Construction of the Integrated Interchange Centre in Imielin (Q124075): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: co-financing rate (P837): 47.68 percentage) |
(Changed label, description and/or aliases in pt) |
||||||||||||||
(9 intermediate revisions by 2 users not shown) | |||||||||||||||
label / fr | label / fr | ||||||||||||||
Construction du Centre | Construction du Centre de Transfert Intégré à Imielin | ||||||||||||||
label / de | label / de | ||||||||||||||
Bau des Integrierten | Bau des Integrierten Transferzentrums in Imielin | ||||||||||||||
label / nl | label / nl | ||||||||||||||
Bouw van het | Bouw van het Integrated Transfer Centre in Imielin | ||||||||||||||
label / it | label / it | ||||||||||||||
Costruzione del Centro Integrato | Costruzione del Centro di Trasferimento Integrato a Imielin | ||||||||||||||
label / es | label / es | ||||||||||||||
Construcción del Centro de | Construcción del Centro Integrado de Transferencia en Imielin | ||||||||||||||
label / da | label / da | ||||||||||||||
Opførelse af det integrerede | Opførelse af det integrerede transportcenter i Imielin | ||||||||||||||
label / el | label / el | ||||||||||||||
Κατασκευή | Κατασκευή Ολοκληρωμένου Κέντρου Μεταφοράς στο Imielin | ||||||||||||||
label / hr | label / hr | ||||||||||||||
Izgradnja Integriranog | Izgradnja Integriranog transfernog centra u Imielinu | ||||||||||||||
label / ro | label / ro | ||||||||||||||
Construirea Centrului Integrat | Construirea Centrului de Transfer Integrat din Imielin | ||||||||||||||
label / sk | label / sk | ||||||||||||||
Výstavba | Výstavba Integrovaného prenosového centra v Imieline | ||||||||||||||
label / mt | label / mt | ||||||||||||||
Kostruzzjoni taċ-Ċentru Integrat | Kostruzzjoni taċ-Ċentru Integrat għat-Trasferiment f’Imielin | ||||||||||||||
label / fi | label / fi | ||||||||||||||
Integroidun | Integroidun siirtokeskuksen rakentaminen Imieliniin | ||||||||||||||
label / sl | label / sl | ||||||||||||||
Gradnja integriranega centra za | Gradnja integriranega centra za prenos v Imielinu | ||||||||||||||
label / cs | label / cs | ||||||||||||||
Výstavba integrovaného | Výstavba integrovaného přenosového střediska v Imielinu | ||||||||||||||
label / lt | label / lt | ||||||||||||||
Integruoto | Integruoto perkėlimo centro statyba Imieline | ||||||||||||||
label / lv | label / lv | ||||||||||||||
Integrētā | Integrētā transfertcentra būvniecība Imielinā | ||||||||||||||
label / bg | label / bg | ||||||||||||||
Изграждане на Интегриран | Изграждане на Интегриран трансферен център в Имилин | ||||||||||||||
label / hu | label / hu | ||||||||||||||
Integrált átviteli központ építése Imielinben | |||||||||||||||
label / ga | label / ga | ||||||||||||||
Tógáil an | Tógáil an Lárionaid Aistrithe Chomhtháite in Imielin | ||||||||||||||
label / sv | label / sv | ||||||||||||||
Byggande av det integrerade överföringscentrumet i Imielin | |||||||||||||||
label / et | label / et | ||||||||||||||
Integreeritud | Integreeritud ülekandekeskuse ehitamine Imielinis | ||||||||||||||
Property / EU contribution | Property / EU contribution | ||||||||||||||
| 191,058.77 Euro
| ||||||||||||||
Property / summary: The proposed interchange centre includes a location in the area of the railway station in Imielin, on a street. Dunikowskiego and ul. It’s Hallera. As part of stage I of the investment (area between ul. Xavier Dunikowski and the railway line covered by this proposal are planned to carry out the following work: — reconstruction of 2 existing exits from ul. Dunikowskiego, – liquidation of the existing exit from ul. Dunikowskiego, – construction and reconstruction of parking stations at ul. Dunikowskiego, – designing a passage through the street. Dunikowskiego at the height of the interchange centre, – changing the location of the existing passage through ul. Dunikowski in connection with the reconstruction of exit No. 1, – construction of internal roads, – construction of parking stations by internal roads, – construction of pavements and squares, – construction of parking stations for single-tracks, – construction of bus and bus stop stations, – construction of a commercial pavilion with public toilets, – construction of a sheltered stop. (English) / qualifier | |||||||||||||||
readability score: 0.3106709851070048
| |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Le centre de transfert prévu comprend un emplacement dans la zone de la gare d’Imielin à ul. Dunikowski et ul. Oh, Haller. Dans le cadre de l’étape I de l’investissement (zone entre ul. Les travaux suivants sont prévus par Xawery Dunikowski et la ligne de chemin de fer couverte par la présente proposition: — reconstruction de 2 sorties existantes d’ul. Dunikowski, — liquidation de la sortie existante d’ul. Dunikowski, — construction et reconstruction de stations de stationnement à ul. Dunikowski, — conception du passage par la chaussée ul. Dunikowski à la hauteur du centre de transfert, — changer l’emplacement du passage existant à travers ul. Dunikowski dans le cadre de la reconstruction de la sortie no 1, — construction de routes intérieures, — construction de stations de stationnement sur les routes intérieures, — construction de trottoirs et de places, — construction de stations de stationnement pour les deux-roues, — construction de stations d’arrêt pour autobus et autobus, — construction d’un pavillon commercial avec toilettes publiques, — construction d’un abri d’autobus. (French) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Das geplante Transferzentrum umfasst einen Standort im Bereich des Bahnhofs in Imielin bei ul. Dunikowski und ul. Oh, Haller. Als Teil der Phase I der Investition (Bereich zwischen ul. Die folgenden Arbeiten sollen von Xawery Dunikowski und der von diesem Vorschlag erfassten Eisenbahnstrecke durchgeführt werden: — Rekonstruktion von 2 bestehenden Ausgängen von ul. Dunikowski, – Liquidation des bestehenden Ausganges aus ul. Dunikowski, – Bau und Umbau von Parkhäusern bei ul. Dunikowski, – Entwurf des Durchgangs durch die Fahrbahn ul. Dunikowski auf der Höhe des Transferzentrums, – Änderung der Position des bestehenden Durchgangs durch ul. Dunikowski im Zusammenhang mit der Rekonstruktion der Ausfahrt Nr. 1, – Bau von Innenstraßen, – Bau von Parkstationen auf Innenstraßen, – Bau von Gehwegen und Plätzen, – Bau von Parkplätzen für Zweiräder, – Bau von Haltestellen für Busse und Busse, – Bau eines Gewerbepavillons mit öffentlichen Toiletten, – Bau eines Busunterstands. (German) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Het geplande transfercentrum omvat een locatie in het gebied van het station in Imielin bij ul. Dunikowski en ul. Oh, Haller. Als onderdeel van fase I van de investering (gebied tussen ul. De volgende werkzaamheden zullen worden