9/4.5 CASTELO MECANIC ACESSION (Contracted Studies and Projects) (Q2878294): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Import item from Portugal) |
(Added qualifier: readability score (P590521): 0.0014582783095307) |
||||||||||||||
(3 intermediate revisions by 2 users not shown) | |||||||||||||||
Property / end time | |||||||||||||||
| |||||||||||||||
Property / end time: 12 February 2021 / rank | |||||||||||||||
Property / beneficiary name (string) | |||||||||||||||
Property / beneficiary name (string): MUNICÍPIO DE LEIRIA / rank | |||||||||||||||
Property / summary: The second amendment proposed by the promoter is of a temporal nature. It is intended to change the date of the end of the application, according to the deadline of execution of the contract, which has suffered a suspension of the deadline and 2 lengthenings of the deadline. (English) / qualifier | |||||||||||||||
readability score: 0.0014582783095307
| |||||||||||||||
Property / location (string) | |||||||||||||||
Property / location (string): Leiria, União das freguesias de Leiria, Pousos, Barreira e Cortes / rank | |||||||||||||||
Property / coordinate location | |||||||||||||||
| |||||||||||||||
Property / coordinate location: 39°44'14.06"N, 8°48'26.35"W / rank | |||||||||||||||
Property / contained in NUTS | |||||||||||||||
Property / contained in NUTS: Região de Leiria Subregion / rank | |||||||||||||||
Property / beneficiary | |||||||||||||||
Property / beneficiary: Q2990815 (Deleted Item) / rank | |||||||||||||||
Property / contained in Local Administrative Unit | |||||||||||||||
Property / contained in Local Administrative Unit: União das freguesias de Leiria, Pousos, Barreira e Cortes / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / thematic objective | |||||||||||||||
Property / thematic objective: Environment protection and resource efficiency / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / end time | |||||||||||||||
13 February 2022
| |||||||||||||||
Property / end time: 13 February 2022 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / location (string) | |||||||||||||||
Leiria | |||||||||||||||
Property / location (string): Leiria / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / coordinate location | |||||||||||||||
39°44'37.64"N, 8°48'25.60"W
| |||||||||||||||
Property / coordinate location: 39°44'37.64"N, 8°48'25.60"W / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / coordinate location: 39°44'37.64"N, 8°48'25.60"W / qualifier | |||||||||||||||
Property / contained in NUTS | |||||||||||||||
Property / contained in NUTS: Região de Leiria Subregion / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / beneficiary | |||||||||||||||
Property / beneficiary: MUNICÍPIO DE LEIRIA / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / beneficiary name (string) | |||||||||||||||
MUNICÍPIO DE LEIRIA | |||||||||||||||
Property / beneficiary name (string): MUNICÍPIO DE LEIRIA / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / date of last update | |||||||||||||||
14 November 2023
| |||||||||||||||
Property / date of last update: 14 November 2023 / rank | |||||||||||||||
Normal rank |
Latest revision as of 16:40, 7 March 2024
Project Q2878294 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | 9/4.5 CASTELO MECANIC ACESSION (Contracted Studies and Projects) |
Project Q2878294 in Portugal |
Statements
1,605,933.65 Euro
0 references
1,889,333.71 Euro
0 references
85.0 percent
0 references
26 January 2016
0 references
13 February 2022
0 references
MUNICÍPIO DE LEIRIA
0 references
A segunda alteração proposta pelo promotor é de natureza temporal. Pretende-se alterar a data de fim da candidatura, de acordo com o prazo de execução da empreitada, que sofreu uma suspensão do prazo e 2 prorrogações do prazo. (Portuguese)
0 references
The second amendment proposed by the promoter is of a temporal nature. It is intended to change the date of the end of the application, according to the deadline of execution of the contract, which has suffered a suspension of the deadline and 2 lengthenings of the deadline. (English)
7 July 2021
0.0014582783095307
0 references
Le deuxième amendement proposé par le promoteur est de nature temporelle. L’intention est de modifier la date de fin de la demande, conformément au délai d’exécution du contrat qui a été suspendu et à 2 prolongations du délai. (French)
4 December 2021
0 references
Die zweite vom Projektträger vorgeschlagene Änderung ist zeitlicher Natur. Beabsichtigt ist, das Enddatum des Antrags entsprechend der Frist für die Ausführung des Vertrags, die ausgesetzt wurde, und 2 Verlängerungen der Frist zu ändern. (German)
13 December 2021
0 references
Het tweede door de initiatiefnemer voorgestelde amendement is tijdelijk van aard. Het is de bedoeling de einddatum van de aanvraag te wijzigen, overeenkomstig de termijn voor de uitvoering van het contract, die is opgeschort en 2 verlengingen van de termijn. (Dutch)
18 December 2021
0 references
Il secondo emendamento proposto dal promotore ha carattere temporale. L'intenzione è di modificare la data di fine della domanda, conformemente al termine per l'esecuzione del contratto, che è stato sospeso e 2 proroghe del termine. (Italian)
