FORESTRY PLUMBING WORKS IN THE VALLEY MALEPASSO_AQUILONIA (Q4271773): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,) |
(Changed label, description and/or aliases in pt) |
||||||||||||||
(6 intermediate revisions by 2 users not shown) | |||||||||||||||
label / pt | label / pt | ||||||||||||||
TRABALHOS DE AMOSTRAGEM FLORESTAL NO VALLEY MALEPASSO_AQUILONIA | |||||||||||||||
Property / summary: FORESTRY PLUMBING WORK IN THE VALLEY MALEPASSO (English) / qualifier | |||||||||||||||
readability score: 0.0280768906093696
| |||||||||||||||
Property / summary | Property / summary | ||||||||||||||
TRABALHOS DE PLUMBING FLORESTAL NO VALLEY MALEPASSO (Portuguese) | |||||||||||||||
Property / intervention field | |||||||||||||||
Property / intervention field: Adaptation to climate change measures and prevention and management of climate related risks e.g. erosion, fires, flooding, storms and drought, including awareness raising, civil protection and disaster management systems and infrastructures / rank | |||||||||||||||
Property / intervention field | |||||||||||||||
Property / intervention field: Risk prevention and management of non-climate related natural risks (i.e. earthquakes) and risks linked to human activities (e.g. technological accidents), including awareness raising, civil protection and disaster management systems and infrastructures / rank | |||||||||||||||
Property / contained in Local Administrative Unit | |||||||||||||||
Property / contained in Local Administrative Unit: Aquilonia / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / contained in NUTS | |||||||||||||||
Property / contained in NUTS: Province of Avellino / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / priority axis | |||||||||||||||
Property / priority axis: PREVENTION OF NATURAL AND ANTHROPOGENIC RISKS / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / thematic objective | |||||||||||||||
Property / thematic objective: Climate change adaptation and risk prevention / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / intervention field | |||||||||||||||
Property / intervention field: Adaptation to climate change measures and prevention and management of climate related risks e.g. erosion, fires, flooding, storms and drought, including awareness raising, civil protection and disaster management systems and infrastructures / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / start time | |||||||||||||||
26 May 2020
| |||||||||||||||
Property / start time: 26 May 2020 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / date of last update | |||||||||||||||
8 April 2023
| |||||||||||||||
Property / date of last update: 8 April 2023 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / Call for proposal | |||||||||||||||
Property / Call for proposal: Dgr 653/2019 POR FESR 2014/2020 Asse V ob. op. 5.1 / rank | |||||||||||||||
Normal rank |
Latest revision as of 20:54, 11 October 2024
Project Q4271773 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | FORESTRY PLUMBING WORKS IN THE VALLEY MALEPASSO_AQUILONIA |
Project Q4271773 in Italy |
Statements
562,500.0 Euro
0 references
750,000.0 Euro
0 references
75.0 percent
0 references
26 May 2020
0 references
COMUNE DI AQUILONIA
0 references
LAVORI DI SISTEMAZIONE IDRAULICO FORESTALE DEL VALLONE MALEPASSO (Italian)
0 references
FORESTRY PLUMBING WORK IN THE VALLEY MALEPASSO (English)
2 February 2022
0.0280768906093696
0 references
TRAVAUX DE PLOMBERIE FORESTIÈRE DANS LA VALLÉE MALEPASSO (French)
3 February 2022
0 references
TRABAJOS DE FONTANERÍA FORESTAL EN EL VALLE MALEPASSO (Spanish)
4 February 2022
0 references
XOGĦOL TA’ PLUMBING TAL-FORESTRIJA FIL-WIED TA’ MALEPASSO (Maltese)
23 July 2022
0 references
TRABALHOS DE PLUMBING FLORESTAL NO VALLEY MALEPASSO (Portuguese)
23 July 2022
0 references
MIŠKININKYSTĖS VANDENTIEKIO DARBAI MALEPASSO SLĖNYJE (Lithuanian)
23 July 2022
0 references
ГОРСКА ВОДОПРОВОДНА ДЕЙНОСТ В ДОЛИНАТА MALEPASSO (Bulgarian)
23 July 2022
0 references
ERDÉSZETI VÍZVEZETÉK-ÉPÍTÉSI MUNKÁK A MALEPASSO VÖLGYBEN (Hungarian)
23 July 2022
0 references
OBAIR PHLUIMÉIREACHTA FORAOISEACHTA I NGLEANN MALEPASSO (Irish)
23 July 2022
0 references
AQUILONIA
0 references
8 April 2023
0 references