ENTRUSTMENT OF THE ORGANISATION OF THE MONITORING COMMITTEE AND OF THE PRELIMINARY TECHNICAL MEETING (Q4183547): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: Setting new description) |
(Added qualifier: readability score (P590521): 0.0007763351714108) |
||||||||||||||
(16 intermediate revisions by 2 users not shown) | |||||||||||||||
label / es | label / es | ||||||||||||||
ATRIBUCIÓN DE LA ORGANIZACIÓN DEL COMITÉ DE SEGUIMIENTO Y DE LA REUNIÓN TÉCNICA PRELIMINAR | |||||||||||||||
label / en | label / en | ||||||||||||||
ENTRUSTMENT OF THE ORGANISATION OF THE MONITORING COMMITTEE AND OF THE PRELIMINARY TECHNICAL MEETING | |||||||||||||||
label / fr | label / fr | ||||||||||||||
MANDAT DE L’ORGANISATION DU COMITÉ DE SUIVI ET DE LA RÉUNION TECHNIQUE PRÉLIMINAIRE | |||||||||||||||
label / de | label / de | ||||||||||||||
BETRAUUNG DER ORGANISATION DES BEGLEITAUSSCHUSSES UND DER VORLÄUFIGEN TECHNISCHEN SITZUNG | |||||||||||||||
label / nl | label / nl | ||||||||||||||
BELASTEN MET DE ORGANISATIE VAN HET TOEZICHTCOMITÉ EN DE VOORBEREIDENDE TECHNISCHE VERGADERING | |||||||||||||||
label / da | label / da | ||||||||||||||
OVERDRAGELSE AF TILRETTELÆGGELSEN AF OVERVÅGNINGSUDVALGET OG DET FORELØBIGE TEKNISKE MØDE | |||||||||||||||
label / el | label / el | ||||||||||||||
ΑΝΆΘΕΣΗ ΤΗΣ ΟΡΓΆΝΩΣΗΣ ΤΗΣ ΕΠΙΤΡΟΠΉΣ ΠΑΡΑΚΟΛΟΎΘΗΣΗΣ ΚΑΙ ΤΗΣ ΠΡΟΚΑΤΑΡΚΤΙΚΉΣ ΤΕΧΝΙΚΉΣ ΣΥΝΕΔΡΊΑΣΗΣ | |||||||||||||||
label / hr | label / hr | ||||||||||||||
POVJERAVANJE ORGANIZACIJE ODBORA ZA PRAĆENJE I PRELIMINARNOG TEHNIČKOG SASTANKA | |||||||||||||||
label / ro | label / ro | ||||||||||||||
ÎNCREDINȚAREA ORGANIZĂRII COMITETULUI DE MONITORIZARE ȘI A REUNIUNII TEHNICE PRELIMINARE | |||||||||||||||
label / sk | label / sk | ||||||||||||||
POVERENIE ORGANIZÁCIOU MONITOROVACIEHO VÝBORU A PREDBEŽNÝM TECHNICKÝM ZASADNUTÍM | |||||||||||||||
label / mt | label / mt | ||||||||||||||
INKARIGU TAL-ORGANIZZAZZJONI TAL-KUMITAT TA’ MONITORAĠĠ U TAL-LAQGĦA TEKNIKA PRELIMINARI | |||||||||||||||
label / pt | label / pt | ||||||||||||||
ATRIBUIÇÃO DA ORGANIZAÇÃO DO COMITÉ DE ACOMPANHAMENTO E DA REUNIÃO TÉCNICA PRELIMINAR | |||||||||||||||
label / fi | label / fi | ||||||||||||||
SEURANTAKOMITEAN JA ALUSTAVAN TEKNISEN KOKOUKSEN JÄRJESTÄMINEN | |||||||||||||||
label / pl | label / pl | ||||||||||||||
POWIERZENIE ORGANIZACJI KOMITETU MONITORUJĄCEGO I WSTĘPNEGO POSIEDZENIA TECHNICZNEGO | |||||||||||||||
label / sl | label / sl | ||||||||||||||
POOBLASTITEV ORGANIZACIJE NADZORNEGA ODBORA IN PREDHODNEGA TEHNIČNEGA SESTANKA | |||||||||||||||
label / cs | label / cs | ||||||||||||||
POVĚŘENÍ ORGANIZACÍ MONITOROVACÍHO VÝBORU A PŘEDBĚŽNÉHO TECHNICKÉHO ZASEDÁNÍ | |||||||||||||||