17 January 2022
0 references
La segunda enmienda propuesta por el promotor es de carácter temporal. La intención es modificar la fecha de finalización de la solicitud, de conformidad con el plazo de ejecución del contrato, que ha sido suspendido y dos prórrogas del plazo. (Spanish)
20 January 2022
0 references
Projekti elluviija teine muudatusettepanek on ajalist laadi. Selle eesmärk on muuta taotluse lõppkuupäeva vastavalt lepingu täitmise tähtajale, mille tõttu tähtpäev on peatatud ja tähtaega kaks korda pikendatud. (Estonian)
29 July 2022
0 references
Antrasis projekto rengėjo pasiūlytas pakeitimas yra laikinas. Ketinama pakeisti paraiškos galiojimo pabaigos datą, atsižvelgiant į sutarties vykdymo terminą, kurio terminas buvo sustabdytas, o terminas pratęstas 2 kartus. (Lithuanian)
29 July 2022
0 references
Druga izmjena koju je predložio promotor vremenske je prirode. Svrha mu je promijeniti datum završetka prijave u skladu s rokom za izvršenje ugovora, zbog kojeg je došlo do suspenzije roka i dva produljenja roka. (Croatian)
29 July 2022
0 references
Η δεύτερη τροποποίηση που προτείνει ο ανάδοχος έχει προσωρινό χαρακτήρα. Πρόκειται να αλλάξει η ημερομηνία λήξης της αίτησης, ανάλογα με την προθεσμία εκτέλεσης της σύμβασης, η οποία έχει υποστεί αναστολή της προθεσμίας και 2 επιμήκυνση της προθεσμίας. (Greek)
29 July 2022
0 references
Druhá zmena, ktorú navrhuje navrhovateľ, má dočasný charakter. Jej cieľom je zmeniť dátum ukončenia žiadosti v súlade s lehotou na vykonanie zmluvy, ktorá bola pozastavená a 2 predĺženia lehoty. (Slovak)
29 July 2022
0 references
Hankkeen toteuttajan ehdottama toinen muutos on luonteeltaan ajallinen. Sen tarkoituksena on muuttaa hakemuksen päättymispäivää sopimuksen täytäntöönpanolle asetetun määräajan mukaan, sillä määräaika on keskeytetty ja määräaikaa on pidennetty 2. (Finnish)
29 July 2022
0 references
Druga poprawka zaproponowana przez promotora ma charakter czasowy. Ma ona na celu zmianę daty zakończenia zgłoszenia, w zależności od terminu wykonania umowy, która uległa zawieszeniu i 2 przedłużeniom terminu. (Polish)
29 July 2022
0 references
A projektgazda által javasolt második módosítás időbeli jellegű. Szándékában áll megváltoztatni a kérelem befejezésének időpontját a szerződés teljesítésének határidejétől függően, amely a határidő felfüggesztését és a határidő 2 meghosszabbítását érintette. (Hungarian)
29 July 2022
0 references
Druhá změna navržená navrhovatelem je časově omezená. Jeho účelem je změnit datum ukončení žádosti v závislosti na lhůtě pro plnění smlouvy, která utrpěla pozastavení lhůty a dvě prodloužení lhůty. (Czech)
29 July 2022
0 references
Projekta virzītāja ierosinātajam otrajam grozījumam ir pagaidu raksturs. Ir paredzēts mainīt pieteikuma beigu datumu atkarībā no līguma izpildes termiņa, kas ir ticis apturēts, un diviem termiņa pagarinājumiem. (Latvian)
29 July 2022
0 references
Is leasú de chineál ama é an dara leasú atá molta ag an tionscnóir. Tá sé beartaithe dáta dheireadh an iarratais a athrú, de réir spriocdháta forghníomhaithe an chonartha, ar cuireadh an spriocdháta ar fionraí agus dhá fhadú ar an spriocdháta ina leith. (Irish)
29 July 2022
0 references
Druga sprememba, ki jo predlaga predlagatelj, je časovno omejena. Njegov namen je spremeniti datum konca vloge v skladu z rokom za izvedbo pogodbe, zaradi katerega je bil rok prekinjen in je bil rok podaljšan za dve leti. (Slovenian)
29 July 2022
0 references
Второто изменение, предложено от организатора на проекта, има времеви характер. Целта е да се промени датата на приключване на заявлението, в зависимост от крайния срок за изпълнение на договора, който е претърпял спиране на крайния срок и 2 удължавания на срока. (Bulgarian)
29 July 2022
0 references
It-tieni emenda proposta mill-promotur hija ta’ natura temporali. Huwa maħsub li tinbidel id-data ta’ tmiem l-applikazzjoni, skont l-iskadenza tal-eżekuzzjoni tal-kuntratt, li tkun sofriet sospensjoni tal-iskadenza u 2 estensjonijiet tal-iskadenza. (Maltese)
29 July 2022
0 references
Den anden ændring, som initiativtageren har foreslået, er af tidsmæssig karakter. Det er hensigten at ændre datoen for udløbet af ansøgningen i henhold til fristen for kontraktens gennemførelse, som har været udsat for en suspension af fristen og 2 forlængelser af fristen. (Danish)
29 July 2022
0 references
Al doilea amendament propus de promotor este de natură temporală. Se intenționează modificarea datei de încheiere a cererii, în funcție de termenul de executare a contractului, care a suferit o suspendare a termenului și 2 prelungiri ale termenului. (Romanian)
29 July 2022
0 references
Den andra ändring som föreslås av den projektansvarige är av tidsmässig natur. Avsikten är att ändra datumet för ansökans slut, beroende på tidsfristen för avtalets genomförande, då tidsfristen har skjutits upp och tidsfristen förlängts två gånger. (Swedish)
29 July 2022
0 references
Leiria
0 references
14 November 2023
0 references
Identifiers
CENTRO-09-2316-FEDER-000125
0 references