uitgevoerd door Xawery Dunikowski en de spoorlijn waarop dit voorstel betrekking heeft: — reconstructie van 2 bestaande uitgangen uit ul. Dunikowski, — liquidatie van de bestaande uitgang uit ul. Dunikowski, — bouw en wederopbouw van parkeerstations bij ul. Dunikowski, — ontwerp van de doorgang door de weg ul. Dunikowski op de hoogte van het transfercentrum, — het veranderen van de locatie van de bestaande doorgang door ul. Dunikowski in verband met de wederopbouw van afslag nr. 1, — aanleg van interne wegen, — aanleg van parkeerstations op interne wegen, — bouw van trottoirs en pleinen, — aanleg van parkeerstations voor tweewielers, — bouw van stopstations voor bussen en bussen, — bouw van een commercieel paviljoen met openbare toiletten, — bouw van een busopvang. (Dutch) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Il centro di trasferimento previsto comprende una posizione nella zona della stazione ferroviaria di Imielin a ul. Dunikowski e ul. Oh, Haller. Nell'ambito della fase I dell'investimento (area tra ul. I seguenti lavori saranno realizzati da Xawery Dunikowski e dalla linea ferroviaria oggetto della presente proposta: — ricostruzione di 2 uscite esistenti da ul. Dunikowski, — liquidazione dell'uscita esistente da ul. Dunikowski, — costruzione e ricostruzione di stazioni di parcheggio a ul. Dunikowski, — progettazione del passaggio attraverso la carreggiata ul. Dunikowski all'altezza del centro di trasferimento, — cambiando la posizione del passaggio esistente attraverso ul. Dunikowski in connessione con la ricostruzione dell'uscita n. 1, — costruzione di strade interne, — costruzione di stazioni di parcheggio su strade interne, — costruzione di marciapiedi e piazze, — costruzione di stazioni di parcheggio per due ruote, — costruzione di stazioni di sosta per autobus e autobus, — costruzione di un padiglione commerciale con servizi igienici pubblici, — costruzione di un riparo per autobus. (Italian) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
El centro de transferencia previsto incluye una ubicación en la zona de la estación de tren en Imielin at ul. Dunikowski y ul. Oh, Haller. Como parte de la etapa I de la inversión (área entre ul. Xawery Dunikowski y la línea ferroviaria objeto de la presente propuesta tienen previsto realizar las siguientes obras: — reconstrucción de 2 salidas existentes de ul. Dunikowski, — liquidación de la salida existente de ul. Dunikowski, — construcción y reconstrucción de estaciones de aparcamiento en ul. Dunikowski, — diseño del paso a través de la carretera ul. Dunikowski a la altura del centro de transferencia, — cambiando la ubicación del paso existente a través de ul. Dunikowski en relación con la reconstrucción de la salida N.º 1, — construcción de carreteras internas, — construcción de estaciones de estacionamiento en carreteras internas, — construcción de aceras y plazas, — construcción de estaciones de estacionamiento para vehículos de dos ruedas, — construcción de estaciones de parada para autobuses y autobuses, — construcción de un pabellón comercial con baños públicos, — construcción de un refugio para autobuses. (Spanish) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Det planlagte transfercenter omfatter en placering i området af banegården i Imielin at ul. Dunikowski og ul. Åh, Haller. Som en del af fase I af investeringen (område mellem ul. Xawery Dunikowski og den jernbanelinje, der er omfattet af dette forslag, skal efter planen udføre følgende arbejder: — rekonstruktion af to eksisterende udgange fra ul. Dunikowski, — likvidation af den eksisterende exit fra ul. Dunikowski, — opførelse og genopbygning af parkeringspladser på ul. Dunikowski, — design af passagen gennem vejbanen ul. Dunikowski på højden af transfer center, — ændre placeringen af den eksisterende passage gennem ul. Dunikowski i forbindelse med rekonstruktion af exit nr. 1, — opførelse af indre veje, — opførelse af parkeringspladser på indre veje, — opførelse af fortove og pladser, — opførelse af parkeringspladser for tohjulede, — opførelse af stopstationer for busser og busser, — opførelse af en kommerciel pavillon med offentlige toiletter, — opførelse af et busly. (Danish) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Το σχεδιαζόμενο κέντρο μεταφοράς περιλαμβάνει μια θέση στην περιοχή του σιδηροδρομικού σταθμού στο Imielin στο ul. Ντάνικοβσκι και Ουλ. Ω, Χάλερ. Στο πλαίσιο του σταδίου Ι της επένδυσης (περιοχή μεταξύ ul. Οι ακόλουθες εργασίες προγραμματίζονται να εκτελεστούν από τον Xawery Dunikowski και τη σιδηροδρομική γραμμή που καλύπτεται από την παρούσα πρόταση: — ανακατασκευή 2 υπαρχουσών εξόδων από τον Ουλ. Dunikowski, — εκκαθάριση της υπάρχουσας εξόδου από τον Ουλ. Dunikowski, — κατασκευή και ανακατασκευή σταθμών στάθμευσης στο ul. Dunikowski, — σχεδιασμός του περάσματος μέσω του δρόμου ul. Dunikowski στο ύψος του κέντρου μεταφοράς, — αλλαγή της θέσης της υπάρχουσας διέλευσης μέσω ul. Dunikowski σε σχέση με την ανακατασκευή της εξόδου αριθ. 1 — κατασκευή εσωτερικών οδών, — κατασκευή σταθμών στάθμευσης σε εσωτερικούς δρόμους, — κατασκευή πεζοδρόμων και πλατειών, — κατασκευή σταθμών στάθμευσης για δίκυκλα, — κατασκευή σταθμών στάσης λεωφορείων και λεωφορείων, — κατασκευή εμπορικού περιπτέρου με δημόσιες τουαλέτες, — κατασκευή καταφυγίου λεωφορείων. (Greek) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Planirani transfer centar uključuje lokaciju na području željezničkog kolodvora u Imielinu u ul. Dunikowski i ul. Oh, Haller. Kao dio I faze ulaganja (područje između ul. Xawery Dunikowski i željeznička pruga obuhvaćena ovim prijedlogom planiraju obaviti sljedeće radove: rekonstrukcija 2 postojeća izlaza iz ul. Dunikowski, likvidacija postojećeg izlaza iz ul. Dunikowski, – izgradnja i rekonstrukcija parkirnih mjesta u Ul. Dunikowski, dizajn prolaza kroz cestu ul. Dunikowski na visini transfer centra, – promjena položaja postojećeg prolaza kroz ul. Dunikowski u vezi s rekonstrukcijom izlaza br. 1, – izgradnja unutarnjih cesta, – izgradnja parkirališnih postaja na unutarnjim cestama, – izgradnja pločnika i trgova, – izgradnja parkirnih stanica za dva kotača, – izgradnja stajališta za autobuse i autobuse, – izgradnja komercijalnog paviljona s javnim toaletima, – izgradnja autobusnog skloništa. (Croatian) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Centrul de transfer planificat include o locație în zona gării din Imielin din ul. Dunikowski și ul. Oh, Haller. Ca parte a etapei I a investiției (zona dintre ul. Următoarele lucrări sunt planificate să fie efectuate de Xawery Dunikowski și de linia de cale ferată care face obiectul prezentei propuneri: reconstrucția a 2 ieșiri existente din ul. Dunikowski, – lichidarea ieșirii existente din ul. Dunikowski, – construcția și reconstrucția stațiilor de parcare la