E.O. OF LARISSAS TRIKALES: CONSTRUCTION OF ROAD SECTION FROM I/C TO RACHOULAS (Q2808379): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, el, it, es, and other parts: Adding translations: et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,)
(‎Changed label, description and/or aliases in pt)
 
(3 intermediate revisions by 2 users not shown)
label / ptlabel / pt
E.O. DE LARISSAS TRIKALES: CONSTRUÇÃO DE TROÇOS RODOVIÁRIOS DE I/C A RACHOULAS
E.O. DE LARISSAS TRIKALES: CONSTRUÇÃO DA SECÇÃO RODOVIÁRIA DE I/C A RACHOULAS
Property / summary: <p>The Act concerns the improvement of the road section of E.O. LARISAS TRIKALON, from the level Node (I/K) Terpsithea to the off-road Node (R/K) Rachoulas, 5.473 km long, including the road adjustments to the existing road beginning and end, as well as the corresponding side network. Its construction concludes the intervention at the National Road of Larissa – Trikala which acquires characteristics of a modern motorway along its entire length.<br/>The project consists mainly of two sections:<br/>Section A: From I/K Terpsithea to Cutted Earth 3.419 m.<br/>Section B: From Cutted Earth to Rachoula A/K, length 2.054 m.</p> (English) / qualifier
 
readability score: 0.6909200562768372
Amount0.6909200562768372
Unit1
Property / summaryProperty / summary
<p>A lei diz respeito à melhoria do troço rodoviário de E.O. LARISAS Trikalon, do nó de nível (I/K) Terpsithea ao nó off-road (R/K) Rachoulas, com 5,473 km de comprimento, incluindo os ajustamentos da estrada no início e no fim da estrada, bem como a correspondente rede lateral. A sua construção conclui a intervenção na Estrada Nacional de Larissa — Trikala, que adquire características de uma autoestrada moderna ao longo de todo o seu comprimento.<br/>O projeto consiste principalmente em dois troços:<br/>Secção A: De I/K Terpsithea à Terra cortada 3,419 m.<br/>Secção B: Da Terra cortada para Rachoula A/K, comprimento 2,054 m.</p> (Portuguese)
<p>A lei diz respeito à melhoria do troço rodoviário de E.O. LARISAS TRIKALON, do nó de nível (I/K) Terpsithea para o nó todo-o-terreno (R/K) Rachoulas, com 5,473 km de comprimento, incluindo as adaptações rodoviárias ao início e ao fim da estrada existente, bem como a rede lateral correspondente. A sua construção conclui a intervenção na Estrada Nacional de Larissa – Trikala, que adquire características de uma autoestrada moderna ao longo de toda a sua extensão.<br/>O projeto consiste principalmente em dois troços:<br/>Secção A: De I/K Terpsithea a Terra cortada 3,419 m<br/>Secção B: De Terra cortada a Rachoula A/K, comprimento 2,054 m.</p> (Portuguese)
Property / contained in Local Administrative Unit
 
Property / contained in Local Administrative Unit: Commune of Loutro Larissas / rank
 
Normal rank

Latest revision as of 08:59, 9 October 2024

Project Q2808379 in Greece
Language Label Description Also known as
English
E.O. OF LARISSAS TRIKALES: CONSTRUCTION OF ROAD SECTION FROM I/C TO RACHOULAS
Project Q2808379 in Greece

    Statements

    0 references
    27,504,873.0 Euro
    0 references
    1 May 2019
    0 references
    31 August 2023
    0 references
    ΠΕΡΙΦΕΡΕΙΑ ΘΕΣΣΑΛΙΑΣ
    0 references
    0 references