label / lt | label / lt | ||||||||||||||
STEBĖSENOS KOMITETO ORGANIZAVIMO IR PRELIMINARAUS TECHNINIO POSĖDŽIO PAVEDIMAS | |||||||||||||||
label / lv | label / lv | ||||||||||||||
UZRAUDZĪBAS KOMITEJAS UN PROVIZORISKĀS TEHNISKĀS SANĀKSMES ORGANIZĒŠANAS UZTICĒŠANA | |||||||||||||||
label / bg | label / bg | ||||||||||||||
ВЪЗЛАГАНЕ НА ОРГАНИЗАЦИЯТА НА МОНИТОРИНГОВИЯ КОМИТЕТ И НА ПРЕДВАРИТЕЛНАТА ТЕХНИЧЕСКА СРЕЩА | |||||||||||||||
label / hu | label / hu | ||||||||||||||
A MONITORINGBIZOTTSÁG SZERVEZÉSÉNEK ÉS AZ ELŐZETES TECHNIKAI ÜLÉSNEK A MEGBÍZÁSA | |||||||||||||||
label / ga | label / ga | ||||||||||||||
EAGRÚ AN CHOISTE FAIREACHÁIN AGUS AN RÉAMHCHRUINNIÚ TEICNIÚIL A CHUR AR IONTAOIBH | |||||||||||||||
label / sv | label / sv | ||||||||||||||
TILLDELNING AV ÖVERVAKNINGSKOMMITTÉNS ORGANISATION OCH DET PRELIMINÄRA TEKNISKA MÖTET | |||||||||||||||
label / et | label / et | ||||||||||||||
JÄRELEVALVEKOMITEE TÖÖ KORRALDAMINE JA ESIALGNE TEHNILINE KOOSOLEK | |||||||||||||||
description / bg | description / bg | ||||||||||||||
Проект Q4183547 в Италия | |||||||||||||||
description / hr | description / hr | ||||||||||||||
Projekt Q4183547 u Italiji | |||||||||||||||
description / hu | description / hu | ||||||||||||||
Projekt Q4183547 Olaszországban | |||||||||||||||
description / cs | description / cs | ||||||||||||||
Projekt Q4183547 v Itálii | |||||||||||||||
description / da | description / da | ||||||||||||||
Projekt Q4183547 i Italien | |||||||||||||||
description / nl | description / nl | ||||||||||||||
Project Q4183547 in Italië | |||||||||||||||
description / et | description / et | ||||||||||||||
Projekt Q4183547 Itaalias | |||||||||||||||
description / fi | description / fi | ||||||||||||||
Projekti Q4183547 Italiassa | |||||||||||||||
description / fr | description / fr | ||||||||||||||
Projet Q4183547 en Italie | |||||||||||||||
description / de | description / de | ||||||||||||||
Projekt Q4183547 in Italien | |||||||||||||||
description / el | description / el | ||||||||||||||
Έργο Q4183547 στην Ιταλία | |||||||||||||||
description / ga | description / ga | ||||||||||||||
Tionscadal Q4183547 san Iodáil | |||||||||||||||
description / it | description / it | ||||||||||||||
Progetto Q4183547 in Italia | |||||||||||||||
description / lv | description / lv | ||||||||||||||
Projekts Q4183547 Itālijā | |||||||||||||||
description / lt | description / lt | ||||||||||||||
Projektas Q4183547 Italijoje | |||||||||||||||
description / mt | description / mt | ||||||||||||||
Proġett Q4183547 fl-Italja | |||||||||||||||
description / pl | description / pl | ||||||||||||||
Projekt Q4183547 we Włoszech | |||||||||||||||