ul. Dunikowski, – proiectarea trecerii prin drumul ul. Dunikowski la înălțimea centrului de transfer, – schimbarea locației trecerii existente prin ul. Dunikowski în legătură cu reconstrucția ieșirii nr. 1, – construcția de drumuri interne, – construcția de stații de parcare pe drumurile interne, – construcția de trotuare și piețe, – construcția de stații de parcare pentru vehicule cu două roți, – construirea de stații de oprire pentru autobuze și autobuze, – construirea unui pavilion comercial cu toalete publice, – construirea unui adăpost pentru autobuze. (Romanian) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Plánované prestupové centrum zahŕňa miesto v areáli železničnej stanice v Imieline na ul. Dunikowski a ul. Oh, Haller. Ako súčasť fázy I investície (oblasť medzi ul. Xawery Dunikowski a železničná trať, na ktorú sa vzťahuje tento návrh, majú podľa plánu vykonať tieto práce: — rekonštrukcia 2 existujúcich východov z ul. Dunikowski, – likvidácia existujúceho výstupu z ul. Dunikowski, – výstavba a rekonštrukcia parkovacích staníc ul. Dunikowski, – návrh priechodu cez cestnú cestu ul. Dunikowski vo výške transferového centra, – zmena umiestnenia existujúceho priechodu cez ul. Dunikowski v súvislosti s rekonštrukciou výjazdu č. 1, – výstavba vnútorných ciest, – výstavba parkovacích staníc na vnútorných cestách, – výstavba chodníkov a námestí, – výstavba parkovacích staníc pre dvojkolesové, – výstavba zastávok pre autobusy a autobusy, – výstavba komerčného pavilónu s verejnými toaletami, – výstavba autobusového prístrešia. (Slovak) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Iċ-ċentru ta’ trasferiment ippjanat jinkludi post fiż-żona tal-istazzjon tal-ferrovija f’Imielin ta’ ul. Dunikowski u ul. OH, Haller. Bħala parti mill-istadju I tal-investiment (żona bejn ul. Ix-xogħlijiet li ġejjin huma ppjanati li jitwettqu minn Xawery Dunikowski u l-linja ferrovjarja koperta minn din il-proposta: — rikostruzzjoni ta ' 2 ħruġ eżistenti minn ul. Dunikowski, — likwidazzjoni tal-ħruġ eżistenti minn ul. Dunikowski, — kostruzzjoni u rikostruzzjoni ta ‘stazzjonijiet ta’ parkeġġ fil ul. Dunikowski, — disinn tal-passaġġ mill-triq ul. Dunikowski fl-għoli taċ-ċentru tat-trasferiment, — biddel il-post tal-passaġġ eżistenti minn ul. Dunikowski b’rabta mar-rikostruzzjoni tal-ħruġ Nru 1, — il-kostruzzjoni ta’ toroq interni, — il-kostruzzjoni ta’ stazzjonijiet tal-parkeġġ fuq toroq interni, — il-kostruzzjoni ta’ ħitan tal-ġenb u kwadri, — il-kostruzzjoni ta’ stazzjonijiet tal-parkeġġ għal vetturi b’żewġ roti, — il-kostruzzjoni ta’ stazzjonijiet ta’ waqfien għall-karozzi tal-linja u l-karozzi tal-linja, — il-kostruzzjoni ta’ paviljun kummerċjali b’tojlits pubbliċi, — il-kostruzzjoni ta’ kenn għall-karozzi tal-linja. (Maltese) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
O centro de intercâmbio proposto inclui uma localização na área da estação ferroviária de Imielin, numa rua. Dunikowskiego e ul. É a Hallera. No âmbito da fase I do investimento (zona entre ul. Prevê-se que Xavier Dunikowski e a linha ferroviária abrangida pela presente proposta realizem os seguintes trabalhos: — reconstrução de duas saídas existentes da ul. Dunikowskiego, – liquidação da saída existente da ul. Dunikowskiego, – construção e reconstrução de parques de estacionamento em ul. Dunikowskiego, – desenho de uma passagem pela rua. Dunikowskiego na altura do centro de transferência, – alteração da localização da passagem existente através de ul. Dunikowski no âmbito da reconstrução da saída n.° 1, – construção de estradas internas, – construção de estações de estacionamento por estradas internas, – construção de pavimentos e praças, – construção de estações de estacionamento para vias únicas, – construção de estações de paragem de autocarros, – construção de um pavilhão comercial com instalações sanitárias públicas, – construção de uma paragem protegida. (Portuguese) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Suunniteltu siirtokeskus sisältää sijainnin Imielinin rautatieaseman alueella ul. Dunikowski ja ul. Niin, Haller. Osa investoinnin vaihetta I (pinta-ala ul. Xawery Dunikowskin ja tämän ehdotuksen kattaman rautatien on tarkoitus toteuttaa seuraavat työt: — kahden olemassa olevan poistumisen jälleenrakentaminen. Dunikowski, olemassa olevan ul:n poistumisen selvitystila. Dunikowski, – pysäköintiasemien rakentaminen ja jälleenrakentaminen ul. Dunikowski, – suunnittelu kulkutie ul. Dunikowski siirtokeskuksen korkeudella – muuttamalla nykyisen kulkuväylän sijaintia ul. Dunikowski yhteydessä rekonstruktio poistumisen nro 1, – rakentaminen sisäteiden, – rakentaminen pysäköintiasemien sisä teillä, – rakentaminen jalkakäytävät ja neliöt, – rakentaminen pysäköintiasemia kaksipyöräisille, – rakentaminen pysäkkiasemien linja-autoja ja linja-autoja, – rakentaminen kaupallisen paviljongin kanssa julkisten wc, – rakentaminen linja-autojen katos. (Finnish) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Načrtovani transferni center vključuje lokacijo na območju železniške postaje v Imielinu na ul. Dunikowski in ul. Oh, Haller. Kot del faze I naložbe (območje med ul. Načrtuje se, da bosta Xawery Dunikowski in železniška proga, ki jo zajema ta predlog, izvedli naslednja dela: — rekonstrukcija dveh obstoječih izhodov iz ul. Dunikowski, – likvidacija obstoječega izhoda iz ul. Dunikowski, – gradnja in rekonstrukcija parkirnih mest na ul. Dunikowski, – zasnova prehoda skozi cesto ul. Dunikowski na višini transfernega centra, – spreminjanje lokacije obstoječega prehoda skozi ul. Dunikowski v povezavi z rekonstrukcijo izhoda št. 1, – gradnja notranjih cest, – gradnja parkirnih mest na notranjih cestah, – gradnja pločnikov in kvadratov, – gradnja parkirnih mest za dvokolesa, – gradnja postaj za avtobuse in avtobuse, – gradnja komercialnega paviljona z javnimi stranišči, – gradnja zavetje za avtobuse. (Slovenian) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Plánované přestupové centrum zahrnuje umístění v oblasti železniční stanice v Imielin na ul. Dunikowski a ul. Oh, Hallere, pojď sem. Jako součást fáze I investice (oblast mezi ul. Společnost Xawery Dunikowski a železniční trať, na kterou se vztahuje tento návrh, mají provést tyto práce: — rekonstrukce 2 stávajících východů z ul. Dunikowski, – likvidace stávajícího výjezdu z ul. Dunikowski, – výstavba a rekonstrukce parkovacích stanic ul. Dunikowski, – návrh průjezdu silnicí ul. Dunikowski ve výšce přestupového centra, – změna umístění stávajícího průchodu přes ul. Dunikowski v souvislosti s rekonstrukcí výjezdu č. 1, – výstavba vnitřních komunikací, – výstavba parkovacích stanic na vnitřních komunikacích, – výstavba chodníků a náměstí, – výstavba parkovacích stanic pro dvoukolová vozidla, – výstavba zastávek pro autobusy a autobusy, – výstavba komerčního pavilonu s