GUGLIELMI PLANNING (Q4210924): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Adding NUTS from updating NUTS 2021) |
(Changed label, description and/or aliases in pt) |
||||||||||||||
(6 intermediate revisions by 2 users not shown) | |||||||||||||||
label / pt | label / pt | ||||||||||||||
PLANEAMENTO GUGLIELMI | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 56,782.12 Euro / rank | |||||||||||||||
Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 60.0 percent / rank | |||||||||||||||
Property / summary: REALISATION OF A PROJECT THAT INVOLVES THE MANAGEMENT OF ALL PHASES OF THE SERVICES RELATED TO ARCHITECTURE AND ENGINEERING, UP TO THE REALISATION OF THE WORK THROUGH THE BIM PROCEDURAL SYSTEM (English) / qualifier | |||||||||||||||
readability score: 0.0010358480750246
| |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
REALIZAÇÃO DE UM PROJECTO QUE ENVOLVEU A GESTÃO DE TODAS AS FASES DOS SERVIÇOS RELACIONADOS COM A ARQUITETURA E A ENGENHARIA, ATÉ À REALIZAÇÃO DO TRABALHO ATRAVÉS DO SISTEMA PROCEDURAL BIM (Portuguese) | |||||||||||||||
Property / intervention field | |||||||||||||||
Property / intervention field: Generic productive investment in small and medium–sized enterprises (‘SMEs’) / rank | |||||||||||||||
Property / intervention field | |||||||||||||||
Property / intervention field: Advanced support services for SMEs and groups of SMEs (including management, marketing and design services) / rank | |||||||||||||||
Property / intervention field | |||||||||||||||
Property / intervention field: SME business development, support to entrepreneurship and incubation (including support to spin offs and spin outs) / rank | |||||||||||||||
Property / intervention field | |||||||||||||||
Property / intervention field: Development and promotion of commercial tourism services in or for SMEs / rank | |||||||||||||||
Property / contained in Local Administrative Unit | |||||||||||||||
Property / contained in Local Administrative Unit: Provvidenti / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / priority axis | |||||||||||||||
Property / priority axis: COMPETITIVENESS OF THE PRODUCTION SYSTEM / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / thematic objective | |||||||||||||||
Property / thematic objective: Competitiveness of SMEs / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / intervention field | |||||||||||||||
Property / intervention field: Generic productive investment in small and medium–sized enterprises (‘SMEs’) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / start time | |||||||||||||||
13 November 2019
| |||||||||||||||
Property / start time: 13 November 2019 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
47,318.43 Euro
| |||||||||||||||
Property / EU contribution: 47,318.43 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / co-financing rate | |||||||||||||||
50.0 percent
| |||||||||||||||
Property / co-financing rate: 50.0 percent / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / date of last update | |||||||||||||||
8 April 2023