description / pt | description / pt | ||||||||||||||
Projeto Q4183547 na Itália | |||||||||||||||
description / ro | description / ro | ||||||||||||||
Proiectul Q4183547 în Italia | |||||||||||||||
description / sk | description / sk | ||||||||||||||
Projekt Q4183547 v Taliansku | |||||||||||||||
description / sl | description / sl | ||||||||||||||
Projekt Q4183547 v Italiji | |||||||||||||||
description / es | description / es | ||||||||||||||
Proyecto Q4183547 en Italia | |||||||||||||||
description / sv | description / sv | ||||||||||||||
Projekt Q4183547 i Italien | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 5,827.3 Euro / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 3,040.85 Euro / rank | |||||||||||||||
Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 52.18 percent / rank | |||||||||||||||
Property / contained in Local Administrative Unit | |||||||||||||||
Property / contained in Local Administrative Unit: Abriola / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary | |||||||||||||||
PO FSE BASILICATA 2014-2020 — ENCOMIENDA LA ORGANIZACIÓN DEL COMITÉ DE SEGUIMIENTO Y DE LA REUNIÓN TÉCNICA PRELIMINAR QUE SE CELEBRARÁ EN EL PODER LOS DÍAS 13.06.2019 Y 12.06.2019 — COMPROMISO DE GASTOS (Spanish) | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014-2020 — ENCOMIENDA LA ORGANIZACIÓN DEL COMITÉ DE SEGUIMIENTO Y DE LA REUNIÓN TÉCNICA PRELIMINAR QUE SE CELEBRARÁ EN EL PODER LOS DÍAS 13.06.2019 Y 12.06.2019 — COMPROMISO DE GASTOS (Spanish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014-2020 — ENCOMIENDA LA ORGANIZACIÓN DEL COMITÉ DE SEGUIMIENTO Y DE LA REUNIÓN TÉCNICA PRELIMINAR QUE SE CELEBRARÁ EN EL PODER LOS DÍAS 13.06.2019 Y 12.06.2019 — COMPROMISO DE GASTOS (Spanish) / qualifier | |||||||||||||||
point in time: 31 January 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PO FSE BASILICATA 2014-2020 — ENTRUSTMENT OF THE ORGANISATION OF THE MONITORING COMMITTEE AND OF THE PRELIMINARY TECHNICAL MEETING TO BE HELD IN POWER ON 13.06.2019 AND 12.06.2019 — COMMITMENT OF EXPENDITURE (English) | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014-2020 — ENTRUSTMENT OF THE ORGANISATION OF THE MONITORING COMMITTEE AND OF THE PRELIMINARY TECHNICAL MEETING TO BE HELD IN POWER ON 13.06.2019 AND 12.06.2019 — COMMITMENT OF EXPENDITURE (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014-2020 — ENTRUSTMENT OF THE ORGANISATION OF THE MONITORING COMMITTEE AND OF THE PRELIMINARY TECHNICAL MEETING TO BE HELD IN POWER ON 13.06.2019 AND 12.06.2019 — COMMITMENT OF EXPENDITURE (English) / qualifier | |||||||||||||||
point in time: 31 January 2022
| |||||||||||||||