veřejnými toalety, – výstavba přístřešku autobusů. (Czech) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Planuojamas perkėlimo centras apima vietą Imielin geležinkelio stoties teritorijoje ul. Dunikowskis ir ul. O, Haller. Kaip investicijų I etapo dalis (plotas tarp ul. Planuojama, kad Xawery Dunikowski ir geležinkelio linija, kuriai taikomas šis pasiūlymas, atliks šiuos darbus: 2 esamų išėjimų iš ul rekonstrukcija. Dunikowski, – likviduoti esamą pasitraukimą iš ul. Dunikowski, – automobilių stovėjimo aikštelių statyba ir rekonstrukcija ul. Dunikowskis, – praėjimo per kelią ul dizainas. Dunikowski perdavimo centro aukštyje, – keičiant esamo praėjimo per ul vietą. Dunikowski dėl išėjimo Nr. 1 rekonstrukcijos, – vidaus kelių tiesimo, – stovėjimo aikštelių statybos vidaus keliuose, – šaligatvių ir aikščių statybos, – dviračių stovėjimo aikštelių statybos, – autobusų ir autobusų stotelių statybos, – komercinio paviljono su viešaisiais tualetais statyba, – autobusų prieglaudos statyba. (Lithuanian) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Plānotais pārsēšanās centrs ietver vietu dzelzceļa stacijas teritorijā Imielin, ul. Dunikowski un ul. AK, Haller. Kā daļa no ieguldījumu I posma (platība starp ul. Xawery Dunikowski un dzelzceļa līnija, uz kuru attiecas šis priekšlikums, plāno veikt šādus darbus: 2 esošo izeju rekonstrukcija no ul. Dunikowski, — esošās izejas no ul likvidācija. Dunikowski, — autostāvvietu būvniecība un rekonstrukcija ul. Dunikowski, — dizains pāreju caur ceļu ul. Dunikowski pārsēšanās centra augstumā, — esošās pārejas vietas maiņa caur ul. Dunikowski saistībā ar 1. izejas rekonstrukciju, — iekšējo ceļu būvniecība, — stāvvietu būvniecība uz iekšējiem ceļiem, — ietvju un laukumu būvniecība, — divriteņu stāvvietu būvniecība, — pieturvietu būvniecība autobusiem un autobusiem, — komerciālā paviljona ar sabiedriskajām tualetēm būvniecība, — autobusu patversmes izbūve. (Latvian) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Планираният трансферен център включва местоположение в района на жп гарата в Имиелин на ул. Дуниковски и ул. О, Халър. Като част от етап I на инвестицията (област между ул. Планира се да бъдат извършени следните строителни работи от Xawery Dunikowski и железопътната линия, обхваната от настоящото предложение: реконструкция на 2 съществуващи изхода от ул. Дуниковски, — ликвидация на съществуващия изход от ул. Дуниковски, — изграждане и реконструкция на паркинги в ул. Dunikowski, — дизайн на прохода през пътя ул. Дуниковски в разгара на трансферния център — промяна на местоположението на съществуващия проход през ул. Дуниковски във връзка с реконструкцията на изход № 1 — изграждане на вътрешни пътища, — изграждане на паркинги по вътрешни пътища, — изграждане на тротоари и площади, — изграждане на паркинги за двуколесни превозни средства, — изграждане на спирки за автобуси и автобуси, — изграждане на търговски павилион с обществени тоалетни, — изграждане на автобусен подслон. (Bulgarian) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
A tervezett átszállási központ tartalmaz egy helyet a vasútállomás területén Imielin ul. Dunikowski és ul. Ó, Haller. A beruházás I. szakaszának részeként (az ul. A következő munkálatokat tervezi Xawery Dunikowski és az e javaslat hatálya alá tartozó vasútvonal: – 2 meglévő kijárat rekonstrukciója ul. Dunikowski, – a meglévő kijárat felszámolása ul. Dunikowski, – parkolók építése és rekonstrukciója ul. Dunikowski, – az ul. útszakaszon áthaladó átjáró tervezése. Dunikowski az átrakodási központ magasságában – a meglévő átjáró helyének megváltoztatása ul. Dunikowski az 1. számú kijárat rekonstrukciójával kapcsolatban – belső utak építése, – parkolók építése belső utakon, – járdák és terek építése, – kétkerekű parkolók építése, – buszmegállók építése buszok és buszok számára, – kereskedelmi pavilon építése nyilvános WC-kkel, – buszok és buszok parkolóinak építése. (Hungarian) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Cuimsíonn an t-ionad aistrithe atá beartaithe láthair i gceantar an stáisiúin iarnróid in Imielin ag ul. Dunikowski agus ul. Ó, Haller. Mar chuid de chéim I den infheistíocht (an limistéar idir ul. Tá sé beartaithe go ndéanfaidh Xawery Dunikowski na hoibreacha seo a leanas agus an líne iarnróid atá clúdaithe ag an togra seo: — atógáil 2 slí amach atá ann cheana ó ul. Dunikowski, — leachtú an imeachta reatha ó ul. Dunikowski, — tógáil agus atógáil na stáisiún páirceála ag ul. Dunikowski, — dearadh an phasáiste tríd an mbóthar ul. Dunikowski ag airde an ionaid aistrithe, — suíomh an phasáiste atá ann cheana féin a athrú trí ul. Dunikowski i dtaca le slí amach Uimh. 1, — tógáil bóithre inmheánacha, — stáisiúin pháirceála a thógáil ar bhóithre inmheánacha, — siúláin agus cearnóga a thógáil, — stáisiúin pháirceála a thógáil do dhá roth, — stáisiúin stad a thógáil le haghaidh busanna agus busanna, — pailliún tráchtála a thógáil le leithris phoiblí, — foscadán bus a thógáil. (Irish) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Den planerade överföringscentralen omfattar en plats i området för järnvägsstationen i Imielin at ul. Dunikowski och ul. Åh, Haller. Som en del av etapp I av investeringen (område mellan ul. Följande arbeten planeras utföras av Xawery Dunikowski och den järnvägslinje som omfattas av detta förslag: — rekonstruktion av två befintliga utgångar från ul. Dunikowski, – likvidation av det befintliga utträdet från ul. Dunikowski, – byggande och ombyggnad av parkeringsstationer vid ul. Dunikowski, – design av passagen genom vägbanan ul. Dunikowski på höjden av överföringscentret, – ändra platsen för den befintliga passagen genom ul. Dunikowski i samband med rekonstruktionen av avfart nr 1, – uppförande av inre vägar, – uppförande av parkeringsplatser på inre vägar, – byggande av trottoarer och torg, – konstruktion av parkeringsstationer för tvåhjulingar, – konstruktion av stoppstationer för bussar och bussar, – uppförande av en kommersiell paviljongen med offentliga toaletter, – byggande av ett bussskydd. (Swedish) | |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
Kavandatavas transpordikeskuses on asukoht Imielini raudteejaama piirkonnas aadressil ul. Dunikowski ja ul. Oh, Haller. Investeeringu I etapi osana (piirkond ul. Xawery Dunikowski ja käesoleva ettepanekuga hõlmatud raudteeliin on kavandatud järgmiste tööde teostamiseks: – rekonstrueerimine 2 olemasolevat väljapääsu ul. Dunikowski, – likvideerida olemasoleva väljumise ul. Dunikowski, – ul parklate ehitamine ja rekonstrueerimine. Dunikowski, – disain läbisõidu tee ul. Dunikowski ülekandekeskuse kõrgusel, – olemasoleva läbipääsu asukoha muutmine. Dunikowski seoses väljapääsu nr 1 rekonstrueerimisega, – sisemiste teede ehitamine, – parkimisjaamade ehitamine siseteedel, – kõnniteede ja väljakute ehitamine, – kaherattaliste parkimisjaamade ehitamine, – busside ja busside peatusjaamade ehitamine, – avalike tualettruumidega kommertspaviljoni ehitamine, – busside peavarju ehitamine. (Estonian) | |||||||||||||||