| |||||||||||||||
Property / date of last update: 8 April 2023 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / Call for proposal | |||||||||||||||
Property / Call for proposal: AVVISO AIUTI PER INVESTIMENTI IN MACCHINARI, IMPIANTI E BENI INTANGIBILI, E ACCOMPAGNAMENTO DEI PROCESSI DI RIORGANIZZAZIONE E RISTRUTTURAZIONE AZIENDALE / rank | |||||||||||||||
Normal rank |
Latest revision as of 16:25, 11 October 2024
Project Q4210924 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | GUGLIELMI PLANNING |
Project Q4210924 in Italy |
Statements
47,318.43 Euro
0 references
94,636.86 Euro
0 references
50.0 percent
0 references
13 November 2019
0 references
GUGLIELMI PLANNING SRL
0 references
REALIZZAZIONE DI UN PROGETTO CHE PREVEDE LA GESTIONE DI TUTTE LE FASI DEI SERVIZI ATTINENTI L'ARCHITETTURA E L'INGEGNERIA, FINO ALLA REALIZZAZIONE DELL'OPERA ATTRAVERSO IL SISTEMA PROCEDURALE BIM (Italian)
0 references
REALISATION OF A PROJECT THAT INVOLVES THE MANAGEMENT OF ALL PHASES OF THE SERVICES RELATED TO ARCHITECTURE AND ENGINEERING, UP TO THE REALISATION OF THE WORK THROUGH THE BIM PROCEDURAL SYSTEM (English)
1 February 2022
0.0010358480750246
0 references
RÉALISATION D’UN PROJET QUI IMPLIQUE LA GESTION DE TOUTES LES PHASES DES SERVICES LIÉS À L’ARCHITECTURE ET À L’INGÉNIERIE, JUSQU’À LA RÉALISATION DU TRAVAIL À TRAVERS LE SYSTÈME DE PROCÉDURE BIM (French)
2 February 2022
0 references
REALISIERUNG EINES PROJEKTS, DAS DIE VERWALTUNG ALLER PHASEN DER DIENSTLEISTUNGEN IM ZUSAMMENHANG MIT ARCHITEKTUR UND ENGINEERING UMFASST, BIS ZUR REALISIERUNG DER ARBEIT DURCH DAS BIM-VERFAHRENSSYSTEM (German)
3 February 2022
0 references
REALISATIE VAN EEN PROJECT DAT HET BEHEER VAN ALLE FASEN VAN DE DIENSTEN IN VERBAND MET ARCHITECTUUR EN ENGINEERING OMVAT, TOT DE REALISATIE VAN DE WERKZAAMHEDEN VIA HET PROCEDURESYSTEEM BIM (Dutch)
4 February 2022
0 references
REALIZACIÓN DE UN PROYECTO QUE IMPLICA LA GESTIÓN DE TODAS LAS FASES DE LOS SERVICIOS RELACIONADOS CON LA ARQUITECTURA Y LA INGENIERÍA, HASTA LA REALIZACIÓN DE LA OBRA A TRAVÉS DEL SISTEMA PROCEDIMENTAL BIM (Spanish)
4 February 2022
0 references
GENNEMFØRELSE AF ET PROJEKT, DER OMFATTER FORVALTNING AF ALLE FASER AF DE TJENESTEYDELSER, DER VEDRØRER ARKITEKTUR OG INGENIØRARBEJDE, FREM TIL GENNEMFØRELSEN AF ARBEJDET GENNEM BIM-PROCEDURESYSTEMET (Danish)
22 July 2022
0 references
ΥΛΟΠΟΊΗΣΗ ΕΝΌΣ ΈΡΓΟΥ ΠΟΥ ΠΕΡΙΛΑΜΒΆΝΕΙ ΤΗ ΔΙΑΧΕΊΡΙΣΗ ΌΛΩΝ ΤΩΝ ΦΆΣΕΩΝ ΤΩΝ ΥΠΗΡΕΣΙΏΝ ΠΟΥ ΣΧΕΤΊΖΟΝΤΑΙ ΜΕ ΤΗΝ ΑΡΧΙΤΕΚΤΟΝΙΚΉ ΚΑΙ ΤΗ ΜΗΧΑΝΙΚΉ, ΜΈΧΡΙ ΤΗΝ ΥΛΟΠΟΊΗΣΗ ΤΟΥ ΈΡΓΟΥ ΜΈΣΩ ΤΟΥ ΔΙΑΔΙΚΑΣΤΙΚΟΎ ΣΥΣΤΉΜΑΤΟΣ BIM (Greek)
22 July 2022
0 references
REALIZACIJA PROJEKTA KOJI UKLJUČUJE UPRAVLJANJE SVIM FAZAMA USLUGA VEZANIH UZ ARHITEKTURU I INŽENJERING, DO REALIZACIJE RADOVA KROZ BIM PROCEDURALNI SUSTAV (Croatian)
22 July 2022
0 references
REALIZAREA UNUI PROIECT CARE PRESUPUNE MANAGEMENTUL TUTUROR FAZELOR SERVICIILOR LEGATE DE ARHITECTURĂ ȘI INGINERIE, PÂNĂ LA REALIZAREA LUCRĂRILOR PRIN SISTEMUL PROCEDURAL BIM (Romanian)
22 July 2022
0 references
