(A19_075_2015_0750008_1010) CREOMALOMBARDI 100 KWH (Q2065880): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,)
(‎Changed label, description and/or aliases in pt)
 
(6 intermediate revisions by 2 users not shown)
label / ptlabel / pt
(A19_075_2015_0750008_1010) CREOMALOMBARDI 100 KWH
(A19_075_2015_0750008_1010) CREOMBARDI 100 KWH
Property / start time
25 February 2015
Timestamp+2015-02-25T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / start time: 25 February 2015 / rank
Normal rank
 
Property / beneficiary name (string)
CREMA LOMBARDI SNC DI FRANCESCO E LORENZO LOMBARDI
 
Property / beneficiary name (string): CREMA LOMBARDI SNC DI FRANCESCO E LORENZO LOMBARDI / rank
Normal rank
 
Property / beneficiary
 
Property / beneficiary: Q293057 / rank
Normal rank
 
Property / summary: INSTALLATION OF 100 KWP PHOTOVOLTAIC POWER PLANT ON MIXED-USE BUILDINGS INSTALLED IN VECCIANO VIA COMMON VACCINE 4. (English) / qualifier
 
readability score: 0.3049543874332875
Amount0.3049543874332875
Unit1
Property / summaryProperty / summary
INSTALAÇÃO DE UMA CENTRAL FOTOVOLTAICA DE 100 KWP EM EDIFÍCIOS DE USO MISTO INSTALADOS EM VECCIANO ATRAVÉS DA VACINA COMUM 4. (Portuguese)
INSTALAÇÃO DE UTILIZADORES FOTOVOLTAICOS DE 100 KWP EM EDIFÍCIOS DE USO MISTO INSTALADOS EM VECCIANO ATRAVÉS DA VACINA COMUM 4. (Portuguese)
Property / contained in Local Administrative Unit
 
Property / contained in Local Administrative Unit: Firenze / rank
 
Normal rank
Property / beneficiary
 
Property / beneficiary: CREMA LOMBARDI SNC DI FRANCESCO E LORENZO LOMBARDI / rank
 
Normal rank
Property / beneficiary name (string)
 
CREMA LOMBARDI SNC DI FRANCESCO E LORENZO LOMBARDI
Property / beneficiary name (string): CREMA LOMBARDI SNC DI FRANCESCO E LORENZO LOMBARDI / rank
 
Normal rank
Property / priority axis
 
Property / priority axis: SUPPORTING THE TRANSITION TO A LOW-CARBON ECONOMY IN ALL SECTORS / rank
 
Normal rank
Property / thematic objective
 
Property / thematic objective: Low-carbon economy / rank
 
Normal rank
Property / start time
 
30 June 2015
Timestamp+2015-06-30T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / start time: 30 June 2015 / rank
 
Normal rank
Property / date of last update
 
8 April 2023
Timestamp+2023-04-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / date of last update: 8 April 2023 / rank
 
Normal rank
Property / Call for proposal
 
Property / Call for proposal: 075 - Bando Energia 2 / rank
 
Normal rank

Latest revision as of 19:08, 9 October 2024

Project Q2065880 in Italy
Language Label Description Also known as
English
(A19_075_2015_0750008_1010) CREOMALOMBARDI 100 KWH
Project Q2065880 in Italy