Property / coordinate location: 50°8'38.8"N, 19°12'9.4"E / qualifier | |||||||||||||||
Property / budget | Property / budget | ||||||||||||||
| 400,710.51 Euro
| ||||||||||||||
Property / contained in NUTS: Tyski / qualifier | |||||||||||||||
Property / contained in Local Administrative Unit | |||||||||||||||
Property / contained in Local Administrative Unit: Imielin / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / contained in Local Administrative Unit: Imielin / qualifier | |||||||||||||||
Property / coordinate location | |||||||||||||||
50°5'36.53"N, 19°8'27.74"E
| |||||||||||||||
Property / coordinate location: 50°5'36.53"N, 19°8'27.74"E / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / coordinate location: 50°5'36.53"N, 19°8'27.74"E / qualifier | |||||||||||||||
Property / location (string) | |||||||||||||||
WOJ.: ŚLĄSKIE, POW.: bieruńsko-lędziński | |||||||||||||||
Property / location (string): WOJ.: ŚLĄSKIE, POW.: bieruńsko-lędziński / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / priority axis | |||||||||||||||
Property / priority axis: ENERGY EFFICIENCY, RENEWABLES AND LOW CARBON ECONOMY / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / co-financing rate | |||||||||||||||
47.68 percent
| |||||||||||||||
Property / co-financing rate: 47.68 percent / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / thematic objective | |||||||||||||||
Property / thematic objective: Multiple Thematic Objective / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / thematic objective: Multiple Thematic Objective / qualifier | |||||||||||||||
Property / thematic objective | |||||||||||||||
Property / thematic objective: Low-carbon economy / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / date of last update | |||||||||||||||
13 December 2023
| |||||||||||||||
Property / date of last update: 13 December 2023 / rank | |||||||||||||||
Normal rank |
Latest revision as of 06:20, 9 October 2024
Project Q124075 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of the Integrated Interchange Centre in Imielin |
Project Q124075 in Poland |
Statements
859,463.66 zloty
0 references
1,802,566.4 zloty
0 references
47.68 percent
0 references
19 September 2016
0 references
28 December 2018
0 references
MIASTO IMIELIN
0 references
Projektowane centrum przesiadkowe obejmuje lokalizację w rejonie dworca PKP w Imielinie przy ul. Dunikowskiego oraz ul. Hallera. W ramach etapu I inwestycji (obszar między ul. Xawerego Dunikowskiego a linia kolejową ), objętego niniejszym wnioskiem zaplanowano realizację następujących prac: - przebudowa 2 istniejących zjazdów z ul. Dunikowskiego, - likwidacja istniejącego zjazdu z ul. Dunikowskiego, - budowa i przebudowa stanowisk postojowych przy ul. Dunikowskiego, - zaprojektowanie przejścia przez jezdnię ul. Dunikowskiego na wysokości centrum przesiadkowego, - zmiana lokalizacji istniejącego przejścia przez ul. Dunikowskiego w związku z przebudową zjazdu nr 1, - budowa dróg wewnętrznych, - budowa stanowisk postojowych przy drogach wewnętrznych, - budowa chodników i placyków, - budowa stanowisk postojowych dla jednośladów, - budowa stanowisk postoju busów i autobusów, - budowa pawilonu handlowego z toaletami publicznymi, - budowa wiaty przystankowej. (Polish)
0 references
The proposed interchange centre includes a location in the area of the railway station in Imielin, on a street. Dunikowskiego and ul. It’s Hallera. As part of stage I of the investment (area between ul. Xavier Dunikowski and the railway line covered by this proposal are planned to carry out the following work: — reconstruction of 2 existing exits from ul. Dunikowskiego, – liquidation of the existing exit from ul. Dunikowskiego, – construction and reconstruction of parking stations at ul. Dunikowskiego, – designing a passage through the street. Dunikowskiego at the height of the interchange centre, – changing the location of the existing passage through ul. Dunikowski in connection with the reconstruction of exit No. 1, – construction of internal roads, – construction of parking stations by internal roads, – construction of pavements and squares, – construction of parking stations for single-tracks, – construction of bus and bus stop stations, – construction of a commercial pavilion with public toilets, – construction of a sheltered stop. (English)
21 October 2020
0.3106709851070048
0 references
Le centre de transfert prévu comprend un emplacement dans la zone de la gare d’Imielin à ul. Dunikowski et ul. Oh, Haller. Dans le cadre de l’étape I de l’investissement (zone entre ul. Les travaux suivants sont prévus par Xawery Dunikowski et la ligne de chemin de fer couverte par la présente proposition: — reconstruction de 2 sorties existantes d’ul. Dunikowski, — liquidation de la sortie existante d’ul. Dunikowski, — construction et reconstruction de stations de stationnement à ul. Dunikowski, — conception du passage par la chaussée ul. Dunikowski à la hauteur du centre de transfert, — changer l’emplacement du passage existant à travers ul. Dunikowski dans le cadre de la reconstruction de la sortie no 1, — construction de routes intérieures, — construction de stations de stationnement sur les routes intérieures, — construction de trottoirs et de places, — construction de stations de stationnement pour les deux-roues, — construction de stations d’arrêt pour autobus et autobus, — construction d’un pavillon commercial avec toilettes publiques, — construction d’un abri d’autobus. (French)
2 December 2021
0 references
Das geplante Transferzentrum umfasst einen Standort im Bereich des Bahnhofs in Imielin bei ul. Dunikowski und ul. Oh, Haller. Als Teil der Phase I der Investition (Bereich zwischen ul. Die folgenden Arbeiten sollen von Xawery Dunikowski und der von diesem Vorschlag erfassten Eisenbahnstrecke durchgeführt werden: — Rekonstruktion von 2 bestehenden Ausgängen von ul. Dunikowski, – Liquidation des bestehenden Ausganges aus ul. Dunikowski, – Bau und Umbau von Parkhäusern bei ul. Dunikowski, – Entwurf des Durchgangs durch die Fahrbahn ul. Dunikowski auf der Höhe des Transferzentrums, – Änderung der Position des bestehenden Durchgangs durch ul. Dunikowski im Zusammenhang mit der Rekonstruktion der Ausfahrt Nr. 1, – Bau von Innenstraßen, – Bau von Parkstationen auf Innenstraßen, – Bau von Gehwegen und Plätzen, – Bau von Parkplätzen für Zweiräder, – Bau von Haltestellen für Busse und Busse, – Bau eines Gewerbepavillons mit öffentlichen Toiletten, – Bau eines Busunterstands. (German)
8 December 2021
0 references