Property / summary: PO FSE BASILICATA 2014-2020 — ENTRUSTMENT OF THE ORGANISATION OF THE MONITORING COMMITTEE AND OF THE PRELIMINARY TECHNICAL MEETING TO BE HELD IN POWER ON 13.06.2019 AND 12.06.2019 — COMMITMENT OF EXPENDITURE (English) / qualifier | |||||||||||||||
readability score: 0.0007763351714108
| |||||||||||||||
Property / summary | |||||||||||||||
PO FSE BASILICATA 2014-2020 — MANDAT DE L’ORGANISATION DU COMITÉ DE SUIVI ET DE LA RÉUNION TECHNIQUE PRÉLIMINAIRE QUI SE TIENDRA AU POUVOIR LE 13.06.2019 ET 12.06.2019 — ENGAGEMENT DES DÉPENSES (French) | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014-2020 — MANDAT DE L’ORGANISATION DU COMITÉ DE SUIVI ET DE LA RÉUNION TECHNIQUE PRÉLIMINAIRE QUI SE TIENDRA AU POUVOIR LE 13.06.2019 ET 12.06.2019 — ENGAGEMENT DES DÉPENSES (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014-2020 — MANDAT DE L’ORGANISATION DU COMITÉ DE SUIVI ET DE LA RÉUNION TECHNIQUE PRÉLIMINAIRE QUI SE TIENDRA AU POUVOIR LE 13.06.2019 ET 12.06.2019 — ENGAGEMENT DES DÉPENSES (French) / qualifier | |||||||||||||||
point in time: 2 February 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PO FSE BASILICATA 2014-2020 – BETRAUUNG DER ORGANISATION DES BEGLEITAUSSCHUSSES UND DER AM 13.6.2019 UND AM 12.06.2019 DURCHZUFÜHRENDEN VORLÄUFIGEN TECHNISCHEN SITZUNG – MITTELBINDUNG (German) | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014-2020 – BETRAUUNG DER ORGANISATION DES BEGLEITAUSSCHUSSES UND DER AM 13.6.2019 UND AM 12.06.2019 DURCHZUFÜHRENDEN VORLÄUFIGEN TECHNISCHEN SITZUNG – MITTELBINDUNG (German) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014-2020 – BETRAUUNG DER ORGANISATION DES BEGLEITAUSSCHUSSES UND DER AM 13.6.2019 UND AM 12.06.2019 DURCHZUFÜHRENDEN VORLÄUFIGEN TECHNISCHEN SITZUNG – MITTELBINDUNG (German) / qualifier | |||||||||||||||
point in time: 3 February 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PO FSE BASILICATA 2014-2020 — TOEWIJZING VAN DE ORGANISATIE VAN HET TOEZICHTCOMITÉ EN VAN DE VOORBEREIDENDE TECHNISCHE VERGADERING DIE OP 13.6.2019 EN 12.6.2019 ZAL WORDEN GEHOUDEN — VASTLEGGING VAN UITGAVEN (Dutch) | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014-2020 — TOEWIJZING VAN DE ORGANISATIE VAN HET TOEZICHTCOMITÉ EN VAN DE VOORBEREIDENDE TECHNISCHE VERGADERING DIE OP 13.6.2019 EN 12.6.2019 ZAL WORDEN GEHOUDEN — VASTLEGGING VAN UITGAVEN (Dutch) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014-2020 — TOEWIJZING VAN DE ORGANISATIE VAN HET TOEZICHTCOMITÉ EN VAN DE VOORBEREIDENDE TECHNISCHE VERGADERING DIE OP 13.6.2019 EN 12.6.2019 ZAL WORDEN GEHOUDEN — VASTLEGGING VAN UITGAVEN (Dutch) / qualifier | |||||||||||||||
