Reducing the energy intensity of the business area (Q4582015): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created a new Item)
 
(‎Changed label, description and/or aliases in pt)
 
(8 intermediate revisions by 2 users not shown)
label / ptlabel / pt
Redução da intensidade energética da área de negócio
Reduzir a intensidade energética da área de negócio
description / endescription / en
 
Project Q4582015 in Czechia
Property / contained in NUTS: South Bohemian Region / qualifier
 
Property / budget
6,293,834.0 Czech koruna
Amount6,293,834.0 Czech koruna
UnitCzech koruna
 
Property / budget: 6,293,834.0 Czech koruna / rank
Normal rank
 
Property / budget
258,047.194 Euro
Amount258,047.194 Euro
UnitEuro
 
Property / budget: 258,047.194 Euro / rank
Normal rank
 
Property / EU contribution
3,146,917.0 Czech koruna
Amount3,146,917.0 Czech koruna
UnitCzech koruna
 
Property / EU contribution: 3,146,917.0 Czech koruna / rank
Normal rank
 
Property / EU contribution
129,023.597 Euro
Amount129,023.597 Euro
UnitEuro
 
Property / EU contribution: 129,023.597 Euro / rank
Normal rank
 
Property / co-financing rate
50.0 percent
Amount50.0 percent
Unitpercent
 
Property / co-financing rate: 50.0 percent / rank
Normal rank
 
Property / summaryProperty / summary
A implementação do projeto reduzirá a intensidade energética da área de negócios graças ao isolamento, substituição de janelas, instalação de bomba de calor, fiação completa e iluminação LED. (Portuguese)
A implementação do projeto reduzirá a intensidade energética da área de negócios graças ao isolamento, à substituição de janelas, à instalação de bombas de calor, à nova fiação completa e à iluminação LED. (Portuguese)
Property / summary: The implementation of the project will reduce the energy intensity of the business area thanks to insulation, window replacement, installation of heat pump, complete new wiring and LED lighting. (English) / qualifier
 
readability score: 0.0106835142807152
Amount0.0106835142807152
Unit1
Property / contained in Local Administrative Unit
 
Property / contained in Local Administrative Unit: Dolní Bukovsko / rank
 
Normal rank
Property / contained in Local Administrative Unit: Dolní Bukovsko / qualifier
 
Property / budget
 
3,367,789.0 Czech koruna
Amount3,367,789.0 Czech koruna
UnitCzech koruna
Property / budget: 3,367,789.0 Czech koruna / rank
 
Normal rank
Property / budget
 
138,079.36 Euro
Amount138,079.36 Euro
UnitEuro
Property / budget: 138,079.36 Euro / rank
 
Preferred rank
Property / EU contribution
 
1,683,894.5 Czech koruna
Amount1,683,894.5 Czech koruna
UnitCzech koruna
Property / EU contribution: 1,683,894.5 Czech koruna / rank
 
Normal rank
Property / EU contribution
 
69,039.68 Euro
Amount69,039.68 Euro
UnitEuro
Property / EU contribution: 69,039.68 Euro / rank
 
Preferred rank
Property / co-financing rate
 
50.0 percent
Amount50.0 percent
Unitpercent
Property / co-financing rate: 50.0 percent / rank
 
Normal rank
Property / end time
 
17 December 2021
Timestamp+2021-12-17T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / end time: 17 December 2021 / rank
 
Normal rank
Property / date of last update
 
22 December 2023
Timestamp+2023-12-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / date of last update: 22 December 2023 / rank
 
Normal rank

Latest revision as of 02:21, 12 October 2024

Project Q4582015 in Czechia
Language Label Description Also known as
English
Reducing the energy intensity of the business area
Project Q4582015 in Czechia

    Statements

    0 references
    1,683,894.5 Czech koruna
    0 references
    69,039.68 Euro
    0 references
    3,367,789.0 Czech koruna
    0 references
    138,079.36 Euro
    0 references
    50.0 percent
    0 references
    3 April 2021
    0 references
    17 December 2021
    0 references
    Jan Krška
    0 references
    0 references

