PROJECT FOR THE EXECUTION OF A FLOATING PHOTOVOLTAIC SOLAR INSTALLATION IN THE LOWER RESERVOIR OF TORRELAGUNA (Q4685462): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en)
(‎Changed label, description and/or aliases in pt)
 
(5 intermediate revisions by 2 users not shown)
label / ptlabel / pt
PROJETO PARA A EXECUÇÃO DE UMA INSTALAÇÃO SOLAR FOTOVOLTAICA FLUTUANTE NO RESERVATÓRIO INFERIOR DE TORRELAGUNA
PROJECTO DE EXECUÇÃO DE UMA INSTALAÇÃO SOLAR FOTOVOLTÁTICA FLUTUANTE NO RESERVADOR BAIXO DE TORRELAGUNA
Property / location (string)
28151 Torrelaguna
 
Property / location (string): 28151 Torrelaguna / rank
Normal rank
 
Property / coordinate location
40°29'20.26"N, 3°22'27.41"W
Latitude40.4889639
Longitude-3.3742756
Precision1.0E-5
Globehttp://www.wikidata.org/entity/Q2
 
Property / coordinate location: 40°29'20.26"N, 3°22'27.41"W / rank
Normal rank
 
Property / coordinate location: 40°29'20.26"N, 3°22'27.41"W / qualifier
 
Property / contained in NUTS
 
Property / contained in NUTS: Madrid / rank
Normal rank
 
Property / budget
2,289,491.0 Euro
Amount2,289,491.0 Euro
UnitEuro
 
Property / budget: 2,289,491.0 Euro / rank
Preferred rank
 
Property / EU contribution
1,144,745.5 Euro
Amount1,144,745.5 Euro
UnitEuro
 
Property / EU contribution: 1,144,745.5 Euro / rank
Preferred rank
 
Property / co-financing rate
50.0 percent
Amount50.0 percent
Unitpercent
 
Property / co-financing rate: 50.0 percent / rank
Normal rank
 
Property / summary: Execution of the construction works of a photovoltaic plant on a floating structure in the lower reservoir of Torrelaguna with the aim of increasing the energy production capacity of Canal de Isabel II, S.A. and, also, contribute to the reduction of evaporation of water from the reservoir. Subsequently, an R & D & I project will be carried out to test the conditions of maintenance, anchoring, resistance and affection to the aquatic environment, in order to establish the appropriate criteria for the design and execution of this type of installations on the water sheet of reservoirs. (English) / qualifier
 
readability score: 0.2314739451420317
Amount0.2314739451420317
Unit1
Property / summaryProperty / summary
Execução das obras de construção de uma fábrica fotovoltaica numa estrutura flutuante no reservatório inferior de Torrelaguna com o objetivo de aumentar a capacidade de produção de energia do Canal de Isabel II, S.A. e, também, contribuir para a redução da evaporação da água do reservatório. Posteriormente, será realizado um projeto de I & D & I para testar as condições de manutenção, ancoragem, resistência e afeto ao meio aquático, a fim de estabelecer os critérios adequados para a conceção e execução deste tipo de instalações na folha de água dos reservatórios. (Portuguese)
Execução das obras de construção de uma central fotovoltaica numa estrutura flutuante na albufeira inferior de Torrelaguna com o objetivo de aumentar a capacidade de produção de energia do Canal de Isabel II, S.A. e, também, contribuir para a redução da evaporação da água da albufeira. Posteriormente, será realizado um projeto de I & D & I para testar as condições de manutenção, ancoragem, resistência e afetividade ao meio aquático, a fim de estabelecer os critérios adequados para a conceção e execução deste tipo de instalações na folha de água dos reservatórios. (Portuguese)
Property / location (string)
 
Torrelaguna
Property / location (string): Torrelaguna / rank
 
Normal rank
Property / contained in NUTS
 
Property / contained in NUTS: Madrid / rank
 
Normal rank
Property / contained in NUTS: Madrid / qualifier
 
Property / contained in Local Administrative Unit
 
Property / contained in Local Administrative Unit: Torrelaguna / rank
 
Normal rank
Property / coordinate location
 
40°49'22.33"N, 3°32'48.98"W
Latitude40.822868015635
Longitude-3.5469445393049
Precision1.0E-5
Globehttp://www.wikidata.org/entity/Q2
Property / coordinate location: 40°49'22.33"N, 3°32'48.98"W / rank
 