    Statements

    0 references
    29,198.0 Euro
    0 references
    58,396.0 Euro
    0 references
    50.0 percent
    0 references
    30 June 2015
    0 references
    18 October 2017
    0 references
    25 February 2017
    0 references
    CREMA LOMBARDI SNC DI FRANCESCO E LORENZO LOMBARDI
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    INSTALLAZIONE IMPIANTO FOTOVOLTAICO DI POTENZA 100 KWP SULLE COPERTURE DI FABBRICATI AD USO PROMISCUO POSTI IN VECCHIANO VIA DEL BECCACCINO 4. (Italian)
    0 references
    INSTALLATION OF 100 KWP PHOTOVOLTAIC POWER PLANT ON MIXED-USE BUILDINGS INSTALLED IN VECCIANO VIA COMMON VACCINE 4. (English)
    0.3049543874332875
    0 references
    INSTALLATION D’UN SYSTÈME PHOTOVOLTAÏQUE DE 100 KWP SUR LES TOITS DE BÂTIMENTS À USAGE PROMIS, PLACÉS À VECCHIANO VIA DEL PECCACCINO 4. (French)
    16 December 2021
    0 references
    INSTALLATIE VAN 100 KWP VERMOGEN FOTOVOLTAÏSCHE SYSTEEM OP DE DAKEN VAN GEBOUWEN VOOR PROMISCUUS GEBRUIK GEPLAATST IN VECCHIANO VIA DEL PECCACCINO 4. (Dutch)
    23 December 2021
    0 references
    INSTALLATION VON 100 KWP PHOTOVOLTAIKANLAGE AUF DEN DÄCHERN VON GEBÄUDEN FÜR DEN PROMISCUOUS EINSATZ IN VECCHIANO VIA DEL PECCACCINO 4. (German)
    24 December 2021
    0 references
    INSTALACIÓN DE UN SISTEMA FOTOVOLTAICO DE POTENCIA DE 100 KWP EN LOS TECHOS DE EDIFICIOS PARA USO PROMISCUO COLOCADOS EN VECCHIANO VÍA DEL PECCACCINO 4. (Spanish)
    25 January 2022
    0 references
    INSTALLATION AF 100 KWP FOTOVOLTAISK KRAFTVÆRK PÅ BYGNINGER MED BLANDET ANVENDELSE INSTALLERET I VECCIANO VIA FÆLLES VACCINE 4. (Danish)
    5 July 2022
    0 references
    ΕΓΚΑΤΆΣΤΑΣΗ ΦΩΤΟΒΟΛΤΑΪΚΟΎ ΣΤΑΘΜΟΎ ΙΣΧΎΟΣ 100 KWP ΣΕ ΚΤΊΡΙΑ ΜΙΚΤΉΣ ΧΡΉΣΗΣ ΠΟΥ ΕΓΚΑΘΊΣΤΑΝΤΑΙ ΣΤΟ VECCIANO ΜΈΣΩ ΚΟΙΝΟΎ ΕΜΒΟΛΊΟΥ 4. (Greek)
    5 July 2022
    0 references
    UGRADNJA FOTONAPONSKE ELEKTRANE 100 KWP NA ZGRADE MJEŠOVITE NAMJENE INSTALIRANE U VECCIANU PUTEM ZAJEDNIČKOG CJEPIVA 4. (Croatian)
    5 July 2022
    0 references
    INSTALAREA UNEI CENTRALE FOTOVOLTAICE DE 100 KWP PE CLĂDIRI CU UTILIZARE MIXTĂ INSTALATE ÎN VECCIANO PRIN INTERMEDIUL VACCINULUI COMUN 4. (Romanian)
    5 July 2022
    0 references
    INŠTALÁCIA FOTOVOLTAICKEJ ELEKTRÁRNE S VÝKONOM 100 KWP NA ZMIEŠANÉ BUDOVY INŠTALOVANÉ VO VECCIANE PROSTREDNÍCTVOM SPOLOČNEJ VAKCÍNY 4. (Slovak)
    5 July 2022
    0 references
