REMOVAL OF FIBROCEMENT | BASIC SCHOOL DR. JOSÉ PEREIRA TAVARES, PINHEIRO DA BEMPOSTA – OLIVEIRA DE AZEMÉIS (Q2899480): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: co-financing rate (P837): 100.0 percentage)
(‎Added qualifier: readability score (P590521): 0.0038443928662899)
 
(5 intermediate revisions by 2 users not shown)
Property / end time
31 August 2021
Timestamp+2021-08-31T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / end time: 31 August 2021 / rank
Normal rank
 
Property / beneficiary name (string)
MUNICÍPIO DE OLIVEIRA DE AZEMÉIS
 
Property / beneficiary name (string): MUNICÍPIO DE OLIVEIRA DE AZEMÉIS / rank
Normal rank
 
Property / summary: This operation aims to remove and replace all existing asbestos structures in this School, complying with Order No. 6573-A/2020, of June 23. (English) / qualifier
 
readability score: 0.0038443928662899
Amount0.0038443928662899
Unit1
Property / location (string)
Oliveira de Azeméis, União das freguesias de Pinheiro da Bemposta, Travanca e Palmaz
 
Property / location (string): Oliveira de Azeméis, União das freguesias de Pinheiro da Bemposta, Travanca e Palmaz / rank
Normal rank
 
Property / coordinate location
40°47'37.57"N, 8°27'38.12"W
Latitude40.79377425
Longitude-8.4605925
Precision1.0E-5
Globehttp://www.wikidata.org/entity/Q2
 
Property / coordinate location: 40°47'37.57"N, 8°27'38.12"W / rank
Normal rank
 
Property / contained in NUTS
 
Property / contained in NUTS: Metropolitan Area of Porto / rank
Normal rank
 
Property / beneficiary
Q3000779 (Deleted Item)
 
Property / beneficiary: Q3000779 (Deleted Item) / rank
Normal rank
 
Property / budgetProperty / budget
101,805.0 Euro
Amount101,805.0 Euro
UnitEuro
101,314.14 Euro
Amount101,314.14 Euro
UnitEuro
Property / EU contributionProperty / EU contribution
101,805.0 Euro
Amount101,805.0 Euro
UnitEuro
101,314.14 Euro
Amount101,314.14 Euro
UnitEuro
Property / contained in Local Administrative Unit
 
Property / contained in Local Administrative Unit: União das freguesias de Oliveira de Azeméis, Santiago de Riba-Ul, Ul, Macinhata da Seixa e Madail / rank
 
Normal rank
Property / priority axis
 
Property / priority axis: Education and Lifelong Learning / rank
 
Normal rank
Property / co-financing rate
 
100.0 percent
Amount100.0 percent
Unitpercent
Property / co-financing rate: 100.0 percent / rank
 
Normal rank
Property / thematic objective
 
Property / thematic objective: Educational and vocational training / rank
 
Normal rank
Property / end time
 
30 April 2022
Timestamp+2022-04-30T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / end time: 30 April 2022 / rank
 
Normal rank
Property / location (string)
 
Oliveira de Azeméis
Property / location (string): Oliveira de Azeméis / rank
 
Normal rank
Property / coordinate location
 
40°50'20.44"N, 8°28'40.01"W
Latitude40.8390118
Longitude-8.4777807
Precision1.0E-5
Globehttp://www.wikidata.org/entity/Q2
Property / coordinate location: 40°50'20.44"N, 8°28'40.01"W / rank
 
Normal rank
Property / coordinate location: 40°50'20.44"N, 8°28'40.01"W / qualifier
 
Property / contained in NUTS
 
Property / contained in NUTS: Metropolitan Area of Porto / rank
 
Normal rank
Property / beneficiary
 
Property / beneficiary: MUNICÍPIO DE OLIVEIRA DE AZEMÉIS / rank
 
Normal rank
Property / beneficiary name (string)
 
MUNICÍPIO DE OLIVEIRA DE AZEMÉIS
Property / beneficiary name (string): MUNICÍPIO DE OLIVEIRA DE AZEMÉIS / rank
 
Normal rank
Property / date of last update
 
14 November 2023
Timestamp+2023-11-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / date of last update: 14 November 2023 / rank
 
Normal rank

Latest revision as of 14:27, 22 March 2024

Project Q2899480 in Portugal
Language Label Description Also known as
English
REMOVAL OF FIBROCEMENT | BASIC SCHOOL DR. JOSÉ PEREIRA TAVARES, PINHEIRO DA BEMPOSTA – OLIVEIRA DE AZEMÉIS
Project Q2899480 in Portugal

    Statements

    0 references
    101,314.14 Euro
    0 references
    101,314.14 Euro
    0 references
    100.0 percent
    0 references
    1 January 2021
    0 references
    30 April 2022
    0 references
    MUNICÍPIO DE OLIVEIRA DE AZEMÉIS
    0 references