REALIZÁCIA PROJEKTU, KTORÝ ZAHŔŇA RIADENIE VŠETKÝCH FÁZ SLUŽIEB SÚVISIACICH S ARCHITEKTÚROU A INŽINIERSTVOM, AŽ PO REALIZÁCIU PRÁC PROSTREDNÍCTVOM PROCEDURÁLNEHO SYSTÉMU BIM (Slovak)
22 July 2022
0 references
TWETTIQ TA’ PROĠETT LI JINVOLVI L-ĠESTJONI TAL-FAŻIJIET KOLLHA TAS-SERVIZZI RELATATI MAL-ARKITETTURA U L-INĠINERIJA, SAT-TWETTIQ TAX-XOGĦOL PERMEZZ TAS-SISTEMA PROĊEDURALI TAL-BIM (Maltese)
22 July 2022
0 references
REALIZAÇÃO DE UM PROJECTO QUE ENVOLVEU A GESTÃO DE TODAS AS FASES DOS SERVIÇOS RELACIONADOS COM A ARQUITETURA E A ENGENHARIA, ATÉ À REALIZAÇÃO DO TRABALHO ATRAVÉS DO SISTEMA PROCEDURAL BIM (Portuguese)
22 July 2022
0 references
SELLAISEN HANKKEEN TOTEUTTAMINEN, JOHON SISÄLTYY ARKKITEHTUURIIN JA INSINÖÖRITEKNIIKKAAN LIITTYVIEN PALVELUJEN KAIKKIEN VAIHEIDEN HALLINNOINTI AINA RAKENNUSTIEDON MALLINTAMISEN PROSESSIJÄRJESTELMÄN KAUTTA TAPAHTUVAAN TYÖN TOTEUTTAMISEEN ASTI (Finnish)
22 July 2022
0 references
REALIZACJA PROJEKTU POLEGAJĄCEGO NA ZARZĄDZANIU WSZYSTKIMI ETAPAMI USŁUG ZWIĄZANYCH Z ARCHITEKTURĄ I INŻYNIERIĄ, AŻ DO REALIZACJI PRAC POPRZEZ SYSTEM PROCEDURALNY BIM (Polish)
22 July 2022
0 references
REALIZACIJA PROJEKTA, KI VKLJUČUJE UPRAVLJANJE VSEH FAZ STORITEV, POVEZANIH Z ARHITEKTURO IN INŽENIRINGOM, VSE DO REALIZACIJE DEL PREK POSTOPKOVNEGA SISTEMA INFORMACIJSKEGA MODELIRANJA GRADENJ (Slovenian)
22 July 2022
0 references
REALIZACE PROJEKTU, KTERÝ ZAHRNUJE ŘÍZENÍ VŠECH FÁZÍ SLUŽEB SOUVISEJÍCÍCH S ARCHITEKTUROU A INŽENÝRSTVÍM AŽ PO REALIZACI PRACÍ PROSTŘEDNICTVÍM PROCESNÍHO SYSTÉMU BIM (Czech)
22 July 2022
0 references
PROJEKTO, APIMANČIO VISŲ SU ARCHITEKTŪRA IR INŽINERIJA SUSIJUSIŲ PASLAUGŲ ETAPŲ VALDYMĄ, ĮGYVENDINIMAS IKI DARBŲ ĮGYVENDINIMO PER BIM PROCEDŪRINĘ SISTEMĄ (Lithuanian)
22 July 2022
0 references
PROJEKTA REALIZĀCIJA, KAS IETVER VISU AR ARHITEKTŪRU UN INŽENIERIJU SAISTĪTO PAKALPOJUMU POSMU PĀRVALDĪBU, LĪDZ DARBU REALIZĀCIJAI, IZMANTOJOT BIM PROCESUĀLO SISTĒMU (Latvian)
22 July 2022
0 references
РЕАЛИЗАЦИЯ НА ПРОЕКТ, КОЙТО ВКЛЮЧВА УПРАВЛЕНИЕ НА ВСИЧКИ ЕТАПИ ОТ УСЛУГИТЕ, СВЪРЗАНИ С АРХИТЕКТУРАТА И ИНЖЕНЕРСТВОТО, ДО РЕАЛИЗИРАНЕ НА РАБОТАТА ЧРЕЗ ПРОЦЕДУРНАТА СИСТЕМА НА СИМ (Bulgarian)
22 July 2022
0 references
OLYAN PROJEKT MEGVALÓSÍTÁSA, AMELY MAGÁBAN FOGLALJA AZ ÉPÍTÉSZETI ÉS MÉRNÖKI SZOLGÁLTATÁSOK VALAMENNYI FÁZISÁNAK IRÁNYÍTÁSÁT, EGÉSZEN A MUNKA BIM ELJÁRÁSI RENDSZEREN KERESZTÜLI MEGVALÓSÍTÁSÁIG (Hungarian)
22 July 2022
0 references
TIONSCADAL A CHUR I GCRÍCH INA NDÉANTAR GACH CÉIM DE NA SEIRBHÍSÍ A BHAINEANN LE HAILTIREACHT AGUS INNEALTÓIREACHT A BHAINISTIÚ, GO DTÍ GO GCUIRFEAR AN OBAIR I GCRÍCH TRÍ CHÓRAS NÓS IMEACHTA BIM (Irish)
22 July 2022
0 references
GENOMFÖRANDE AV ETT PROJEKT SOM OMFATTAR FÖRVALTNING AV ALLA FASER AV TJÄNSTER SOM RÖR ARKITEKTUR OCH INGENJÖRSVETENSKAP, FRAM TILL GENOMFÖRANDET AV ARBETET GENOM BIM:S FÖRFARANDESYSTEM (Swedish)
22 July 2022
0 references
PROJEKTI ELLUVIIMINE, MIS HÕLMAB ARHITEKTUURI JA INSENERITEENUSTE KÕIKIDE ETAPPIDE JUHTIMIST KUNI TÖÖDE TEOSTAMISENI EHITUSTEABE MODELLEERIMISE SÜSTEEMI KAUDU (Estonian)
22 July 2022
0 references
CAMPOBASSO
0 references
8 April 2023
0 references