    INSTALLAZZJONI TA’ IMPJANT TAL-ENERĠIJA FOTOVOLTAJKA TA’ 100 KWP F’BINI B’UŻU MĦALLAT INSTALLAT F’VECCIANO PERMEZZ TAL-VAĊĊIN KOMUNI 4. (Maltese)
    5 July 2022
    0 references
    INSTALAÇÃO DE UTILIZADORES FOTOVOLTAICOS DE 100 KWP EM EDIFÍCIOS DE USO MISTO INSTALADOS EM VECCIANO ATRAVÉS DA VACINA COMUM 4. (Portuguese)
    5 July 2022
    0 references
    100 KWP:N AURINKOSÄHKÖVOIMALAN ASENTAMINEN SEKAKÄYTÖSSÄ OLEVIIN RAKENNUKSIIN, JOTKA ON ASENNETTU VECCIANOON YHTEISEN ROKOTTEEN AVULLA 4. (Finnish)
    5 July 2022
    0 references
    INSTALACJA ELEKTROWNI FOTOWOLTAICZNEJ O MOCY 100 KWP W BUDYNKACH O MIESZANYM UŻYTKOWANIU ZAINSTALOWANYCH W VECCIANO ZA POMOCĄ WSPÓLNEJ SZCZEPIONKI 4. (Polish)
    5 July 2022
    0 references
    NAMESTITEV 100 KWP FOTONAPETOSTNE ELEKTRARNE NA STAVBE ZA MEŠANO UPORABO, NAMEŠČENE V VECCIANU S SKUPNIM CEPIVOM 4. (Slovenian)
    5 July 2022
    0 references
    INSTALACE FOTOVOLTAICKÉ ELEKTRÁRNY O VÝKONU 100 KWP VE SMÍŠENÝCH BUDOVÁCH INSTALOVANÝCH VE VECCIANO PROSTŘEDNICTVÍM BĚŽNÉ VAKCÍNY 4. (Czech)
    5 July 2022
    0 references
    100 KWP FOTOVOLTINĖS ELEKTRINĖS ĮRENGIMAS MIŠRIOS PASKIRTIES PASTATUOSE, ĮRENGTUOSE VECCIANO NAUDOJANT BENDRĄ VAKCINĄ 4. (Lithuanian)
    5 July 2022
    0 references
    100 KWP FOTOELEMENTU SPĒKSTACIJAS UZSTĀDĪŠANA JAUKTA TIPA ĒKĀS, KAS UZSTĀDĪTAS VECCIANO, IZMANTOJOT PARASTO VAKCĪNU 4. (Latvian)
    5 July 2022
    0 references
    ИНСТАЛИРАНЕ НА ФОТОВОЛТАИЧНА ЦЕНТРАЛА 100 KWP ВЪРХУ СГРАДИ СЪС СМЕСЕНО ПРЕДНАЗНАЧЕНИЕ, ИНСТАЛИРАНИ ВЪВ VECCIANO ЧРЕЗ ОБЩА ВАКСИНА 4. (Bulgarian)
    5 July 2022
    0 references
    100 KWP FOTOVOLTAIKUS ERŐMŰ TELEPÍTÉSE VEGYES HASZNÁLATÚ ÉPÜLETEKBE VECCIANO TERÜLETÉN, KÖZÖS 4. OLTÓANYAGON KERESZTÜL. (Hungarian)
    5 July 2022
    0 references
    GLÉASRA CUMHACHTA FÓTAVOLTACH 100 KWP A SHUITEÁIL AR FHOIRGNIMH INA BHFUIL ÚSÁID MHEASCTHA SUITEÁILTE I VECCIANO TRÍ VACSAÍN CHOITEANN 4. (Irish)
    5 July 2022
    0 references
    INSTALLATION AV 100 KWP SOLCELLSKRAFTVERK PÅ BYGGNADER FÖR BLANDAD ANVÄNDNING SOM INSTALLERATS I VECCIANO VIA VANLIGT VACCIN 4. (Swedish)
    5 July 2022
    0 references
    100 KWP FOTOGALVAANILISE ELEKTRIJAAMA PAIGALDAMINE MITMEOTSTARBELISTELE HOONETELE, MIS ON PAIGALDATUD VECCIANOSSE ÜHISE VAKTSIINIGA 4. (Estonian)
    5 July 2022
    0 references
    VECCHIANO
    0 references
    8 April 2023
    0 references

    Identifiers