IMPLEMENTATION OF A REAL-TIME PRODUCTIVITY CONTROL AND IMPROVEMENT SYSTEM CONNECTED TO THE COMPANY’S ERP (Q3249390): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl, nl, fr, de, it, es, and other parts: Adding translations: el, da, fi, mt, lv, sk, ga, cs, pt, et, hu, bg, lt, hr, sv, ro, sl, pl,) |
(Changed label, description and/or aliases in pt) |
||||||||||||||
(6 intermediate revisions by 2 users not shown) | |||||||||||||||
label / pt | label / pt | ||||||||||||||
EXECUÇÃO DE UM SISTEMA DE CONTROLO E MELHORIA DA PRODUTIVIDADE EM TEMPO REAL LIGADO AO ERP DA EMPRESA | |||||||||||||||
Property / summary: IMPLEMENTATION OF A CONTROL SYSTEM AND IMPROVE PRODUCTIVITY LINKED TO REAL TIME THE ENTERPRISE ERP (English) / qualifier | |||||||||||||||
readability score: 0.0004866049286483
| |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
APLICAÇÃO DE UM SISTEMA DE CONTROLO E MELHORAR A PRODUTIVIDADE LIGADA AO TEMPO REAL DO ERP DA EMPRESA (Portuguese) | |||||||||||||||
Property / postal code | |||||||||||||||
Property / postal code: 46006 / rank | |||||||||||||||
Property / location (string) | |||||||||||||||
Property / location (string): Albaida / rank | |||||||||||||||
Property / coordinate location | |||||||||||||||
| |||||||||||||||
Property / coordinate location: 38°50'19.21"N, 0°31'5.48"W / rank | |||||||||||||||
Property / contained in NUTS | |||||||||||||||
Property / contained in NUTS: Province of Valencia / rank | |||||||||||||||
Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 50.0 percent / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 35,991.42 Euro / rank | |||||||||||||||
Property / contained in Local Administrative Unit | |||||||||||||||
Property / contained in Local Administrative Unit: Albaida / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
35,991.414 Euro
| |||||||||||||||
Property / EU contribution: 35,991.414 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / co-financing rate | |||||||||||||||
49.99999861077982 percent
| |||||||||||||||
Property / co-financing rate: 49.99999861077982 percent / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / date of last update | |||||||||||||||
12 June 2023
| |||||||||||||||
Property / date of last update: 12 June 2023 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / location (string) | |||||||||||||||
Albaida | |||||||||||||||
Property / location (string): Albaida / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / coordinate location | |||||||||||||||
38°50'19.21"N, 0°31'5.48"W
| |||||||||||||||
Property / coordinate location: 38°50'19.21"N, 0°31'5.48"W / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / coordinate location: 38°50'19.21"N, 0°31'5.48"W / qualifier | |||||||||||||||
Property / contained in NUTS | |||||||||||||||
Property / contained in NUTS: Province of Valencia / rank | |||||||||||||||
Normal rank |
Latest revision as of 10:09, 11 October 2024
Project Q3249390 in Spain
Language | Label | Description | Also known as |
---|---|---|---|
English | IMPLEMENTATION OF A REAL-TIME PRODUCTIVITY CONTROL AND IMPROVEMENT SYSTEM CONNECTED TO THE COMPANY’S ERP |
Project Q3249390 in Spain |
Statements
35,991.414 Euro
0 references
71,982.83 Euro
0 references
49.99999861077982 percent
0 references
1 April 2017
0 references
31 December 2018
0 references
WINTEX SOCIEDAD ANONIMA
0 references
IMPLANTACIÓN DE UN SISTEMA DE CONTROL Y MEJORA DE LA PRODUCTIVIDAD A TIEMPO REAL CONECTADO A LA ERP DE LA EMPRESA (Spanish)