Het geplande transfercentrum omvat een locatie in het gebied van het station in Imielin bij ul. Dunikowski en ul. Oh, Haller. Als onderdeel van fase I van de investering (gebied tussen ul. De volgende werkzaamheden zullen worden uitgevoerd door Xawery Dunikowski en de spoorlijn waarop dit voorstel betrekking heeft: — reconstructie van 2 bestaande uitgangen uit ul. Dunikowski, — liquidatie van de bestaande uitgang uit ul. Dunikowski, — bouw en wederopbouw van parkeerstations bij ul. Dunikowski, — ontwerp van de doorgang door de weg ul. Dunikowski op de hoogte van het transfercentrum, — het veranderen van de locatie van de bestaande doorgang door ul. Dunikowski in verband met de wederopbouw van afslag nr. 1, — aanleg van interne wegen, — aanleg van parkeerstations op interne wegen, — bouw van trottoirs en pleinen, — aanleg van parkeerstations voor tweewielers, — bouw van stopstations voor bussen en bussen, — bouw van een commercieel paviljoen met openbare toiletten, — bouw van een busopvang. (Dutch)
17 December 2021
0 references
Il centro di trasferimento previsto comprende una posizione nella zona della stazione ferroviaria di Imielin a ul. Dunikowski e ul. Oh, Haller. Nell'ambito della fase I dell'investimento (area tra ul. I seguenti lavori saranno realizzati da Xawery Dunikowski e dalla linea ferroviaria oggetto della presente proposta: — ricostruzione di 2 uscite esistenti da ul. Dunikowski, — liquidazione dell'uscita esistente da ul. Dunikowski, — costruzione e ricostruzione di stazioni di parcheggio a ul. Dunikowski, — progettazione del passaggio attraverso la carreggiata ul. Dunikowski all'altezza del centro di trasferimento, — cambiando la posizione del passaggio esistente attraverso ul. Dunikowski in connessione con la ricostruzione dell'uscita n. 1, — costruzione di strade interne, — costruzione di stazioni di parcheggio su strade interne, — costruzione di marciapiedi e piazze, — costruzione di stazioni di parcheggio per due ruote, — costruzione di stazioni di sosta per autobus e autobus, — costruzione di un padiglione commerciale con servizi igienici pubblici, — costruzione di un riparo per autobus. (Italian)
15 January 2022
0 references
El centro de transferencia previsto incluye una ubicación en la zona de la estación de tren en Imielin at ul. Dunikowski y ul. Oh, Haller. Como parte de la etapa I de la inversión (área entre ul. Xawery Dunikowski y la línea ferroviaria objeto de la presente propuesta tienen previsto realizar las siguientes obras: — reconstrucción de 2 salidas existentes de ul. Dunikowski, — liquidación de la salida existente de ul. Dunikowski, — construcción y reconstrucción de estaciones de aparcamiento en ul. Dunikowski, — diseño del paso a través de la carretera ul. Dunikowski a la altura del centro de transferencia, — cambiando la ubicación del paso existente a través de ul. Dunikowski en relación con la reconstrucción de la salida N.º 1, — construcción de carreteras internas, — construcción de estaciones de estacionamiento en carreteras internas, — construcción de aceras y plazas, — construcción de estaciones de estacionamiento para vehículos de dos ruedas, — construcción de estaciones de parada para autobuses y autobuses, — construcción de un pabellón comercial con baños públicos, — construcción de un refugio para autobuses. (Spanish)
18 January 2022
0 references
Det planlagte transfercenter omfatter en placering i området af banegården i Imielin at ul. Dunikowski og ul. Åh, Haller. Som en del af fase I af investeringen (område mellem ul. Xawery Dunikowski og den jernbanelinje, der er omfattet af dette forslag, skal efter planen udføre følgende arbejder: — rekonstruktion af to eksisterende udgange fra ul. Dunikowski, — likvidation af den eksisterende exit fra ul. Dunikowski, — opførelse og genopbygning af parkeringspladser på ul. Dunikowski, — design af passagen gennem vejbanen ul. Dunikowski på højden af transfer center, — ændre placeringen af den eksisterende passage gennem ul. Dunikowski i forbindelse med rekonstruktion af exit nr. 1, — opførelse af indre veje, — opførelse af parkeringspladser på indre veje, — opførelse af fortove og pladser, — opførelse af parkeringspladser for tohjulede, — opførelse af stopstationer for busser og busser, — opførelse af en kommerciel pavillon med offentlige toiletter, — opførelse af et busly. (Danish)
2 July 2022
0 references
Το σχεδιαζόμενο κέντρο μεταφοράς περιλαμβάνει μια θέση στην περιοχή του σιδηροδρομικού σταθμού στο Imielin στο ul. Ντάνικοβσκι και Ουλ. Ω, Χάλερ. Στο πλαίσιο του σταδίου Ι της επένδυσης (περιοχή μεταξύ ul. Οι ακόλουθες εργασίες προγραμματίζονται να εκτελεστούν από τον Xawery Dunikowski και τη σιδηροδρομική γραμμή που καλύπτεται από την παρούσα πρόταση: — ανακατασκευή 2 υπαρχουσών εξόδων από τον Ουλ. Dunikowski, — εκκαθάριση της υπάρχουσας εξόδου από τον Ουλ. Dunikowski, — κατασκευή και ανακατασκευή σταθμών στάθμευσης στο ul. Dunikowski, — σχεδιασμός του περάσματος μέσω του δρόμου ul. Dunikowski στο ύψος του κέντρου μεταφοράς, — αλλαγή της θέσης της υπάρχουσας διέλευσης μέσω ul. Dunikowski σε σχέση με την ανακατασκευή της εξόδου αριθ. 1 — κατασκευή εσωτερικών οδών, — κατασκευή σταθμών στάθμευσης σε εσωτερικούς δρόμους, — κατασκευή πεζοδρόμων και πλατειών, — κατασκευή σταθμών στάθμευσης για δίκυκλα, — κατασκευή σταθμών στάσης λεωφορείων και λεωφορείων, — κατασκευή εμπορικού περιπτέρου με δημόσιες τουαλέτες, — κατασκευή καταφυγίου λεωφορείων. (Greek)
2 July 2022
0 references
Planirani transfer centar uključuje lokaciju na području željezničkog kolodvora u Imielinu u ul. Dunikowski i ul. Oh, Haller. Kao dio I faze ulaganja (područje između ul. Xawery Dunikowski i željeznička pruga obuhvaćena ovim prijedlogom planiraju obaviti sljedeće radove: rekonstrukcija 2 postojeća izlaza iz ul. Dunikowski, likvidacija postojećeg izlaza iz ul. Dunikowski, – izgradnja i rekonstrukcija parkirnih mjesta u Ul. Dunikowski, dizajn prolaza kroz cestu ul. Dunikowski na visini transfer centra, – promjena položaja postojećeg prolaza kroz ul. Dunikowski u vezi s rekonstrukcijom izlaza br. 1, – izgradnja unutarnjih cesta, – izgradnja parkirališnih postaja na unutarnjim cestama, – izgradnja pločnika i trgova, – izgradnja parkirnih stanica za dva kotača, – izgradnja stajališta za autobuse i autobuse, – izgradnja komercijalnog paviljona s javnim toaletima, – izgradnja autobusnog skloništa. (Croatian)
2 July 2022
0 references
