Highway D3, construction 0309/II Ševětín – Borek (Q72376): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed label, description and/or aliases in pt)
 
(6 intermediate revisions by 2 users not shown)
label / ptlabel / pt
Autoestrada D3, construção 0309/II Ševětín Borek
Autoestrada D3, construção 0309/II Ševětín Borek
Property / summary: The project is the construction of the D3 motorway in section 0309/II Ševětín – Borek. It is an extension of the existing road I/3, which has already been built as a half-profile motorway, to the motorway profile of category D 27,5/120 10.680 km long. The construction of the D3 motorway will significantly improve traffic flow and increase traffic safety. From an environmental point of view, continuous operation will reduce total traffic emissions in the vicinity of the existing road. (English) / qualifier
 
readability score: 0.5786235499377873
Amount0.5786235499377873
Unit1
Property / summaryProperty / summary
O projeto é a construção da autoestrada D3 na secção 0309/II Ševětín — Borek. Trata-se de uma extensão da estrada I/3 existente, que já foi construída como uma autoestrada semiperfileira, até ao perfil de autoestrada da categoria D 27,5/120 10,680 km. A construção da autoestrada D3 melhorará significativamente o fluxo de tráfego e aumentará a segurança do tráfego. Do ponto de vista ambiental, o funcionamento contínuo reduzirá as emissões totais do tráfego nas proximidades da estrada existente. (Portuguese)
O projeto consiste na construção da autoestrada D3 no troço 0309/II Ševětín – Borek. Trata-se de uma extensão da estrada existente I/3, que já foi construída como uma auto-estrada semi-perfil, para o perfil da auto-estrada da categoria D 27,5/120 10,680 km de comprimento. A construção da autoestrada D3 melhorará significativamente o fluxo de tráfego e aumentará a segurança do tráfego. Do ponto de vista ambiental, o funcionamento contínuo reduzirá as emissões totais do tráfego na proximidade da estrada existente. (Portuguese)
Property / coordinate location: 50°2'57.91"N, 14°26'32.86"E / qualifier
 
Property / EU contribution
907,441,408.54 Czech koruna
Amount907,441,408.54 Czech koruna
UnitCzech koruna
 
Property / EU contribution: 907,441,408.54 Czech koruna / rank
Normal rank
 
Property / EU contribution
36,297,656.34 Euro
Amount36,297,656.34 Euro
UnitEuro
 
Property / EU contribution: 36,297,656.34 Euro / rank
Preferred rank
 
Property / EU contribution: 36,297,656.34 Euro / qualifier
exchange rate to Euro: 0.04 Euro
Amount0.04 Euro
UnitEuro
 
Property / EU contribution: 36,297,656.34 Euro / qualifier
point in time: 10 January 2020
Timestamp+2020-01-10T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / co-financing rate
59.5 percent
Amount59.5 percent
Unitpercent
 
Property / co-financing rate: 59.5 percent / rank
Normal rank
 
Property / contained in NUTS: Prague / qualifier
 
Property / budget
1,067,578,127.7 Czech koruna
Amount1,067,578,127.7 Czech koruna
UnitCzech koruna
 
Property / budget: 1,067,578,127.7 Czech koruna / rank
Normal rank
 
Property / budget
43,770,703.2357 Euro
Amount43,770,703.2357 Euro
UnitEuro
 
Property / budget: 43,770,703.2357 Euro / rank
Normal rank
 
Property / contained in Local Administrative Unit
 
Property / contained in Local Administrative Unit: Praha / rank
 
Normal rank
Property / contained in Local Administrative Unit: Praha / qualifier
 
Property / budget
 
1,067,578,100.0 Czech koruna
Amount1,067,578,100.0 Czech koruna
UnitCzech koruna
Property / budget: 1,067,578,100.0 Czech koruna / rank
 
Normal rank
Property / budget
 
43,770,704.0 Euro
Amount43,770,704.0 Euro
UnitEuro
Property / budget: 43,770,704.0 Euro / rank
 