point in time: 4 February 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PO FSE BASILICATA 2014-2020 — OVERDRAGELSE AF TILRETTELÆGGELSEN AF OVERVÅGNINGSUDVALGET OG DET FORELØBIGE TEKNISKE MØDE, DER SKAL AFHOLDES DEN 13.6.2019 OG 12.6.2019 — UDGIFTSFORPLIGTELSER (Danish) | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014-2020 — OVERDRAGELSE AF TILRETTELÆGGELSEN AF OVERVÅGNINGSUDVALGET OG DET FORELØBIGE TEKNISKE MØDE, DER SKAL AFHOLDES DEN 13.6.2019 OG 12.6.2019 — UDGIFTSFORPLIGTELSER (Danish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014-2020 — OVERDRAGELSE AF TILRETTELÆGGELSEN AF OVERVÅGNINGSUDVALGET OG DET FORELØBIGE TEKNISKE MØDE, DER SKAL AFHOLDES DEN 13.6.2019 OG 12.6.2019 — UDGIFTSFORPLIGTELSER (Danish) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PO FSE BASILICATA 2014-2020 — ΑΝΆΘΕΣΗ ΤΗΣ ΟΡΓΆΝΩΣΗΣ ΤΗΣ ΕΠΙΤΡΟΠΉΣ ΠΑΡΑΚΟΛΟΎΘΗΣΗΣ ΚΑΙ ΤΗΣ ΠΡΟΚΑΤΑΡΚΤΙΚΉΣ ΤΕΧΝΙΚΉΣ ΣΥΝΕΔΡΊΑΣΗΣ ΠΟΥ ΘΑ ΠΡΑΓΜΑΤΟΠΟΙΗΘΕΊ ΣΤΙΣ 13.06.2019 ΚΑΙ 12.06.2019 — ΑΝΆΛΗΨΗ ΔΑΠΑΝΏΝ (Greek) | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014-2020 — ΑΝΆΘΕΣΗ ΤΗΣ ΟΡΓΆΝΩΣΗΣ ΤΗΣ ΕΠΙΤΡΟΠΉΣ ΠΑΡΑΚΟΛΟΎΘΗΣΗΣ ΚΑΙ ΤΗΣ ΠΡΟΚΑΤΑΡΚΤΙΚΉΣ ΤΕΧΝΙΚΉΣ ΣΥΝΕΔΡΊΑΣΗΣ ΠΟΥ ΘΑ ΠΡΑΓΜΑΤΟΠΟΙΗΘΕΊ ΣΤΙΣ 13.06.2019 ΚΑΙ 12.06.2019 — ΑΝΆΛΗΨΗ ΔΑΠΑΝΏΝ (Greek) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014-2020 — ΑΝΆΘΕΣΗ ΤΗΣ ΟΡΓΆΝΩΣΗΣ ΤΗΣ ΕΠΙΤΡΟΠΉΣ ΠΑΡΑΚΟΛΟΎΘΗΣΗΣ ΚΑΙ ΤΗΣ ΠΡΟΚΑΤΑΡΚΤΙΚΉΣ ΤΕΧΝΙΚΉΣ ΣΥΝΕΔΡΊΑΣΗΣ ΠΟΥ ΘΑ ΠΡΑΓΜΑΤΟΠΟΙΗΘΕΊ ΣΤΙΣ 13.06.2019 ΚΑΙ 12.06.2019 — ΑΝΆΛΗΨΗ ΔΑΠΑΝΏΝ (Greek) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PO FSE BASILICATA 2014 – 2020 – POVJERAVANJE ORGANIZACIJE ODBORA ZA PRAĆENJE I PRELIMINARNOG TEHNIČKOG SASTANKA KOJI ĆE BITI NA SNAZI 13.06.2019. I 12.06.2019. – PREUZIMANJE OBVEZA ZA RASHODE (Croatian) | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014 – 2020 – POVJERAVANJE ORGANIZACIJE ODBORA ZA PRAĆENJE I PRELIMINARNOG TEHNIČKOG SASTANKA KOJI ĆE BITI NA SNAZI 13.06.2019. I 12.06.2019. – PREUZIMANJE OBVEZA ZA RASHODE (Croatian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014 – 2020 – POVJERAVANJE ORGANIZACIJE ODBORA ZA PRAĆENJE I PRELIMINARNOG TEHNIČKOG SASTANKA KOJI ĆE BITI NA SNAZI 13.06.2019. I 12.06.2019. – PREUZIMANJE OBVEZA ZA RASHODE (Croatian) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PO FSE BASILICATA 2014-2020 – ÎNCREDINȚAREA ORGANIZĂRII COMITETULUI DE MONITORIZARE ȘI A REUNIUNII TEHNICE PRELIMINARE CARE VA AVEA LOC LA PUTERE LA 13.6.2019 ȘI 12.6.2019 – ANGAJAREA CHELTUIELILOR (Romanian) | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014-2020 – ÎNCREDINȚAREA ORGANIZĂRII COMITETULUI DE MONITORIZARE ȘI A REUNIUNII TEHNICE PRELIMINARE CARE VA AVEA LOC LA PUTERE LA 13.6.2019 ȘI 12.6.2019 – ANGAJAREA CHELTUIELILOR (Romanian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014-2020 – ÎNCREDINȚAREA ORGANIZĂRII COMITETULUI DE MONITORIZARE ȘI A REUNIUNII TEHNICE PRELIMINARE CARE VA AVEA LOC LA PUTERE LA 13.6.2019 ȘI 12.6.2019 – ANGAJAREA CHELTUIELILOR (Romanian) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PO FSE BASILICATA 2014 – 2020 – POVERENIE ORGANIZÁCIOU MONITOROVACIEHO VÝBORU A PREDBEŽNÝM TECHNICKÝM ZASADNUTÍM, KTORÉ SA USKUTOČNÍ 13. JÚNA 2019 A 12. 6. 2019 – VIAZANIE VÝDAVKOV (Slovak) | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014 – 2020 – POVERENIE ORGANIZÁCIOU MONITOROVACIEHO VÝBORU A PREDBEŽNÝM TECHNICKÝM ZASADNUTÍM, KTORÉ SA USKUTOČNÍ 13. JÚNA 2019 A 12. 6. 2019 – VIAZANIE VÝDAVKOV (Slovak) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014 – 2020 – POVERENIE ORGANIZÁCIOU MONITOROVACIEHO VÝBORU A PREDBEŽNÝM TECHNICKÝM ZASADNUTÍM, KTORÉ SA USKUTOČNÍ 13. JÚNA 2019 A 12. 6. 2019 – VIAZANIE VÝDAVKOV (Slovak) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PO FSE BASILICATA 2014–2020 — INKARIGU TAL-ORGANIZZAZZJONI TAL-KUMITAT TA’ MONITORAĠĠ U TAL-LAQGĦA TEKNIKA PRELIMINARI LI GĦANDHA SSIR FIS-SETGĦA FIT-13.06.2019 U FIT-12.06.2019 — IMPENN TA’ NFIQ (Maltese) | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014–2020 — INKARIGU TAL-ORGANIZZAZZJONI TAL-KUMITAT TA’ MONITORAĠĠ U TAL-LAQGĦA TEKNIKA PRELIMINARI LI GĦANDHA SSIR FIS-SETGĦA FIT-13.06.2019 U FIT-12.06.2019 — IMPENN TA’ NFIQ (Maltese) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014–2020 — INKARIGU TAL-ORGANIZZAZZJONI TAL-KUMITAT TA’ MONITORAĠĠ U TAL-LAQGĦA TEKNIKA PRELIMINARI LI GĦANDHA SSIR FIS-SETGĦA FIT-13.06.2019 U FIT-12.06.2019 — IMPENN TA’ NFIQ (Maltese) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PO FSE BASILICATA 2014-2020 — ATRIBUIÇÃO DA ORGANIZAÇÃO DO COMITÉ DE ACOMPANHAMENTO E DA REUNIÃO TÉCNICA PRELIMINAR A REALIZAR EM 13.6.2019 E 12.06.2019 — AUTORIZAÇÃO DE DESPESAS (Portuguese) | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014-2020 — ATRIBUIÇÃO DA ORGANIZAÇÃO DO COMITÉ DE ACOMPANHAMENTO E DA REUNIÃO TÉCNICA PRELIMINAR A REALIZAR EM 13.6.2019 E 12.06.2019 — AUTORIZAÇÃO DE DESPESAS (Portuguese) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014-2020 — ATRIBUIÇÃO DA ORGANIZAÇÃO DO COMITÉ DE ACOMPANHAMENTO E DA REUNIÃO TÉCNICA PRELIMINAR A REALIZAR EM 13.6.2019 E 12.06.2019 — AUTORIZAÇÃO DE DESPESAS (Portuguese) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PO FSE BASILICATA 2014–2020 – SEURANTAKOMITEAN JA 13.6.2019 JA 12.6.2019 PIDETTÄVÄN ALUSTAVAN TEKNISEN KOKOUKSEN JÄRJESTÄMINEN – MENOSITOUMUS (Finnish) | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014–2020 – SEURANTAKOMITEAN JA 13.6.2019 JA 12.6.2019 PIDETTÄVÄN ALUSTAVAN