    39°32'59.71"N, 22°14'37.14"E
    0 references
    <p>Η Πράξη αφορά στην βελτίωση του οδικού τμήματος της Ε.Ο. ΛΑΡΙΣΑΣ – ΤΡΙΚΑΛΩΝ, από τον Ισόπεδο Κόμβο (Ι/Κ) Τερψιθέας έως τον Ανισόπεδο Κόμβο (Α/Κ) Ραχούλας, μήκους 5,473 χιλιομέτρων, συμπεριλαμβανομένου των προσαρμογών της οδού στην υφιστάμενη οδό αρχή και τέλους, καθώς και το αντίστοιχο παράπλευρο δίκτυο.<br/>Το συγκεκριμένο οδικό τμήμα αποτελεί ενδοπεριφερειακή οδική σύνδεση και ανήκει στο Διευρωπαϊκό Δίκτυο Μεταφορών (ΔΕΔ-Μ). Με την κατασκευή του ολοκληρώνεται η παρέμβαση στην Ε.Ο. Λάρισας - Τρικάλων η οποία αποκτά χαρακτηριστικά σύγχρονου αυτοκινητόδρομου σε όλο το μήκος της.<br/>Το έργο απαρτίζεται κυρίως από δύο τμήματα:<br/>Τμήμα Α: από Ι/Κ Τερψιθέας έως “Κομμένη Γη” μήκους 3.419 m.<br/>Τμήμα Β: από “Κομμένη Γη” έως Α/Κ Ραχούλας, μήκους 2.054 m.</p> (Greek)
    0 references
    <p>The Act concerns the improvement of the road section of E.O. LARISAS TRIKALON, from the level Node (I/K) Terpsithea to the off-road Node (R/K) Rachoulas, 5.473 km long, including the road adjustments to the existing road beginning and end, as well as the corresponding side network. Its construction concludes the intervention at the National Road of Larissa – Trikala which acquires characteristics of a modern motorway along its entire length.<br/>The project consists mainly of two sections:<br/>Section A: From I/K Terpsithea to Cutted Earth 3.419 m.<br/>Section B: From Cutted Earth to Rachoula A/K, length 2.054 m.</p> (English)
    5 July 2021
    0.6909200562768372
    0 references
    <p>L’opération concerne l’amélioration du tronçon routier de Larissa Trikalon, du nœud Terpsithea (I/K) au nœud Rachoula (A/C), longueur 5,473 km, y compris l’adaptation de la route au début et à la fin existants, ainsi que le réseau latéral correspondant.<br/>Ce tronçon routier est une liaison routière intrarégionale et appartient au réseau transeuropéen de transport (RTE-T). Sa construction complète l’intervention sur la route nationale Larissa — Trikala qui acquiert des caractéristiques d’une autoroute moderne sur toute sa longueur.<br/>Le projet se compose principalement de deux sections:<br/>Section A: de l’I/K Terpsithea à la terre coupée 3,419 m.<br/>Section B: de la coupe à Rachoulas, 2,054 m.</p> (French)
    30 November 2021
    0 references
    <p>Der Betrieb betrifft die Verbesserung des Straßenabschnitts von Larissa Trikalon, vom Knoten Terpsithea (I/K) bis zum Rachoula-Knoten (A/C), Länge 5,473 km, einschließlich der Anpassungen der Straße an den bestehenden Start und Ende der Straße sowie das entsprechende Seitennetz.<br/>Dieser Straßenabschnitt ist eine intraregionale Straßenverbindung und gehört zum transeuropäischen Verkehrsnetz (TEN-V). Der Bau schließt den Eingriff in die Nationalstraße Larissa – Trikala ab, die Merkmale einer modernen Autobahn auf ihrer gesamten Länge erwirbt.<br/>Das Projekt besteht hauptsächlich aus zwei Abschnitten:<br/>Abschnitt A: von I/K Terpsithea bis Cut-off Earth 3,419 m.<br/>Abschnitt B: von Cut nach Rachoulas, 2,054 m.</p> (German)
    6 December 2021
    0 references