Normal rank
Property / coordinate location: 40°49'22.33"N, 3°32'48.98"W / qualifier
 
Property / budget
 
2,289,491.0 Euro
Amount2,289,491.0 Euro
UnitEuro
Property / budget: 2,289,491.0 Euro / rank
 
Preferred rank
Property / EU contribution
 
2,289,491.0 Euro
Amount2,289,491.0 Euro
UnitEuro
Property / EU contribution: 2,289,491.0 Euro / rank
 
Preferred rank
Property / co-financing rate
 
100.0 percent
Amount100.0 percent
Unitpercent
Property / co-financing rate: 100.0 percent / rank
 
Normal rank
Property / date of last update
 
21 December 2023
Timestamp+2023-12-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / date of last update: 21 December 2023 / rank
 
Normal rank

Latest revision as of 03:46, 12 October 2024

Project Q4685462 in Spain
Language Label Description Also known as
English
PROJECT FOR THE EXECUTION OF A FLOATING PHOTOVOLTAIC SOLAR INSTALLATION IN THE LOWER RESERVOIR OF TORRELAGUNA
Project Q4685462 in Spain

    Statements

    0 references
    2,289,491.0 Euro
    0 references
    2,289,491.0 Euro
    0 references
    100.0 percent
    0 references
    21 July 2022
    0 references
    31 December 2023
    0 references
    CANAL DE ISABEL II S.A.
    0 references
    0 references
    0 references