Preferred rank
Property / EU contribution
 
907,441,400.0 Czech koruna
Amount907,441,400.0 Czech koruna
UnitCzech koruna
Property / EU contribution: 907,441,400.0 Czech koruna / rank
 
Normal rank
Property / EU contribution
 
37,205,100.0 Euro
Amount37,205,100.0 Euro
UnitEuro
Property / EU contribution: 37,205,100.0 Euro / rank
 
Preferred rank
Property / co-financing rate
 
85.0 percent
Amount85.0 percent
Unitpercent
Property / co-financing rate: 85.0 percent / rank
 
Normal rank
Property / date of last update
 
22 December 2023
Timestamp+2023-12-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / date of last update: 22 December 2023 / rank
 
Normal rank

Latest revision as of 13:07, 13 October 2024

Project Q72376 in Czech Republic
Language Label Description Also known as
English
Highway D3, construction 0309/II Ševětín – Borek
Project Q72376 in Czech Republic

    Statements

    0 references
    907,441,400.0 Czech koruna
    0 references
    37,205,100.0 Euro
    0 references
    1,067,578,100.0 Czech koruna
    0 references
    43,770,704.0 Euro
    0 references
    85.0 percent
    0 references
    13 December 2016
    0 references
    8 September 2021
    0 references
    18 August 2021
    0 references
    Ředitelství silnic a dálnic ČR
    0 references
    0 references

