÁN PLANDAÍ (GLÚIN NUA) A SHUITEÁIL I NGLÉASRA CATANZARO. (Irish)
    5 July 2022
    0 references
    DETTA PROJEKT AVSER ANPASSNING AV TRANSPORTLINJEN PÅ 150 KV SIMERI-CATANZARO GENOM ATT ERSÄTTA LEDARE MED EN REP AV ALUMINIUMLEGERING (ZTAL) – MED EN ALUMINIUMLEGERINGSSLADD (ACI) PÅ 22,75 MM), INSTALLATION AV TEKNISKT AVANCERADE KOMPONENTER SÅSOM FASORMÄTENHET I CATANZARO, CALUSIA OCH MUCONE OCH INSTALLATION AV EN (NY GENERATION) TRANSFORMATOR I CATANZARO-ANLÄGGNINGEN. (Swedish)
    5 July 2022
    0 references
    PROJEKT ON SEOTUD 150 KV SIMERI-CATANZARO TRANSPORDILIINI KOHANDAMISEGA, ASENDADES JUHTMED ALUMIINIUMISULAMIST KÖIEGA (ZTAL) – ALUMIINIUMISULAMIST NÖÖRIGA (ACI) 22,75 MM), TEHNOLOOGILISELT ARENENUD KOMPONENTIDE PAIGALDAMISEGA, NAGU FAASORI MÕÕTÜHIK CATANZAROS, CALUSIAS JA MUCONES, NING (UUE PÕLVKONNA) TEHASE TRAFO PAIGALDAMISEGA CATANZARO TEHASESSE. (Estonian)
    5 July 2022
    0 references
    SIMERI CRICHI
    0 references
    8 April 2023
    0 references

    Identifiers

    G83G17000840007
    0 references