    40°49'22.33"N, 3°32'48.98"W
    0 references
    Ejecución de las obras de construcción de una planta fotovoltaica sobre una estructura flotante en el depósito inferior de Torrelaguna con el objetivo de aumentar la capacidad de producción de energía del Canal de Isabel II, S.A. y, asimismo, contribuir a la reducción de la evaporación del agua del depósito. Posteriormente se realizará un proyecto de I+D+i que permita testar las condiciones de mantenimiento, anclajes, resistencia y afección al medio acuático, con el fin de establecer los criterios adecuados para el diseño y ejecución de este tipo de instalaciones sobre la lámina de agua de embalses. (Spanish)
    0 references
    Udførelse af opførelsen af et solcelleanlæg på en flydende struktur i det nedre reservoir i Torrelaguna med det formål at øge energiproduktionskapaciteten i Canal de Isabel II, S.A. og også bidrage til at reducere fordampning af vand fra reservoiret. Efterfølgende vil der blive gennemført et F & U & I-projekt med henblik på at teste betingelserne for vedligeholdelse, forankring, modstand og påvirkning af vandmiljøet med henblik på at fastlægge passende kriterier for konstruktion og udførelse af denne type anlæg på reservoirets vandlag. (Danish)
    0 references
    Oibreacha tógála gléasra fótavoltach a chur i gcrích ar struchtúr snámhach i dtaiscumar íochtarach Torrelaguna agus é mar aidhm leis cumas táirgthe fuinnimh Canal de Isabel II, S.A. a mhéadú agus, chomh maith leis sin, cur le galú uisce ón taiscumar a laghdú. Ina dhiaidh sin, cuirfear tionscadal T & F & N i gcrích chun dálaí cothabhála, ancaireachta, friotaíochta agus gean don chomhshaol uisceach a thástáil, d’fhonn na critéir iomchuí a bhunú chun suiteálacha den chineál sin a dhearadh agus a chur i gcrích ar leathán uisce taiscumar. (Irish)
    0 references
    Izvedba gradbenih del fotovoltaične elektrarne na plavajoči konstrukciji v spodnjem rezervoarju Torrelaguna z namenom povečanja zmogljivosti proizvodnje energije Canal de Isabel II, S.A. in tudi k zmanjšanju izhlapevanja vode iz rezervoarja. Nato bo izveden projekt R & R & I, s katerim se bodo preskusili pogoji vzdrževanja, sidranje, odpornost in naklonjenost vodnemu okolju, da bi se določila ustrezna merila za načrtovanje in izvedbo te vrste naprav na vodni plošči rezervoarjev. (Slovenian)
    0 references
    Torrelaguna alumises veehoidlas ujuva struktuuriga fotogalvaanilise tehase ehitustööde teostamine eesmärgiga suurendada Canal de Isabel II, S.A. energiatootmisvõimsust ja aidata vähendada vee aurustumist veehoidlast. Seejärel viiakse läbi teadus- ja arendustegevuse ning innovatsiooni projekt, et katsetada hooldus-, ankurdamis-, resistentsus- ja kiindumust veekeskkonnale, et kehtestada asjakohased kriteeriumid seda tüüpi rajatiste projekteerimiseks ja teostamiseks reservuaaride veeplaadil. (Estonian)
    0 references
    Изпълнението на строителните работи на фотоволтаична централа на плаваща конструкция в долния резервоар на Торелагуна с цел увеличаване на капацитета за производство на енергия на Canal de Isabel II, S.A. и също така допринася за намаляване на изпаряването на водата от резервоара. Впоследствие ще бъде осъществен проект за НИРДИ, за да се тестват условията за поддръжка, закотвяне, устойчивост и привързаност към водната среда, за да се установят подходящи критерии за проектиране и изпълнение на този тип инсталации върху водния лист на резервоарите. (Bulgarian)
    0 references
    Uitvoering van de bouwwerken van een fotovoltaïsche installatie op een drijvende structuur in het onderste reservoir van Torrelaguna met als doel de energieproductiecapaciteit van Canal de Isabel II, S.A. te vergroten en ook bij te dragen tot de vermindering van de verdamping van water uit het reservoir. Vervolgens zal een O & O & I-project worden uitgevoerd om de voorwaarden voor onderhoud, verankering, weerstand en genegenheid voor het aquatisch milieu te testen, teneinde passende criteria vast te stellen voor het ontwerp en de uitvoering van dit soort installaties op de waterplaat van reservoirs. (Dutch)
    0 references
    Execution of the construction works of a photovoltaic plant on a floating structure in the lower reservoir of Torrelaguna with the aim of increasing the energy production capacity of Canal de Isabel II, S.A. and, also, contribute to the reduction of evaporation of water from the reservoir. Subsequently, an R & D & I project will be carried out to test the conditions of maintenance, anchoring, resistance and affection to the aquatic environment, in order to establish the appropriate criteria for the design and execution of this type of installations on the water sheet of reservoirs. (English)