TEKNISEN KOKOUKSEN JÄRJESTÄMINEN – MENOSITOUMUS (Finnish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014–2020 – SEURANTAKOMITEAN JA 13.6.2019 JA 12.6.2019 PIDETTÄVÄN ALUSTAVAN TEKNISEN KOKOUKSEN JÄRJESTÄMINEN – MENOSITOUMUS (Finnish) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PO FSE BASILICATA 2014-2020 – POWIERZENIE ORGANIZACJI KOMITETU MONITORUJĄCEGO ORAZ WSTĘPNEGO POSIEDZENIA TECHNICZNEGO, KTÓRE ODBĘDZIE SIĘ W DNIU 13.06.2019 R. I 12.06.2019 R. – ZOBOWIĄZANIE WYDATKÓW (Polish) | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014-2020 – POWIERZENIE ORGANIZACJI KOMITETU MONITORUJĄCEGO ORAZ WSTĘPNEGO POSIEDZENIA TECHNICZNEGO, KTÓRE ODBĘDZIE SIĘ W DNIU 13.06.2019 R. I 12.06.2019 R. – ZOBOWIĄZANIE WYDATKÓW (Polish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014-2020 – POWIERZENIE ORGANIZACJI KOMITETU MONITORUJĄCEGO ORAZ WSTĘPNEGO POSIEDZENIA TECHNICZNEGO, KTÓRE ODBĘDZIE SIĘ W DNIU 13.06.2019 R. I 12.06.2019 R. – ZOBOWIĄZANIE WYDATKÓW (Polish) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PO FSE BASILICATA 2014–2020 – POOBLASTITEV ZA ORGANIZACIJO ODBORA ZA SPREMLJANJE IN PREDHODNI TEHNIČNI SESTANEK, KI BO NA OBLASTI 13. JUNIJA 2019 IN 12. JUNIJA 2019 – PREVZEM OBVEZNOSTI ZA ODHODKE (Slovenian) | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014–2020 – POOBLASTITEV ZA ORGANIZACIJO ODBORA ZA SPREMLJANJE IN PREDHODNI TEHNIČNI SESTANEK, KI BO NA OBLASTI 13. JUNIJA 2019 IN 12. JUNIJA 2019 – PREVZEM OBVEZNOSTI ZA ODHODKE (Slovenian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014–2020 – POOBLASTITEV ZA ORGANIZACIJO ODBORA ZA SPREMLJANJE IN PREDHODNI TEHNIČNI SESTANEK, KI BO NA OBLASTI 13. JUNIJA 2019 IN 12. JUNIJA 2019 – PREVZEM OBVEZNOSTI ZA ODHODKE (Slovenian) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PO FSE BASILICATA 2014–2020 – POVĚŘENÍ ORGANIZACÍ MONITOROVACÍHO VÝBORU A PŘEDBĚŽNÉHO TECHNICKÉHO ZASEDÁNÍ, KTERÉ SE BUDE KONAT VE DNECH 13. ČERVNA 2019 A 12. ČERVNA 2019 – ZÁVAZEK VÝDAJŮ (Czech) | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014–2020 – POVĚŘENÍ ORGANIZACÍ MONITOROVACÍHO VÝBORU A PŘEDBĚŽNÉHO TECHNICKÉHO ZASEDÁNÍ, KTERÉ SE BUDE KONAT VE DNECH 13. ČERVNA 2019 A 12. ČERVNA 2019 – ZÁVAZEK VÝDAJŮ (Czech) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014–2020 – POVĚŘENÍ ORGANIZACÍ MONITOROVACÍHO VÝBORU A PŘEDBĚŽNÉHO TECHNICKÉHO ZASEDÁNÍ, KTERÉ SE BUDE KONAT VE DNECH 13. ČERVNA 2019 A 12. ČERVNA 2019 – ZÁVAZEK VÝDAJŮ (Czech) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
2014–2020 M. PO FSE BASILICATA – PRIEŽIŪROS KOMITETO ORGANIZAVIMO IR PARENGIAMOJO TECHNINIO POSĖDŽIO, KURIS VYKS 2019 M. BIRŽELIO 13 D. IR 2019 M. BIRŽELIO 12 D., PAVEDIMAS. ĮSIPAREIGOJIMAI DĖL IŠLAIDŲ (Lithuanian) | |||||||||||||||