    50°2'57.91"N, 14°26'32.86"E
    0 references
    14000
    0 references
    Předmětem projektu je výstavba dálnice D3 v úseku 0309/II Ševětín - Borek. Jedná se o rozšíření stávající silnice I/3, která již byla vybudována jako poloviční profil dálnice, na dálniční profil kategorie D 27,5/120 v délce 10,680 km. Realizací výstavby dálnice D3 dojde k podstatnému zlepšení plynulosti dopravy a zvýšení bezpečnosti provozu. Z hlediska životního prostředí, plynulým provozem dojde ke snížení celkových emisí z dopravy v okolí stávající komunikace. (Czech)
    0 references
    The project is the construction of the D3 motorway in section 0309/II Ševětín – Borek. It is an extension of the existing road I/3, which has already been built as a half-profile motorway, to the motorway profile of category D 27,5/120 10.680 km long. The construction of the D3 motorway will significantly improve traffic flow and increase traffic safety. From an environmental point of view, continuous operation will reduce total traffic emissions in the vicinity of the existing road. (English)
    23 October 2020
    0.5786235499377873
    0 references
    Le projet a pour objet la construction de l’autoroute D3 dans la section 0309/II Ševětín — Borek. Il s’agit de l’extension de la route existante I/3, qui a déjà été construite en tant que demi-profil de l’autoroute, jusqu’au profil d’autoroute de la catégorie D 27.5/120 d’une longueur de 10,680 km. La mise en œuvre de la construction de l’autoroute D3 améliorera considérablement la circulation et la sécurité. Du point de vue environnemental, le bon fonctionnement permettra de réduire les émissions totales des transports autour de la route existante. (French)
    29 November 2021
    0 references
    Gegenstand des Projekts ist der Bau der Autobahn D3 in Abschnitt 0309/II Ševětín – Borek. Dies ist die Erweiterung der bestehenden Straße I/3, die bereits als Halbprofil der Autobahn gebaut wurde, um das Autobahnprofil der Kategorie D 27.5/120 mit einer Länge von 10,680 km. Der Bau der Autobahn D3 wird den Verkehrsfluss und die Sicherheit erheblich verbessern. Aus ökologischer Sicht wird ein reibungsloser Betrieb die Gesamtemissionen aus dem Verkehr um die bestehende Straße verringern. (German)
    3 December 2021
    0 references
    Het project betreft de aanleg van de autosnelweg D3 in sectie 0309/II Ševětín — Borek. Dit is de uitbreiding van de bestaande weg I/3, die reeds als een half profiel van de autosnelweg is aangelegd, tot het autosnelwegprofiel van categorie D 27.5/120 met een lengte van 10,680 km. De aanleg van de autosnelweg D3 zal de verkeersstroom en de veiligheid aanzienlijk verbeteren. Vanuit milieuoogpunt zal een vlotte werking de totale emissies van het vervoer over de bestaande weg verminderen. (Dutch)
    13 December 2021
    0 references
    Oggetto del progetto è la costruzione dell'autostrada D3 nel tratto 0309/II Ševětín — Borek. Si tratta dell'estensione della strada esistente I/3, già costruita a metà profilo dell'autostrada, al profilo autostradale della categoria D 27.5/120 con una lunghezza di 10,680 km. L'attuazione della costruzione dell'autostrada D3 migliorerà notevolmente il flusso di traffico e la sicurezza. Dal punto di vista ambientale, il buon funzionamento ridurrà le emissioni totali dei trasporti lungo la strada esistente. (Italian)
    14 January 2022
    0 references
    El objeto del proyecto es la construcción de la autopista D3 en el tramo 0309/II Ševětín — Borek. Se trata de la ampliación de la carretera existente I/3, que ya se ha construido como medio perfil de la autopista, al perfil de autopista de la categoría D 27.5/120 con una longitud de 10,680 km. La puesta en marcha de la construcción de la autopista D3 mejorará significativamente el flujo del tráfico y la seguridad. Desde el punto de vista medioambiental, el buen funcionamiento reducirá las emisiones totales del transporte alrededor de la carretera existente. (Spanish)
    15 January 2022
    0 references