    0.2314739451420317
    0 references
    Réalisation des travaux de construction d’une centrale photovoltaïque sur une structure flottante dans le réservoir inférieur de Torrelaguna dans le but d’augmenter la capacité de production d’énergie du Canal de Isabel II, S.A. et, également, de contribuer à la réduction de l’évaporation de l’eau du réservoir. Par la suite, un projet de R & D & I sera réalisé pour tester les conditions d’entretien, d’ancrage, de résistance et d’affection pour le milieu aquatique, afin d’établir les critères appropriés pour la conception et l’exécution de ce type d’installations sur la feuille d’eau des réservoirs. (French)
    0 references
    Izvođenje građevinskih radova fotonaponskog postrojenja na plutajućoj konstrukciji u donjem rezervoaru Torrelagune s ciljem povećanja kapaciteta za proizvodnju energije kanala Isabel II, S.A. te također doprinijeti smanjenju isparavanja vode iz spremnika. Nakon toga provest će se projekt istraživanja, razvoja i inovacija kako bi se ispitali uvjeti održavanja, sidrenja, otpornosti i privrženosti vodenom okolišu, kako bi se utvrdili odgovarajući kriteriji za projektiranje i izvođenje ove vrste postrojenja na vodnom listu spremnika. (Croatian)
    0 references
    L-eżekuzzjoni tax-xogħlijiet ta’ kostruzzjoni ta’ impjant fotovoltajku fuq struttura li żżomm f’wiċċ l-ilma fil-ġibjun t’isfel ta’ Torrelaguna bil-għan li tiżdied il-kapaċità tal-produzzjoni tal-enerġija tal-Canal de Isabel II, S.A. u, ukoll, tikkontribwixxi għat-tnaqqis tal-evaporazzjoni tal-ilma mill-ġibjun. Sussegwentement, se jitwettaq proġett ta’ R & Ż & I biex jiġu ttestjati l-kundizzjonijiet tal-manutenzjoni, l-ankraġġ, ir-reżistenza u l-affezzjoni fuq l-ambjent akkwatiku, sabiex jiġu stabbiliti l-kriterji xierqa għad-disinn u l-eżekuzzjoni ta’ dan it-tip ta’ installazzjonijiet fuq il-folja tal-ilma tal-ġibjuni. (Maltese)
    0 references
    Εκτέλεση των κατασκευαστικών εργασιών φωτοβολταϊκού σταθμού πλωτής κατασκευής στην κατώτερη δεξαμενή Torrelaguna με σκοπό την αύξηση της παραγωγικής ικανότητας της Canal de Isabel II, Α.Ε. και, επίσης, τη μείωση της εξάτμισης του νερού από τη δεξαμενή. Στη συνέχεια, θα πραγματοποιηθεί έργο ΕΑΚ για τη δοκιμή των συνθηκών συντήρησης, αγκύρωσης, αντοχής και τρυφερότητας στο υδάτινο περιβάλλον, προκειμένου να καθοριστούν τα κατάλληλα κριτήρια για τον σχεδιασμό και την εκτέλεση αυτού του τύπου εγκαταστάσεων στο υδατοφύλλο των ταμιευτήρων. (Greek)
    0 references
    Esecuzione dei lavori di costruzione di un impianto fotovoltaico su una struttura galleggiante nel serbatoio inferiore di Torrelaguna con l'obiettivo di aumentare la capacità produttiva di energia del Canal de Isabel II, S.A. e, inoltre, contribuire alla riduzione dell'evaporazione dell'acqua dal serbatoio. Successivamente, verrà realizzato un progetto di R & S & I per testare le condizioni di manutenzione, ancoraggio, resistenza e affetto all'ambiente acquatico, al fine di stabilire i criteri appropriati per la progettazione e l'esecuzione di questo tipo di impianti sulla lamiera d'acqua dei serbatoi. (Italian)
    0 references
    Realizácia stavebných prác fotovoltického závodu na plávajúcej konštrukcii v dolnej nádrži Torrelaguna s cieľom zvýšiť kapacitu výroby energie Canal de Isabel II, S.A. a tiež prispieť k zníženiu odparovania vody z nádrže. Následne sa uskutoční projekt výskumu, vývoja a inovácií s cieľom otestovať podmienky údržby, ukotvenia, odolnosti a náklonnosti k vodnému prostrediu s cieľom stanoviť vhodné kritériá pre projektovanie a realizáciu tohto typu zariadení na vodonosných nádržiach. (Slovak)
    0 references
    Fotovoltaikus erőmű építése a Torrelaguna alsó víztározójában lebegő szerkezeten azzal a céllal, hogy növelje a Canal de Isabel II, S.A. energiatermelési kapacitását, és hozzájáruljon a tartályból származó víz elpárolgásának csökkentéséhez. Ezt követően K+F+I projektre kerül sor a karbantartás, a horgonyzás, az ellenálló képesség és a vízi környezethez való ragaszkodás feltételeinek tesztelése céljából, annak érdekében, hogy megállapítsák az ilyen típusú létesítmények tervezésére és végrehajtására vonatkozó megfelelő kritériumokat a tározók vízlapján. (Hungarian)
    0 references