    <p>De operatie betreft de verbetering van het weggedeelte van Larissa Trikalon, van het Terpsithea-knooppunt (I/K) tot het knooppunt Rachoula (A/C), lengte 5,473 km, inclusief de aanpassing van de weg aan de bestaande start- en eindweg, alsmede het bijbehorende zijnet.<br/>Dit weggedeelte is een intraregionale wegverbinding en behoort tot het trans-Europees vervoersnetwerk (TEN-T). De aanleg van de autosnelweg rond de National Road Larissa — Trikala, die over de gehele lengte kenmerken van een moderne autosnelweg verwerft, maakt deel uit van het project:<br/>Section A: van I/K Terpsithea tot afgesneden aarde 3,419 m.<br/>Section B: van Cut tot Rachoulas, 2,054 m.</p> (Dutch)
    16 December 2021
    0 references
    <p>L'operazione riguarda il miglioramento del tratto stradale di Larissa Trikalon, dal nodo Terpsithea (I/K) al nodo Rachoula (A/C), lunghezza 5,473 km, compresi gli adeguamenti della strada all'inizio e alla fine della strada esistente, nonché la corrispondente rete laterale.<br/>Questo tratto stradale è un collegamento stradale intraregionale e appartiene alla rete transeuropea di trasporto (TEN-T). La sua costruzione completa l'intervento nella Strada Nazionale Larissa — Trikala che acquisisce caratteristiche di una moderna autostrada per tutta la sua lunghezza.<br/>Il progetto è costituito principalmente da due tratti:<br/>Sezione A: da I/K Terpsithea a Cut-off Earth 3,419 m.<br/>Sezione B: da Cut a Rachoulas, 2,054 m.</p> (Italian)
    15 January 2022
    0 references
    <p>La operación se refiere a la mejora del tramo de carretera de Larissa Trikalon, desde el nodo Terpsithea (I/K) hasta el nodo Rachoula (A/C), longitud 5,473 km, incluyendo los ajustes de la carretera hasta el inicio y el final de la carretera existente, así como la red lateral correspondiente. Su construcción completa la intervención en la carretera nacional Larissa — Trikala, que adquiere características de una autopista moderna a lo largo de toda su longitud.<br/>El proyecto consta principalmente de dos tramos:<br/>Sección A: de Terpsithea I/K a Cut-off Earth 3,419 m.<br/>Sección B: de Cut a Rachoulas, 2,054 m.</p> (Spanish)
    15 January 2022
    0 references
    <p>Seadus käsitleb E.O. LARISAS Trikaloni teelõigu parandamist alates sõlmpunktist (I/K) Terpsithea kuni maastikusõlme (R/K) Rachoulas (R/K) Rachoulas, mis on 5,47 km pikk, sealhulgas olemasoleva tee kohandust olemasoleva tee alguses ja lõpus, samuti vastavat külgvõrku. Selle ehitus lõpetab sekkumise Larissa – Trikala üleriigilisel maanteel, mis omandab kaasaegse kiirtee omadused kogu selle pikkuses.<br/>Projekt koosneb peamiselt kahest osast:<br/>A jagu: Alates I/K Terpsithea et lõigatud Maa 3,419 m.<br/> jagu B: Lõigatud Maast kuni Rachoulani A/K, pikkus 2,054 m.</p> (Estonian)
    28 July 2022
    0 references
    <p>Aktas yra susijęs su E.O. LARISAS Trikalon kelio ruožo gerinimu nuo mazgo (I/K) Terpsithea iki visureigio mazgo (R/K) Rachoulas, 5,473 km ilgio, įskaitant esamo kelio pradžios ir pabaigos kelio koregavimą, taip pat atitinkamą šoninį tinklą. Jos statyba užbaigia intervenciją į Larisos-Trikalos nacionalinį kelią, kuris įgyja modernaus greitkelio charakteristikas per visą jo ilgį. Projektą daugiausia sudaro dvi atkarpos:<br/>A sekcija: Nuo I/K Terpsithea iki Cutted Earth 3,419 m.<br/> B skirsnis: Nuo pjaustytos žemės iki Rachoula A/K, ilgis 2,054 m.</p> (Lithuanian)