    Projektet er anlæg af motorvej D3 i sektion 0309/II Ševětín — Borek. Det er en udvidelse af den eksisterende vej I/3, der allerede er anlagt som en halvprofileret motorvej, til motorvejsprofilen af kategori D 27,5/120 10,680 km. Anlæggelsen af D3-motorvejen vil forbedre trafikstrømmen betydeligt og øge trafiksikkerheden. Fra et miljømæssigt synspunkt vil kontinuerlig drift reducere de samlede trafikemissioner i nærheden af den eksisterende vej. (Danish)
    25 July 2022
    0 references
    Το έργο αφορά την κατασκευή του αυτοκινητοδρόμου D3 στο τμήμα 0309/II Ševětín — Borek. Πρόκειται για μια επέκταση της υφιστάμενης οδού Ι/3, η οποία έχει ήδη κατασκευαστεί ως ημιπροφίλ αυτοκινητόδρομου, μέχρι το προφίλ αυτοκινητοδρόμου της κατηγορίας D 27,5/120 10,680 km. Η κατασκευή του αυτοκινητοδρόμου D3 θα βελτιώσει σημαντικά τη ροή της κυκλοφορίας και θα αυξήσει την ασφάλεια της κυκλοφορίας. Από περιβαλλοντική άποψη, η συνεχής λειτουργία θα μειώσει τις συνολικές εκπομπές της κυκλοφορίας κοντά στον υφιστάμενο δρόμο. (Greek)
    25 July 2022
    0 references
    Projekt je izgradnja autoceste D3 u dionici 0309/II Ševětín – Borek. Riječ je o proširenju postojeće ceste I/3, koja je već izgrađena kao poluprofilna autocesta, na profil autoceste kategorije D 27,5/120 10,680 km. Izgradnjom autoceste D3 znatno će se poboljšati protok prometa i povećati sigurnost prometa. S ekološkog stajališta, kontinuiranim radom smanjit će se ukupne emisije iz prometa u blizini postojeće ceste. (Croatian)
    25 July 2022
    0 references
    Proiectul este construirea autostrăzii D3 în secțiunea 0309/II Ševětín – Borek. Este o extindere a drumului I/3 existent, care a fost deja construit ca o autostradă pe jumătate, la profilul autostrăzii din categoria D 27,5/120 10,680 km lungime. Construcția autostrăzii D3 va îmbunătăți în mod semnificativ fluxul de trafic și va spori siguranța traficului. Din punct de vedere al mediului, exploatarea continuă va reduce emisiile totale din trafic în vecinătatea drumului existent. (Romanian)
    25 July 2022
    0 references
    Projektom je výstavba diaľnice D3 v úseku 0309/II Ševětín – Borek. Ide o rozšírenie existujúcej cesty I/3, ktorá už bola postavená ako polprofilová diaľnica, na profil diaľnice kategórie D 27,5/120 10,680 km. Výstavba diaľnice D3 výrazne zlepší dopravný tok a zvýši bezpečnosť dopravy. Z environmentálneho hľadiska nepretržitá prevádzka zníži celkové emisie z dopravy v blízkosti existujúcej cesty. (Slovak)
    25 July 2022
    0 references
    Il-proġett huwa l-kostruzzjoni tal-awtostrada D3 fit-taqsima 0309/II Ševětín — Borek. Hija estensjoni tat-triq I/3 eżistenti, li diġà nbniet bħala awtostrada nofs profil, għall-profil tal-awtostrada tal-kategorija D 27,5/120 10.680 km. Il-kostruzzjoni tal-awtostrada D3 se ttejjeb b’mod sinifikanti l-fluss tat-traffiku u żżid is-sikurezza tat-traffiku. Mil-lat ambjentali, it-tħaddim kontinwu se jnaqqas l-emissjonijiet totali tat-traffiku qrib it-triq eżistenti. (Maltese)
    25 July 2022
    0 references
    O projeto consiste na construção da autoestrada D3 no troço 0309/II Ševětín – Borek. Trata-se de uma extensão da estrada existente I/3, que já foi construída como uma auto-estrada semi-perfil, para o perfil da auto-estrada da categoria D 27,5/120 10,680 km de comprimento. A construção da autoestrada D3 melhorará significativamente o fluxo de tráfego e aumentará a segurança do tráfego. Do ponto de vista ambiental, o funcionamento contínuo reduzirá as emissões totais do tráfego na proximidade da estrada existente. (Portuguese)
    25 July 2022
    0 references
    Hanke koskee D3-moottoritien rakentamista tieosuuteen 0309/II Ševětín – Borek. Se on jatkoa olemassa olevalle tielle I/3, joka on jo rakennettu puoliprofiilisena moottoritienä, luokan D 275/120 10,680 kilometrin pituiselle moottoritieprofiilille. D3-moottoritien rakentaminen parantaa merkittävästi liikennevirtoja ja lisää liikenneturvallisuutta. Ympäristön kannalta jatkuva käyttö vähentää liikenteen kokonaispäästöjä olemassa olevan tien läheisyydessä. (Finnish)
    25 July 2022
    0 references
    Projekt polega na budowie autostrady D3 na odcinku 0309/II Ševětín – Borek. Jest to rozbudowa istniejącej drogi I/3, która została już wybudowana jako półprofilowa autostrada, do profilu autostrady kategorii D 27,5/120 10,680 km długości. Budowa autostrady D3 znacznie poprawi przepływ ruchu i zwiększy bezpieczeństwo ruchu. Z punktu widzenia środowiska ciągła eksploatacja zmniejszy całkowite emisje z ruchu w pobliżu istniejącej drogi. (Polish)