    49°9'48.89"N, 14°35'17.92"E
    0 references
    37365
    0 references
    Realizací projektu dojde ke snížení energetické náročnosti podnikatelského areálu, a to díky zateplení, výměně oken, instalaci tepelného čerpadla, kompletní nové elektroinstalaci a LED osvětlení. (Czech)
    0 references
    De uitvoering van het project zal de energie-intensiteit van het bedrijfsgebied verminderen dankzij isolatie, raamvervanging, installatie van warmtepomp, complete nieuwe bedrading en LED-verlichting. (Dutch)
    0 references
    Provedbom projekta smanjit će se energetski intenzitet poslovnog područja zahvaljujući izolaciji, zamjeni prozora, ugradnji toplinske crpke, kompletnom novom ožičenjem i LED rasvjetom. (Croatian)
    0 references
    Hankkeen toteuttaminen vähentää liiketoiminta-alueen energiaintensiteettiä eristyksen, ikkunanvaihdon, lämpöpumpun asennuksen, uuden johdotuksen ja LED-valaistuksen ansiosta. (Finnish)
    0 references
    L'implementazione del progetto ridurrà l'intensità energetica dell'area di business grazie all'isolamento, alla sostituzione delle finestre, all'installazione di pompa di calore, al completamento di nuovi cablaggi e all'illuminazione a LED. (Italian)
    0 references
    Projekta īstenošana samazinās biznesa zonas energointensitāti, pateicoties izolācijai, logu nomaiņai, siltumsūkņa uzstādīšanai, jaunai elektroinstalācijai un LED apgaismojumam. (Latvian)
    0 references
    Laghdóidh cur i bhfeidhm an tionscadail déine fuinnimh an limistéir ghnó a bhuíochas le insliú, athsholáthar fuinneoige, suiteáil caidéil teasa, sreangú nua a chomhlánú agus soilsiú LED. (Irish)
    0 references
    Projekti elluviimine vähendab äripiirkonna energiaintensiivsust tänu isolatsioonile, akende vahetamisele, soojuspumba paigaldamisele, uuele juhtmestikule ja LED-valgustusele. (Estonian)
    0 references
    A implementação do projeto reduzirá a intensidade energética da área de negócios graças ao isolamento, à substituição de janelas, à instalação de bombas de calor, à nova fiação completa e à iluminação LED. (Portuguese)
    0 references
    La implementación del proyecto reducirá la intensidad energética del área de negocio gracias al aislamiento, reemplazo de ventanas, instalación de bomba de calor, cableado completo e iluminación led. (Spanish)
    0 references
    The implementation of the project will reduce the energy intensity of the business area thanks to insulation, window replacement, installation of heat pump, complete new wiring and LED lighting. (English)
    0.0106835142807152
    0 references
    Izvedba projekta bo zmanjšala energetsko intenzivnost poslovnega območja zaradi izolacije, zamenjave oken, namestitve toplotne črpalke, popolne nove napeljave in LED razsvetljave. (Slovenian)
    0 references
    Projekto įgyvendinimas sumažins verslo srities energijos intensyvumą dėl izoliacijos, langų pakeitimo, šilumos siurblio įrengimo, visiškai naujų laidų ir LED apšvietimo. (Lithuanian)
    0 references
    Gennemførelsen af projektet vil reducere energiintensiteten i forretningsområdet takket være isolering, vinduesudskiftning, installation af varmepumpe, komplet nye ledninger og LED-belysning. (Danish)
    0 references
    La mise en œuvre du projet permettra de réduire l’intensité énergétique du secteur d’activité grâce à l’isolation, au remplacement des fenêtres, à l’installation de pompe à chaleur, au nouveau câblage complet et à l’éclairage LED. (French)
    0 references
    Η υλοποίηση του έργου θα μειώσει την ενεργειακή ένταση του επιχειρηματικού χώρου χάρη στη μόνωση, την αντικατάσταση παραθύρων, την εγκατάσταση αντλίας θερμότητας, την πλήρη νέα καλωδίωση και τον φωτισμό LED. (Greek)
    0 references
    A projekt megvalósítása csökkenti az üzleti terület energiaintenzitását a szigetelésnek, az ablakcserének, a hőszivattyú telepítésének, a teljes új vezetékezésnek és a LED világításnak köszönhetően. (Hungarian)
    0 references
    Die Umsetzung des Projekts wird die Energieintensität des Geschäftsbereichs durch Isolierung, Fensterwechsel, Installation der Wärmepumpe, komplette neue Verdrahtung und LED-Beleuchtung reduzieren. (German)
    0 references
    Realizácia projektu zníži energetickú náročnosť obchodnej oblasti vďaka izolácii, výmene okien, inštalácii tepelného čerpadla, kompletnej novej elektroinštalácii a LED osvetleniu. (Slovak)
    0 references
    Изпълнението на проекта ще намали енергийната интензивност на бизнес зоната благодарение на изолация, подмяна на прозорци, монтаж на термопомпа, пълно ново окабеляване и LED осветление. (Bulgarian)
    0 references
    Genomförandet av projektet kommer att minska affärsområdets energiintensitet tack vare isolering, fönsterbyte, installation av värmepump, komplett ny ledning och LED-belysning. (Swedish)
    0 references
    Implementarea proiectului va reduce intensitatea energetică a zonei de afaceri datorită izolației, înlocuirii ferestrelor, instalării pompei de căldură, cablajului complet nou și iluminatului cu LED-uri. (Romanian)
    0 references
    L-implimentazzjoni tal-proġett se tnaqqas l-intensità tal-enerġija taż-żona tan-negozju bis-saħħa tal-insulazzjoni, is-sostituzzjoni tat-twieqi, l-installazzjoni ta’ pompa tas-sħana, wajers ġodda kompluti u dawl LED. (Maltese)
    0 references
    22 December 2023
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/19_251/0022814
    0 references