Centrul de transfer planificat include o locație în zona gării din Imielin din ul. Dunikowski și ul. Oh, Haller. Ca parte a etapei I a investiției (zona dintre ul. Următoarele lucrări sunt planificate să fie efectuate de Xawery Dunikowski și de linia de cale ferată care face obiectul prezentei propuneri: reconstrucția a 2 ieșiri existente din ul. Dunikowski, – lichidarea ieșirii existente din ul. Dunikowski, – construcția și reconstrucția stațiilor de parcare la ul. Dunikowski, – proiectarea trecerii prin drumul ul. Dunikowski la înălțimea centrului de transfer, – schimbarea locației trecerii existente prin ul. Dunikowski în legătură cu reconstrucția ieșirii nr. 1, – construcția de drumuri interne, – construcția de stații de parcare pe drumurile interne, – construcția de trotuare și piețe, – construcția de stații de parcare pentru vehicule cu două roți, – construirea de stații de oprire pentru autobuze și autobuze, – construirea unui pavilion comercial cu toalete publice, – construirea unui adăpost pentru autobuze. (Romanian)
2 July 2022
0 references
Plánované prestupové centrum zahŕňa miesto v areáli železničnej stanice v Imieline na ul. Dunikowski a ul. Oh, Haller. Ako súčasť fázy I investície (oblasť medzi ul. Xawery Dunikowski a železničná trať, na ktorú sa vzťahuje tento návrh, majú podľa plánu vykonať tieto práce: — rekonštrukcia 2 existujúcich východov z ul. Dunikowski, – likvidácia existujúceho výstupu z ul. Dunikowski, – výstavba a rekonštrukcia parkovacích staníc ul. Dunikowski, – návrh priechodu cez cestnú cestu ul. Dunikowski vo výške transferového centra, – zmena umiestnenia existujúceho priechodu cez ul. Dunikowski v súvislosti s rekonštrukciou výjazdu č. 1, – výstavba vnútorných ciest, – výstavba parkovacích staníc na vnútorných cestách, – výstavba chodníkov a námestí, – výstavba parkovacích staníc pre dvojkolesové, – výstavba zastávok pre autobusy a autobusy, – výstavba komerčného pavilónu s verejnými toaletami, – výstavba autobusového prístrešia. (Slovak)
2 July 2022
0 references
Iċ-ċentru ta’ trasferiment ippjanat jinkludi post fiż-żona tal-istazzjon tal-ferrovija f’Imielin ta’ ul. Dunikowski u ul. OH, Haller. Bħala parti mill-istadju I tal-investiment (żona bejn ul. Ix-xogħlijiet li ġejjin huma ppjanati li jitwettqu minn Xawery Dunikowski u l-linja ferrovjarja koperta minn din il-proposta: — rikostruzzjoni ta ' 2 ħruġ eżistenti minn ul. Dunikowski, — likwidazzjoni tal-ħruġ eżistenti minn ul. Dunikowski, — kostruzzjoni u rikostruzzjoni ta ‘stazzjonijiet ta’ parkeġġ fil ul. Dunikowski, — disinn tal-passaġġ mill-triq ul. Dunikowski fl-għoli taċ-ċentru tat-trasferiment, — biddel il-post tal-passaġġ eżistenti minn ul. Dunikowski b’rabta mar-rikostruzzjoni tal-ħruġ Nru 1, — il-kostruzzjoni ta’ toroq interni, — il-kostruzzjoni ta’ stazzjonijiet tal-parkeġġ fuq toroq interni, — il-kostruzzjoni ta’ ħitan tal-ġenb u kwadri, — il-kostruzzjoni ta’ stazzjonijiet tal-parkeġġ għal vetturi b’żewġ roti, — il-kostruzzjoni ta’ stazzjonijiet ta’ waqfien għall-karozzi tal-linja u l-karozzi tal-linja, — il-kostruzzjoni ta’ paviljun kummerċjali b’tojlits pubbliċi, — il-kostruzzjoni ta’ kenn għall-karozzi tal-linja. (Maltese)
2 July 2022
0 references
O centro de intercâmbio proposto inclui uma localização na área da estação ferroviária de Imielin, numa rua. Dunikowskiego e ul. É a Hallera. No âmbito da fase I do investimento (zona entre ul. Prevê-se que Xavier Dunikowski e a linha ferroviária abrangida pela presente proposta realizem os seguintes trabalhos: — reconstrução de duas saídas existentes da ul. Dunikowskiego, – liquidação da saída existente da ul. Dunikowskiego, – construção e reconstrução de parques de estacionamento em ul. Dunikowskiego, – desenho de uma passagem pela rua. Dunikowskiego na altura do centro de transferência, – alteração da localização da passagem existente através de ul. Dunikowski no âmbito da reconstrução da saída n.° 1, – construção de estradas internas, – construção de estações de estacionamento por estradas internas, – construção de pavimentos e praças, – construção de estações de estacionamento para vias únicas, – construção de estações de paragem de autocarros, – construção de um pavilhão comercial com instalações sanitárias públicas, – construção de uma paragem protegida. (Portuguese)
2 July 2022
0 references
Suunniteltu siirtokeskus sisältää sijainnin Imielinin rautatieaseman alueella ul. Dunikowski ja ul. Niin, Haller. Osa investoinnin vaihetta I (pinta-ala ul. Xawery Dunikowskin ja tämän ehdotuksen kattaman rautatien on tarkoitus toteuttaa seuraavat työt: — kahden olemassa olevan poistumisen jälleenrakentaminen. Dunikowski, olemassa olevan ul:n poistumisen selvitystila. Dunikowski, – pysäköintiasemien rakentaminen ja jälleenrakentaminen ul. Dunikowski, – suunnittelu kulkutie ul. Dunikowski siirtokeskuksen korkeudella – muuttamalla nykyisen kulkuväylän sijaintia ul. Dunikowski yhteydessä rekonstruktio poistumisen nro 1, – rakentaminen sisäteiden, – rakentaminen pysäköintiasemien sisä teillä, – rakentaminen jalkakäytävät ja neliöt, – rakentaminen pysäköintiasemia kaksipyöräisille, – rakentaminen pysäkkiasemien linja-autoja ja linja-autoja, – rakentaminen kaupallisen paviljongin kanssa julkisten wc, – rakentaminen linja-autojen katos. (Finnish)
2 July 2022
0 references
Načrtovani transferni center vključuje lokacijo na območju železniške postaje v Imielinu na ul. Dunikowski in ul. Oh, Haller. Kot del faze I naložbe (območje med ul. Načrtuje se, da bosta Xawery Dunikowski in železniška proga, ki jo zajema ta predlog, izvedli naslednja dela: — rekonstrukcija dveh obstoječih izhodov iz ul. Dunikowski, – likvidacija obstoječega izhoda iz ul. Dunikowski, – gradnja in rekonstrukcija parkirnih mest na ul. Dunikowski, – zasnova prehoda skozi cesto ul. Dunikowski na višini transfernega centra, – spreminjanje lokacije obstoječega prehoda skozi ul. Dunikowski v povezavi z rekonstrukcijo izhoda št. 1, – gradnja notranjih cest, – gradnja parkirnih mest na notranjih cestah, – gradnja pločnikov in kvadratov, – gradnja parkirnih mest za dvokolesa, – gradnja postaj za avtobuse in avtobuse, – gradnja komercialnega paviljona z javnimi stranišči, – gradnja zavetje za avtobuse. (Slovenian)
2 July 2022
0 references
Plánované přestupové centrum zahrnuje umístění v oblasti železniční stanice v Imielin na ul. Dunikowski a ul. Oh, Hallere, pojď sem. Jako součást fáze I investice (oblast mezi ul. Společnost Xawery Dunikowski a železniční trať, na kterou se vztahuje tento návrh, mají provést tyto práce: — rekonstrukce 2 stávajících východů z ul. Dunikowski, – likvidace stávajícího výjezdu z ul. Dunikowski, – výstavba a rekonstrukce parkovacích stanic ul. Dunikowski, – návrh průjezdu silnicí ul. Dunikowski ve výšce přestupového centra, – změna umístění stávajícího průchodu přes ul. Dunikowski v souvislosti s rekonstrukcí výjezdu č. 1, – výstavba vnitřních komunikací, – výstavba parkovacích stanic na vnitřních komunikacích, – výstavba chodníků a náměstí, – výstavba parkovacích stanic pro dvoukolová vozidla, – výstavba zastávek pro autobusy a autobusy, – výstavba komerčního pavilonu s veřejnými toalety, – výstavba přístřešku autobusů. (Czech)
2 July 2022
0 references