    25 July 2022
    0 references
    Projekt je gradnja avtoceste D3 v odseku 0309/II Ševětín – Borek. Gre za podaljšek obstoječe ceste I/3, ki je že bila zgrajena kot polprofilna avtocesta, do profila avtoceste kategorije D 27,5/120 10,680 km. Gradnja avtoceste D3 bo znatno izboljšala pretok prometa in povečala prometno varnost. Z okoljskega vidika se bodo z neprekinjenim obratovanjem zmanjšale skupne prometne emisije v bližini obstoječe ceste. (Slovenian)
    25 July 2022
    0 references
    Projektas – greitkelio D3 tiesimas 0309/II Ševětín – Borek ruože. Tai esamo kelio I/3, kuris jau nutiestas kaip pusprofilis greitkelis, išplėtimas iki D 27,5/120 10,680 km ilgio greitkelio profilio. Greitkelio D3 tiesimas žymiai pagerins eismo srautą ir padidins eismo saugumą. Aplinkos apsaugos požiūriu nuolatinis eksploatavimas sumažins bendrą transporto priemonių išmetamų teršalų kiekį šalia esamo kelio. (Lithuanian)
    25 July 2022
    0 references
    Projekts ir automaģistrāles D3 būvniecība 0309/II posmā Ševětín — Borek. Tas ir esošā autoceļa I/3, kas jau ir uzbūvēts kā pusprofila automaģistrāle, paplašināšana līdz D 27,5/120 10,680 km gara automaģistrāles profilam. D3 automaģistrāles būvniecība ievērojami uzlabos satiksmes plūsmu un palielinās satiksmes drošību. No vides viedokļa nepārtraukta ekspluatācija samazinās kopējās satiksmes emisijas esošā ceļa tuvumā. (Latvian)
    25 July 2022
    0 references
    Проектът е изграждането на автомагистрала D3 в участък 0309/II Ševětín — Borek. Това е разширение на съществуващия път I/3, който вече е построен като полупрофилна магистрала, до профила на магистралата от категория D 27,5/120 10,680 km. Изграждането на автомагистрала D3 значително ще подобри потока на движение и ще повиши безопасността на движението. От екологична гледна точка непрекъснатата експлоатация ще намали общите емисии от движението в близост до съществуващия път. (Bulgarian)
    25 July 2022
    0 references
    A projekt a 0309/II szakasz Ševětín – Borek D3-as autópálya megépítésére irányul. A meglévő I/3-as út meghosszabbítása, amelyet már félprofilú autópályaként építettek, a D 27,5/120 10,680 km hosszú autópálya profilig. A D3-as autópálya megépítése jelentősen javítja a forgalomáramlást és növeli a közlekedésbiztonságot. Környezetvédelmi szempontból a folyamatos üzemeltetés csökkenteni fogja a közlekedésből származó teljes kibocsátást a meglévő út közelében. (Hungarian)
    25 July 2022
    0 references
    Is é atá sa tionscadal ná mótarbhealach D3 a thógáil in alt 0309/II Ševětín — Borek. Is leathnú é ar an mbóthar reatha I/3, atá tógtha cheana féin mar mhótarbhealach leathphróifíle, go dtí próifíl mhótarbhealaigh chatagóir D 27,5/120 10.680 km ar fad. Cuirfidh tógáil mhótarbhealach D3 feabhas suntasach ar shreabhadh tráchta agus méadóidh sé sábháilteacht tráchta. Ó thaobh an chomhshaoil de, laghdóidh oibríocht leanúnach na hastaíochtaí tráchta iomlána i gcomharsanacht an bhóthair atá ann cheana. (Irish)
    25 July 2022
    0 references
    Projektet avser byggandet av motorvägen D3 i avsnitt 0309/II Ševětín – Borek. Det är en utvidgning av den befintliga väg I/3, som redan har byggts som en halvprofilerad motorväg, till motorvägsprofilen för kategori D 275/120 10,680 km lång. Byggandet av motorvägen D3 kommer att avsevärt förbättra trafikflödet och öka trafiksäkerheten. Ur miljösynpunkt kommer kontinuerlig drift att minska de totala trafikutsläppen i närheten av den befintliga vägen. (Swedish)
    25 July 2022
    0 references
    Projektiks on kiirtee D3 ehitamine punktis 0309/II Ševětín – Borek. Tegemist on juba poole profiiliga kiirteena ehitatud olemasoleva maantee I/3 laiendusega D 27,5/120 10,680 km pikkuse kiirtee profiilini. Kiirtee D3 ehitamine parandab oluliselt liiklusvoogu ja suurendab liiklusohutust. Keskkonna seisukohast vähendab pidev käitamine liikluse koguheidet olemasoleva tee läheduses. (Estonian)
    25 July 2022
    0 references
    22 December 2023
    0 references

    Identifiers

    CZ.04.2.39/0.0/0.0/15_002/0000084
    0 references