    Utförande av byggnadsarbeten av en solcellsanläggning på en flytande konstruktion i Torrelagunas nedre reservoar i syfte att öka kapaciteten för energiproduktion i Canal de Isabel II, S.A. och även bidra till att minska avdunstningen av vatten från reservoaren. Därefter kommer ett FoUI-projekt att genomföras för att testa villkoren för underhåll, förankring, motståndskraft och tillgivenhet i vattenmiljön, i syfte att fastställa lämpliga kriterier för utformning och utförande av denna typ av anläggningar på vattenytan i reservoarer. (Swedish)
    0 references
    Provedení stavebních prací fotovoltaické elektrárny na plovoucí konstrukci v dolní nádrži Torrelaguna s cílem zvýšit kapacitu výroby energie Canal de Isabel II, S.A. a také přispět ke snížení odpařování vody z nádrže. Následně bude proveden projekt VaVaI s cílem otestovat podmínky údržby, kotvení, odolnosti a náklonnosti k vodnímu prostředí s cílem stanovit vhodná kritéria pro návrh a realizaci tohoto typu zařízení na vodním listu nádrží. (Czech)
    0 references
    Execução das obras de construção de uma central fotovoltaica numa estrutura flutuante na albufeira inferior de Torrelaguna com o objetivo de aumentar a capacidade de produção de energia do Canal de Isabel II, S.A. e, também, contribuir para a redução da evaporação da água da albufeira. Posteriormente, será realizado um projeto de I & D & I para testar as condições de manutenção, ancoragem, resistência e afetividade ao meio aquático, a fim de estabelecer os critérios adequados para a conceção e execução deste tipo de instalações na folha de água dos reservatórios. (Portuguese)
    0 references
    Fotoelementu rūpnīcas celtniecības darbu veikšana uz peldošās konstrukcijas Torrelaguna apakšējā rezervuārā ar mērķi palielināt Canal de Isabel II, S.A. enerģijas ražošanas jaudu, kā arī veicināt ūdens iztvaikošanas samazināšanu no rezervuāra. Pēc tam tiks īstenots P & A & I projekts, lai pārbaudītu uzturēšanas, noenkurošanas, izturības un pieķeršanās ūdens videi apstākļus, lai noteiktu piemērotus kritērijus šāda veida iekārtu projektēšanai un izpildei rezervuāru ūdens plūsmā. (Latvian)
    0 references
    Ausführung der Bauarbeiten einer Photovoltaikanlage auf einer schwimmenden Struktur im unteren Reservoir von Torrelaguna mit dem Ziel, die Energieproduktionskapazität des Canal de Isabel II, S.A. zu erhöhen und auch zur Verringerung der Verdunstung von Wasser aus dem Reservoir beizutragen. Anschließend wird ein F & E & I-Projekt durchgeführt, um die Bedingungen der Instandhaltung, Verankerung, Beständigkeit und Zuneigung gegenüber der aquatischen Umwelt zu prüfen, um die geeigneten Kriterien für die Auslegung und Ausführung dieser Art von Anlagen auf dem Wasserschild von Reservoiren festzulegen. (German)
    0 references
    Fotovoltinės elektrinės statybos darbai ant plūduriuojančio statinio Torrelagunos apatiniame rezervuare, siekiant padidinti Canal de Isabel II, S.A. energijos gamybos pajėgumus, taip pat prisidėti prie vandens garavimo iš rezervuaro mažinimo. Vėliau bus vykdomas MTTV ir naujovių diegimo projektas, siekiant patikrinti techninės priežiūros, inkaravimo, atsparumo ir poveikio vandens aplinkai sąlygas, kad būtų nustatyti tinkami tokio tipo įrenginių projektavimo ir vykdymo ant rezervuarų vandens telkinių kriterijai. (Lithuanian)
    0 references
    Executarea lucrărilor de construcție a unei instalații fotovoltaice pe o structură plutitoare în rezervorul inferior al Torrelaguna, cu scopul de a crește capacitatea de producție de energie a Canalului de Isabel II, S.A. și, de asemenea, de a contribui la reducerea evaporării apei din rezervor. Ulterior, se va realiza un proiect de C & D & I pentru a testa condițiile de întreținere, ancorare, rezistență și afecțiune față de mediul acvatic, în vederea stabilirii criteriilor adecvate pentru proiectarea și executarea acestui tip de instalații pe fișa de apă a rezervoarelor. (Romanian)
    0 references
    Torrelagunan alemman säiliön kelluvassa rakenteessa olevan aurinkosähkölaitoksen rakennustöiden toteuttaminen tavoitteena lisätä Canal de Isabel II: n energiantuotantokapasiteettia ja edistää myös veden haihtumisen vähentämistä säiliöstä. Tämän jälkeen toteutetaan T & K & I-hanke, jossa testataan vesiympäristöön kohdistuvia huolto-, ankkurointi-, kestävyys- ja kiintymyksiä, jotta voidaan vahvistaa asianmukaiset kriteerit tämäntyyppisten laitteistojen suunnittelulle ja toteuttamiselle säiliöiden vesikerroksessa. (Finnish)
    0 references
    Torrelaguna
    0 references
    21 December 2023
    0 references

    Identifiers

    CYII/20/13i/002-22
    0 references