    28 July 2022
    0 references
    <p>Zakon se odnosi na poboljšanje dionice ceste E.O. LARISAS Trikalon, od razine Node (I/K) Terpsithea do off-road čvora (R/K) Rachoulas, dužine 5,473 km, uključujući prilagodbe ceste na postojećem početku i kraju ceste, kao i odgovarajuću bočnu mrežu. Njegova izgradnja završava intervenciju na Nacionalnoj cesti Larissa – Trikala koja stječe obilježja moderne autoceste duž cijele svoje duljine.<br/>Projekt se uglavnom sastoji od dvije dionice:<br/>Odjeljak A: Od I/K Terpsithea do rezane Zemlje 3,419 m.<br/>Odjeljak B: Od rezane Zemlje do Rachoule A/K, dužina 2,054 m.</p> (Croatian)
    28 July 2022
    0 references
    <p>Zákon sa týka zlepšenia cestného úseku Trikalon E.O. LARISAS, od úrovne Uzol (I/K) Terpsithea po off-road uzol (R/K) Rachoulas, dlhý 5,473 km, vrátane úpravy cesty na existujúce začiatok a koniec cesty, ako aj príslušnú bočnú sieť. Jeho výstavba uzatvára zásah na Národnej ceste Larissa – Trikala, ktorá nadobúda vlastnosti modernej diaľnice po celej svojej dĺžke.<br/>Projekt pozostáva najmä z dvoch úsekov:<br/>oddiel A: Z I/K Terpsithea na Cutted Earth 3,419 m.<br/>oddiel B: Z rezanej Zeme do Rachouly A/K, dĺžka 2,054 m.</p> (Slovak)
    28 July 2022
    0 references
    <p>Laki koskee E.O. LARISAS Trikalonin tieosuuden parantamista tasolta Node (I/K) Terpsithea tasolta (R/K) Rachoulas 5,473 km pitkä, mukaan lukien olemassa olevan tien alku- ja päätetien säädöt sekä vastaava sivuverkko. Sen rakentaminen päättää toimenpiteen Larissan – Trikalan kansallistielle, joka hankkii modernin moottoritien ominaisuudet koko sen pituudelta.<br/>hanke koostuu pääasiassa kahdesta osasta:<br/>Pääosa A: I/K Terpsitheasta leikattuun maahan 3,419 m.<br/>Pääluokka B: Cutted Earth to Rachoula A/K, pituus 2,054 m.</p> (Finnish)
    28 July 2022
    0 references
    <p>Akt dotyczy poprawy odcinka drogi E.O. LARISAS Trikalon, od węzła poziomu (I/K) Terpsithea do węzła terenowego (R/K) Rachoulas, o długości 5,473 km, w tym dostosowania dróg do początku i końca istniejącej drogi, a także odpowiedniej sieci bocznej. Jego budowa kończy interwencję na Drodze Krajowej Larissa – Trikala, która nabywa cechy nowoczesnej autostrady na całej swojej długości.<br/>Projekt składa się głównie z dwóch odcinków:<br/>Sekcja A: Od I/K Terpsithea do Cutted Earth 3,419 m.<br/>Sekcja B: Od Cutted Earth do Rachoula A/K, długość 2,054 m.</p> (Polish)
    28 July 2022
    0 references
    <p>A törvény az E.O. LARISAS Trikalon útszakaszának javítására vonatkozik, a Terpsithea (I/K) szinttől az off-road csomóponttól (R/K) Rachoulasig, 5,473 km hosszú, beleértve a meglévő út elején és végének útmódosítását, valamint a megfelelő oldalhálózatot. A projekt a Larissa – Trikala Nemzeti Úton fejeződik be, amely teljes hosszában egy modern autópálya jellemzőit szerzi meg.<br/>A projekt főként két szakaszból áll:<br/>A szakasz: I/K Terpsithea és vágott Föld 3,419 m.<br/> B szakasz: A vágott Földtől a Rachoula A/K-ig, hossz 2,054 m.</p> (Hungarian)
    28 July 2022
    0 references