0 references
IMPLEMENTATION OF A CONTROL SYSTEM AND IMPROVE PRODUCTIVITY LINKED TO REAL TIME THE ENTERPRISE ERP (English)
0.0004866049286483
0 references
MISE EN ŒUVRE D’UN SYSTÈME DE CONTRÔLE ET D’AMÉLIORATION DE LA PRODUCTIVITÉ EN TEMPS RÉEL CONNECTÉ À L’ERP DE L’ENTREPRISE (French)
5 December 2021
0 references
IMPLEMENTIERUNG EINES ECHTZEIT-PRODUKTIVITÄTSSTEUERUNGS- UND VERBESSERUNGSSYSTEMS, DAS MIT DEM ERP DES UNTERNEHMENS VERBUNDEN IST (German)
10 December 2021
0 references
IMPLEMENTATIE VAN EEN REAL-TIME PRODUCTIVITEITSCONTROLE- EN VERBETERINGSSYSTEEM AANGESLOTEN OP HET ERP VAN HET BEDRIJF (Dutch)
18 December 2021
0 references
IMPLEMENTAZIONE DI UN SISTEMA DI CONTROLLO E MIGLIORAMENTO DELLA PRODUTTIVITÀ IN TEMPO REALE COLLEGATO ALL'ERP AZIENDALE (Italian)
17 January 2022
0 references
ΕΦΑΡΜΟΓΉ ΣΥΣΤΉΜΑΤΟΣ ΕΛΈΓΧΟΥ ΚΑΙ ΒΕΛΤΊΩΣΗ ΤΗΣ ΠΑΡΑΓΩΓΙΚΌΤΗΤΑΣ ΠΟΥ ΣΥΝΔΈΕΤΑΙ ΜΕ ΤΟΝ ΠΡΑΓΜΑΤΙΚΌ ΧΡΌΝΟ ΤΗΣ ΕΠΙΧΕΊΡΗΣΗΣ ERP (Greek)
18 August 2022
0 references
IMPLEMENTERING AF ET KONTROLSYSTEM OG FORBEDRING AF PRODUKTIVITETEN KNYTTET TIL VIRKSOMHEDEN ERP I REALTID (Danish)
18 August 2022
0 references
VALVONTAJÄRJESTELMÄN KÄYTTÖÖNOTTO JA TUOTTAVUUDEN PARANTAMINEN REAALIAJASSA YRITYKSEN TOIMINNANOHJAUSJÄRJESTELMÄÄN (Finnish)
18 August 2022
0 references
IMPLIMENTAZZJONI TA ‘SISTEMA TA’ KONTROLL U JTEJBU L-PRODUTTIVITÀ MARBUTA MA ‘ĦIN REALI L-ERP INTRAPRIŻA (Maltese)
18 August 2022
0 references
KONTROLES SISTĒMAS IEVIEŠANA UN PRODUKTIVITĀTES UZLABOŠANA, KAS SAISTĪTA AR UZŅĒMUMA ERP REĀLLAIKU (Latvian)
18 August 2022
0 references
IMPLEMENTÁCIA KONTROLNÉHO SYSTÉMU A ZLEPŠENIE PRODUKTIVITY SPOJENÉ S PODNIKOVÝM ERP V REÁLNOM ČASE (Slovak)
18 August 2022
0 references
CÓRAS RIALAITHE A CHUR CHUN FEIDHME AGUS TÁIRGIÚLACHT ATÁ NASCTHA LE FÍOR-AM A FHEABHSÚ (Irish)
18 August 2022
0 references
ZAVEDENÍ KONTROLNÍHO SYSTÉMU A ZVÝŠENÍ PRODUKTIVITY SPOJENÉ S PODNIKOVÝM ERP V REÁLNÉM ČASE (Czech)
18 August 2022
0 references
APLICAÇÃO DE UM SISTEMA DE CONTROLO E MELHORAR A PRODUTIVIDADE LIGADA AO TEMPO REAL DO ERP DA EMPRESA (Portuguese)
18 August 2022
0 references
KONTROLLISÜSTEEMI RAKENDAMINE JA TOOTLIKKUSE PARANDAMINE, MIS ON SEOTUD ETTEVÕTTE ERP REAALAJAS (Estonian)
18 August 2022
0 references
ELLENŐRZÉSI RENDSZER BEVEZETÉSE ÉS A VALÓS IDEJŰ ERP-HEZ KAPCSOLÓDÓ TERMELÉKENYSÉG JAVÍTÁSA (Hungarian)
18 August 2022
0 references
ВНЕДРЯВАНЕ НА СИСТЕМА ЗА КОНТРОЛ И ПОДОБРЯВАНЕ НА ПРОИЗВОДИТЕЛНОСТТА, СВЪРЗАНА С ERP В РЕАЛНО ВРЕМЕ (Bulgarian)
18 August 2022
0 references
KONTROLĖS SISTEMOS ĮGYVENDINIMAS IR PRODUKTYVUMAS, SUSIJĘS SU ĮMONĖS ERP REALIU LAIKU (Lithuanian)
18 August 2022
0 references
IMPLEMENTACIJA SUSTAVA KONTROLE I POBOLJŠANJE PRODUKTIVNOSTI U REALNOM VREMENU ERP PODUZEĆA (Croatian)
18 August 2022
0 references
INFÖRANDE AV ETT KONTROLLSYSTEM OCH FÖRBÄTTRAD PRODUKTIVITET KOPPLAD TILL FÖRETAGETS AFFÄRSSYSTEM I REALTID (Swedish)
18 August 2022
0 references
IMPLEMENTAREA UNUI SISTEM DE CONTROL ȘI ÎMBUNĂTĂȚIREA PRODUCTIVITĂȚII LEGATE DE ERP-UL ÎNTREPRINDERII (Romanian)
18 August 2022
0 references
IZVAJANJE NADZORNEGA SISTEMA IN IZBOLJŠANJE PRODUKTIVNOSTI, POVEZANE S PODJETJEM ERP V REALNEM ČASU (Slovenian)
18 August 2022
0 references
WDROŻENIE SYSTEMU STEROWANIA I POPRAWA PRODUKTYWNOŚCI W CZASIE RZECZYWISTYM PRZEDSIĘBIORSTWA ERP (Polish)
18 August 2022
0 references
12 June 2023
0 references
Albaida
0 references
Identifiers
20F03040201U_IVCI00000DIGA7224
0 references