    40°50'20.44"N, 8°28'40.01"W
    0 references
    Esta operação pretende a remoção e substituição de todas as estruturas com amianto existentes nesta Escola, dando cumprimento ao Despacho n.º 6573-A/2020, de 23 de junho. (Portuguese)
    0 references
    This operation aims to remove and replace all existing asbestos structures in this School, complying with Order No. 6573-A/2020, of June 23. (English)
    8 July 2021
    0.0038443928662899
    0 references
    Cette opération vise à enlever et à remplacer toutes les structures contenant de l’amiante dans cette école, conformément à l’arrêté no 6573-A/2020 du 23 juin. (French)
    5 December 2021
    0 references
    Ziel dieser Maßnahme ist es, alle asbesthaltigen Strukturen in dieser Schule gemäß der Verordnung Nr. 6573-A/2020 vom 23. Juni zu beseitigen und zu ersetzen. (German)
    13 December 2021
    0 references
    Deze operatie heeft tot doel alle asbesthoudende structuren in deze school te verwijderen en te vervangen, overeenkomstig Besluit nr. 6573-A/2020 van 23 juni. (Dutch)
    19 December 2021
    0 references
    L'operazione mira a rimuovere e sostituire tutte le strutture contenenti amianto presenti in questa scuola, in conformità con il decreto n. 6573-A/2020 del 23 giugno. (Italian)
    17 January 2022
    0 references
    Esta operación tiene por objeto eliminar y sustituir todas las estructuras que contienen amianto en esta escuela, de conformidad con la Orden n.º 6573-A/2020, de 23 de junio. (Spanish)
    21 January 2022
    0 references
    Selle operatsiooni eesmärk on eemaldada ja asendada kõik selles koolis olemasolevad asbestist konstruktsioonid, mis vastavad 23. juuni korraldusele nr 6573-A/2020. (Estonian)
    29 July 2022
    0 references
    Šia operacija siekiama pašalinti ir pakeisti visas esamas asbesto struktūras šioje mokykloje, laikantis birželio 23 d. įsakymo Nr. 6573-A/2020. (Lithuanian)
    29 July 2022
    0 references
    Cilj je ove operacije ukloniti i zamijeniti sve postojeće strukture azbesta u ovoj školi, u skladu s Odlukom br. 6573-A/2020 od 23. lipnja. (Croatian)
    29 July 2022
    0 references
    Η πράξη αυτή αποσκοπεί στην αφαίρεση και αντικατάσταση όλων των υφιστάμενων δομών αμιάντου σε αυτό το σχολείο, σύμφωνα με το διάταγμα αριθ. 6573-A/2020, της 23ης Ιουνίου. (Greek)
    29 July 2022
    0 references
    Cieľom tejto operácie je odstrániť a nahradiť všetky existujúce azbestové štruktúry v tejto škole v súlade s vyhláškou č. 6573-A/2020 z 23. júna. (Slovak)
    29 July 2022
    0 references
    Toimen tarkoituksena on poistaa ja korvata kaikki tämän koulun olemassa olevat asbestirakenteet 23. kesäkuuta annetun määräyksen nro 6573-A/2020 mukaisesti. (Finnish)
    29 July 2022
    0 references
    Operacja ta ma na celu usunięcie i zastąpienie wszystkich istniejących struktur azbestu w tej szkole, zgodnie z zarządzeniem nr 6573-A/2020 z dnia 23 czerwca. (Polish)
    29 July 2022
    0 references
    Ez a művelet célja, hogy távolítsa el és cserélje ki az összes meglévő azbeszt struktúrák ebben az iskolában, megfelelve a 6573-A/2020, június 23-i rendelet. (Hungarian)
    29 July 2022
    0 references
    Cílem této operace je odstranit a nahradit veškeré stávající azbestové struktury v této škole v souladu s vyhláškou č. 6573-A/2020 ze dne 23. června. (Czech)
    29 July 2022
    0 references
    Šīs operācijas mērķis ir likvidēt un aizstāt visas esošās azbesta konstrukcijas šajā skolā, ievērojot 23. jūnija rīkojumu Nr. 6573-A/2020. (Latvian)
    29 July 2022
    0 references
    Tá sé mar aidhm ag an oibríocht seo gach struchtúr aispeiste atá ann cheana sa Scoil seo a bhaint agus a athsholáthar, ag cloí le hOrdú Uimh. 6573-A/2020, an 23 Meitheamh. (Irish)
    29 July 2022
    0 references
    Cilj te operacije je odstraniti in nadomestiti vse obstoječe azbestne strukture v tej šoli, v skladu z Odredbo št. 6573-A/2020, iz junija 23. (Slovenian)
    29 July 2022
    0 references
    Тази операция има за цел да премахне и замени всички съществуващи азбестови структури в това училище, в съответствие със Заповед № 6573-A/2020 от 23 юни. (Bulgarian)
    29 July 2022
    0 references
    Din l-operazzjoni għandha l-għan li tneħħi u tissostitwixxi l-istrutturi eżistenti kollha tal-asbestos f’din l-Iskola, f’konformità mal-Ordni Nru 6573-A/2020, tat-23 ta’ Ġunju. (Maltese)
    29 July 2022
    0 references
    Formålet med denne operation er at fjerne og erstatte alle eksisterende asbeststrukturer på denne skole i overensstemmelse med bekendtgørelse nr. 6573-A/2020 af 23. juni. (Danish)
    29 July 2022
    0 references
    Această operațiune are ca scop eliminarea și înlocuirea tuturor structurilor de azbest existente în această școală, în conformitate cu Ordinul nr. 6573-A/2020 din 23 iunie. (Romanian)
    29 July 2022
    0 references
    Denna operation syftar till att avlägsna och ersätta alla befintliga asbeststrukturer i denna skola, i enlighet med order nr 6573-A/2020 av den 23 juni. (Swedish)
    29 July 2022
    0 references
    Oliveira de Azeméis
    0 references
    14 November 2023
    0 references

    Identifiers

    NORTE-08-5673-FEDER-000335
    0 references