    <p>Zákon se týká zlepšení silničního úseku E.O. LARISAS Trikalon, od úrovně uzlu (I/K) Terpsithea po terénní uzel (R/K) Rachoulas, délka 5,473 km, včetně úprav stávající silnice na začátku a na konci, jakož i odpovídající boční síť. Její výstavba uzavírá zásah na Národní silnici Larissa – Trikala, která získává vlastnosti moderní dálnice po celé délce.<br/>Projekt se skládá především ze dvou úseků:<br/>Sekce A: Od I/K Terpsithea k řezané zemi 3,419 m.<br/>Sekce B: Od řezané země k Rachoula A/K, délka 2,054 m.</p> (Czech)
    28 July 2022
    0 references
    <p>Likums attiecas uz E.O. LARISAS Trikalon ceļa posma uzlabošanu no Node (I/K) Terpsithea līmeņa līdz bezceļa mezglam (R/K) Rachoulas, kas ir 5,473 km garš, ieskaitot ceļa pielāgošanu esošajam ceļa sākumam un beigām, kā arī atbilstošajam sānu tīklam. Tās būvniecība noslēdz intervenci pie National Road of Larissa — Trikala, kas iegūst īpašības mūsdienu automaģistrāles visā tās garumā.<br/>Projekts sastāv galvenokārt no diviem posmiem:<br/>A sadaļa: No I/K Terpsithea līdz Cutted Earth 3,419 m.<br/>B iedaļa: No grieztas zemes līdz Rachoula A/K, garums 2,054 m.</p> (Latvian)
    28 July 2022
    0 references
    &lt;p>Baineann an tAcht le feabhas a chur ar an gcuid bóthair de E.O. Larisas Trikalon, ón leibhéal Nód (I/K) Terpsithea go dtí an Nód easbhóthair (R/K) Rachoulas, 5.473 km ar fhad, lena n-áirítear na coigeartuithe bóthair ar an mbóthar atá ann faoi láthair ag tosú agus ag deireadh, chomh maith leis an ngréasán taobh comhfhreagrach. Críochnaíonn a thógáil an idirghabháil ag Bóthar Náisiúnta Larissa — Trikala a fhaigheann tréithe mótarbhealaigh nua-aimseartha ar feadh a fhaid iomláin. &lt;br/>Tá dhá chuid sa tionscadal den chuid is mó: &lt;br/>Roinn A: Ó I/K Terpsithea go Domhan gearrtha 3.419 m. &lt;br/>Roinn B: Ón Domhan gearrtha go Rachoula A/K, fad 2.054 m. & lt;/p> (Irish)
    28 July 2022
    0 references
    <p>Zakon se nanaša na izboljšanje cestnega odseka E.O. LARISAS Trikalon, od nivoja Node (I/K) Terpsithea do terenskega vozlišča (R/K) Rachoulas, dolžine 5,473 km, vključno s prilagoditvijo ceste obstoječim začetkom in koncem ceste ter ustreznim stranskim omrežjem. Njegova gradnja zaključuje intervencijo na državni cesti Larissa – Trikala, ki pridobi značilnosti sodobne avtoceste po vsej dolžini.<br/>Projekt je sestavljen predvsem iz dveh odsekov:<br/>Odsek A: Od I/K Terpsithea do razrezane Zemlje 3,419 m.<br/>Oddelek B: Od razrezane Zemlje do Rachoule A/K, dolžina 2,054 m.</p> (Slovenian)
    28 July 2022
    0 references
    <p>Законът се отнася до подобряването на пътния участък на E.O. LARISAS Trikalon, от ниво Node (I/K) Terpsithea до офроуд възел (R/K) Rachoulas, с дължина 5,473 km, включително регулирането на пътя към съществуващия път в началото и края, както и съответната странична мрежа. Неговото изграждане завършва намесата на Националния път Лариса — Трикала, който придобива характеристики на модерна автомагистрала по цялата си дължина.<br/>Проектът се състои основно от две отсечки:<br/>Секция А: От I/K Terpsithea до Cutted Earth 3,419 m.<br/>раздел Б: От нарязана земя до Rachoula A/K, дължина 2,054 m.</p> (Bulgarian)
    28 July 2022
    0 references