Planuojamas perkėlimo centras apima vietą Imielin geležinkelio stoties teritorijoje ul. Dunikowskis ir ul. O, Haller. Kaip investicijų I etapo dalis (plotas tarp ul. Planuojama, kad Xawery Dunikowski ir geležinkelio linija, kuriai taikomas šis pasiūlymas, atliks šiuos darbus: 2 esamų išėjimų iš ul rekonstrukcija. Dunikowski, – likviduoti esamą pasitraukimą iš ul. Dunikowski, – automobilių stovėjimo aikštelių statyba ir rekonstrukcija ul. Dunikowskis, – praėjimo per kelią ul dizainas. Dunikowski perdavimo centro aukštyje, – keičiant esamo praėjimo per ul vietą. Dunikowski dėl išėjimo Nr. 1 rekonstrukcijos, – vidaus kelių tiesimo, – stovėjimo aikštelių statybos vidaus keliuose, – šaligatvių ir aikščių statybos, – dviračių stovėjimo aikštelių statybos, – autobusų ir autobusų stotelių statybos, – komercinio paviljono su viešaisiais tualetais statyba, – autobusų prieglaudos statyba. (Lithuanian)
2 July 2022
0 references
Plānotais pārsēšanās centrs ietver vietu dzelzceļa stacijas teritorijā Imielin, ul. Dunikowski un ul. AK, Haller. Kā daļa no ieguldījumu I posma (platība starp ul. Xawery Dunikowski un dzelzceļa līnija, uz kuru attiecas šis priekšlikums, plāno veikt šādus darbus: 2 esošo izeju rekonstrukcija no ul. Dunikowski, — esošās izejas no ul likvidācija. Dunikowski, — autostāvvietu būvniecība un rekonstrukcija ul. Dunikowski, — dizains pāreju caur ceļu ul. Dunikowski pārsēšanās centra augstumā, — esošās pārejas vietas maiņa caur ul. Dunikowski saistībā ar 1. izejas rekonstrukciju, — iekšējo ceļu būvniecība, — stāvvietu būvniecība uz iekšējiem ceļiem, — ietvju un laukumu būvniecība, — divriteņu stāvvietu būvniecība, — pieturvietu būvniecība autobusiem un autobusiem, — komerciālā paviljona ar sabiedriskajām tualetēm būvniecība, — autobusu patversmes izbūve. (Latvian)
2 July 2022
0 references
Планираният трансферен център включва местоположение в района на жп гарата в Имиелин на ул. Дуниковски и ул. О, Халър. Като част от етап I на инвестицията (област между ул. Планира се да бъдат извършени следните строителни работи от Xawery Dunikowski и железопътната линия, обхваната от настоящото предложение: реконструкция на 2 съществуващи изхода от ул. Дуниковски, — ликвидация на съществуващия изход от ул. Дуниковски, — изграждане и реконструкция на паркинги в ул. Dunikowski, — дизайн на прохода през пътя ул. Дуниковски в разгара на трансферния център — промяна на местоположението на съществуващия проход през ул. Дуниковски във връзка с реконструкцията на изход № 1 — изграждане на вътрешни пътища, — изграждане на паркинги по вътрешни пътища, — изграждане на тротоари и площади, — изграждане на паркинги за двуколесни превозни средства, — изграждане на спирки за автобуси и автобуси, — изграждане на търговски павилион с обществени тоалетни, — изграждане на автобусен подслон. (Bulgarian)
2 July 2022
0 references
A tervezett átszállási központ tartalmaz egy helyet a vasútállomás területén Imielin ul. Dunikowski és ul. Ó, Haller. A beruházás I. szakaszának részeként (az ul. A következő munkálatokat tervezi Xawery Dunikowski és az e javaslat hatálya alá tartozó vasútvonal: – 2 meglévő kijárat rekonstrukciója ul. Dunikowski, – a meglévő kijárat felszámolása ul. Dunikowski, – parkolók építése és rekonstrukciója ul. Dunikowski, – az ul. útszakaszon áthaladó átjáró tervezése. Dunikowski az átrakodási központ magasságában – a meglévő átjáró helyének megváltoztatása ul. Dunikowski az 1. számú kijárat rekonstrukciójával kapcsolatban – belső utak építése, – parkolók építése belső utakon, – járdák és terek építése, – kétkerekű parkolók építése, – buszmegállók építése buszok és buszok számára, – kereskedelmi pavilon építése nyilvános WC-kkel, – buszok és buszok parkolóinak építése. (Hungarian)
2 July 2022
0 references
Cuimsíonn an t-ionad aistrithe atá beartaithe láthair i gceantar an stáisiúin iarnróid in Imielin ag ul. Dunikowski agus ul. Ó, Haller. Mar chuid de chéim I den infheistíocht (an limistéar idir ul. Tá sé beartaithe go ndéanfaidh Xawery Dunikowski na hoibreacha seo a leanas agus an líne iarnróid atá clúdaithe ag an togra seo: — atógáil 2 slí amach atá ann cheana ó ul. Dunikowski, — leachtú an imeachta reatha ó ul. Dunikowski, — tógáil agus atógáil na stáisiún páirceála ag ul. Dunikowski, — dearadh an phasáiste tríd an mbóthar ul. Dunikowski ag airde an ionaid aistrithe, — suíomh an phasáiste atá ann cheana féin a athrú trí ul. Dunikowski i dtaca le slí amach Uimh. 1, — tógáil bóithre inmheánacha, — stáisiúin pháirceála a thógáil ar bhóithre inmheánacha, — siúláin agus cearnóga a thógáil, — stáisiúin pháirceála a thógáil do dhá roth, — stáisiúin stad a thógáil le haghaidh busanna agus busanna, — pailliún tráchtála a thógáil le leithris phoiblí, — foscadán bus a thógáil. (Irish)
2 July 2022
0 references
Den planerade överföringscentralen omfattar en plats i området för järnvägsstationen i Imielin at ul. Dunikowski och ul. Åh, Haller. Som en del av etapp I av investeringen (område mellan ul. Följande arbeten planeras utföras av Xawery Dunikowski och den järnvägslinje som omfattas av detta förslag: — rekonstruktion av två befintliga utgångar från ul. Dunikowski, – likvidation av det befintliga utträdet från ul. Dunikowski, – byggande och ombyggnad av parkeringsstationer vid ul. Dunikowski, – design av passagen genom vägbanan ul. Dunikowski på höjden av överföringscentret, – ändra platsen för den befintliga passagen genom ul. Dunikowski i samband med rekonstruktionen av avfart nr 1, – uppförande av inre vägar, – uppförande av parkeringsplatser på inre vägar, – byggande av trottoarer och torg, – konstruktion av parkeringsstationer för tvåhjulingar, – konstruktion av stoppstationer för bussar och bussar, – uppförande av en kommersiell paviljongen med offentliga toaletter, – byggande av ett bussskydd. (Swedish)
2 July 2022
0 references
Kavandatavas transpordikeskuses on asukoht Imielini raudteejaama piirkonnas aadressil ul. Dunikowski ja ul. Oh, Haller. Investeeringu I etapi osana (piirkond ul. Xawery Dunikowski ja käesoleva ettepanekuga hõlmatud raudteeliin on kavandatud järgmiste tööde teostamiseks: – rekonstrueerimine 2 olemasolevat väljapääsu ul. Dunikowski, – likvideerida olemasoleva väljumise ul. Dunikowski, – ul parklate ehitamine ja rekonstrueerimine. Dunikowski, – disain läbisõidu tee ul. Dunikowski ülekandekeskuse kõrgusel, – olemasoleva läbipääsu asukoha muutmine. Dunikowski seoses väljapääsu nr 1 rekonstrueerimisega, – sisemiste teede ehitamine, – parkimisjaamade ehitamine siseteedel, – kõnniteede ja väljakute ehitamine, – kaherattaliste parkimisjaamade ehitamine, – busside ja busside peatusjaamade ehitamine, – avalike tualettruumidega kommertspaviljoni ehitamine, – busside peavarju ehitamine. (Estonian)
2 July 2022
0 references
WOJ.: ŚLĄSKIE, POW.: bieruńsko-lędziński
0 references
13 December 2023
0 references
Identifiers
RPSL.04.05.01-24-00D3/17
0 references