    <p>L-Att jikkonċerna t-titjib tas-sezzjoni tat-triq ta’ E.O. LARISAS Trikalon, mil-livell Node (I/K) Terpsithea sa Node off-road (R/K) Rachoulas, tul ta’ 5.473 km, inklużi l-aġġustamenti tat-toroq għat-triq eżistenti li tibda u tispiċċa, kif ukoll in-netwerk korrispondenti tal-ġenb. Il-kostruzzjoni tiegħu tikkonkludi l-intervent fit-Triq Nazzjonali ta’ Larissa — Trikala li takkwista karatteristiċi ta’ awtostrada moderna tul it-tul kollu tagħha.<br/>Il-proġett jikkonsisti prinċipalment f’żewġ sezzjonijiet:<br/>Taqsima A: Minn I/K Terpsithea għad-Dinja maqtugħa 3.419 m.<br/> Taqsima B: Minn Art maqtugħa għal Rachoula A/K, tul 2.054 m.</p> (Maltese)
    28 July 2022
    0 references
    <p>A lei diz respeito à melhoria do troço rodoviário de E.O. LARISAS TRIKALON, do nó de nível (I/K) Terpsithea para o nó todo-o-terreno (R/K) Rachoulas, com 5,473 km de comprimento, incluindo as adaptações rodoviárias ao início e ao fim da estrada existente, bem como a rede lateral correspondente. A sua construção conclui a intervenção na Estrada Nacional de Larissa – Trikala, que adquire características de uma autoestrada moderna ao longo de toda a sua extensão.<br/>O projeto consiste principalmente em dois troços:<br/>Secção A: De I/K Terpsithea a Terra cortada 3,419 m<br/>Secção B: De Terra cortada a Rachoula A/K, comprimento 2,054 m.</p> (Portuguese)
    28 July 2022
    0 references
    <p>Loven vedrører forbedring af vejafsnittet af E.O. LARISAS Trikalon, fra niveau Node (I/K) Terpsithea til terrængående Node (R/K) Rachoulas, 5,473 km lang, herunder vejtilpasninger til den eksisterende vejs begyndelse og afslutning samt det tilsvarende sidenet. Dens opførelse afslutter interventionen ved National Road of Larissa — Trikala, som får karakter af en moderne motorvej langs hele dens længde.<br/>Projektet består hovedsagelig af to strækninger:<br/>Afsnit A: Fra I/K Terpsithea til udskåret jord 3,419 m.<br/>Afsnit B: Fra udskåret jord til Rachoula A/K, længde 2,054 m.</p> (Danish)
    28 July 2022
    0 references
    <p>Legea se referă la îmbunătățirea tronsonului rutier al E.O. LARISAS Trikalon, de la nivelul Nod (I/K) Terpsithea până la Nodul off-road (R/K) Rachoulas, cu o lungime de 5,473 km, inclusiv adaptările rutiere la începutul și sfârșitul drumului existent, precum și rețeaua laterală corespunzătoare. Construcția sa încheie intervenția pe drumul național Larissa – Trikala, care dobândește caracteristicile unei autostrăzi moderne de-a lungul întregii sale lungimi.<br/>Proiectul constă în principal din două secțiuni:<br/>Secțiunea A: De la I/K Terpsithea la Pământ tăiat 3,419 m.<br/>Secțiunea B: De la Pământ tăiat la Rachoula A/K, lungime 2,054 m.</p> (Romanian)
    28 July 2022
    0 references
    <p> Lagen gäller förbättring av vägavsnittet i E.O. LARISAS Trikalon, från nivånoden (I/K) Terpsithea till terrängnoden (R/K) Rachoulas, 5,473 km lång, inklusive vägjusteringar av den befintliga vägens början och slut, samt motsvarande sidonät. Bygget avslutas med ingripandet på Larissa-trikalas riksväg, som förvärvar egenskaper hos en modern motorväg längs hela dess längd.<br/>Projektet består huvudsakligen av två sträckor:<br/>Avsnitt A: Från I/K Terpsithea till Cutted Earth 3,419 m.<br/>Avsnitt B: Från klippt jord till Rachoula A/K, längd 2,054 m.</p> (Swedish)
    28 July 2022
    0 references

    Identifiers

    5.038.227
    0 references