Property / summary: 2014–2020 M. PO FSE BASILICATA – PRIEŽIŪROS KOMITETO ORGANIZAVIMO IR PARENGIAMOJO TECHNINIO POSĖDŽIO, KURIS VYKS 2019 M. BIRŽELIO 13 D. IR 2019 M. BIRŽELIO 12 D., PAVEDIMAS. ĮSIPAREIGOJIMAI DĖL IŠLAIDŲ (Lithuanian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: 2014–2020 M. PO FSE BASILICATA – PRIEŽIŪROS KOMITETO ORGANIZAVIMO IR PARENGIAMOJO TECHNINIO POSĖDŽIO, KURIS VYKS 2019 M. BIRŽELIO 13 D. IR 2019 M. BIRŽELIO 12 D., PAVEDIMAS. ĮSIPAREIGOJIMAI DĖL IŠLAIDŲ (Lithuanian) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PO FSE BASILICATA 2014–2020 — PILNVAROJUMS ORGANIZĒT UZRAUDZĪBAS KOMITEJU UN PROVIZORISKO TEHNISKO SANĀKSMI, KAS NOTIKS 2019. GADA 13. JŪNIJĀ UN 2019. GADA 12. JŪNIJĀ — IZDEVUMU SAISTĪBAS (Latvian) | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014–2020 — PILNVAROJUMS ORGANIZĒT UZRAUDZĪBAS KOMITEJU UN PROVIZORISKO TEHNISKO SANĀKSMI, KAS NOTIKS 2019. GADA 13. JŪNIJĀ UN 2019. GADA 12. JŪNIJĀ — IZDEVUMU SAISTĪBAS (Latvian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014–2020 — PILNVAROJUMS ORGANIZĒT UZRAUDZĪBAS KOMITEJU UN PROVIZORISKO TEHNISKO SANĀKSMI, KAS NOTIKS 2019. GADA 13. JŪNIJĀ UN 2019. GADA 12. JŪNIJĀ — IZDEVUMU SAISTĪBAS (Latvian) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PO FSE BASILICATA 2014—2020 — ВЪЗЛАГАНЕ НА ОРГАНИЗАЦИЯТА НА МОНИТОРИНГОВИЯ КОМИТЕТ И НА ПРЕДВАРИТЕЛНАТА ТЕХНИЧЕСКА СРЕЩА, КОЯТО ЩЕ СЕ ПРОВЕДЕ НА 13.6.2019 Г. И 12.06.2019 Г. — ПОЕМАНЕ НА ЗАДЪЛЖЕНИЕ ЗА РАЗХОДИ (Bulgarian) | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014—2020 — ВЪЗЛАГАНЕ НА ОРГАНИЗАЦИЯТА НА МОНИТОРИНГОВИЯ КОМИТЕТ И НА ПРЕДВАРИТЕЛНАТА ТЕХНИЧЕСКА СРЕЩА, КОЯТО ЩЕ СЕ ПРОВЕДЕ НА 13.6.2019 Г. И 12.06.2019 Г. — ПОЕМАНЕ НА ЗАДЪЛЖЕНИЕ ЗА РАЗХОДИ (Bulgarian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014—2020 — ВЪЗЛАГАНЕ НА ОРГАНИЗАЦИЯТА НА МОНИТОРИНГОВИЯ КОМИТЕТ И НА ПРЕДВАРИТЕЛНАТА ТЕХНИЧЕСКА СРЕЩА, КОЯТО ЩЕ СЕ ПРОВЕДЕ НА 13.6.2019 Г. И 12.06.2019 Г. — ПОЕМАНЕ НА ЗАДЪЛЖЕНИЕ ЗА РАЗХОДИ (Bulgarian) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PO FSE BASILICATA 2014–2020 – A MONITORINGBIZOTTSÁG SZERVEZÉSÉNEK ÉS A 2019. JÚNIUS 13-ÁN ÉS 2019. JÚNIUS 12-ÉN HATALOMRA KERÜLŐ ELŐZETES TECHNIKAI ÜLÉSNEK A MEGBÍZÁSA – KIADÁSI KÖTELEZETTSÉGVÁLLALÁS (Hungarian) | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014–2020 – A MONITORINGBIZOTTSÁG SZERVEZÉSÉNEK ÉS A 2019. JÚNIUS 13-ÁN ÉS 2019. JÚNIUS 12-ÉN HATALOMRA KERÜLŐ ELŐZETES TECHNIKAI ÜLÉSNEK A MEGBÍZÁSA – KIADÁSI KÖTELEZETTSÉGVÁLLALÁS (Hungarian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014–2020 – A MONITORINGBIZOTTSÁG SZERVEZÉSÉNEK ÉS A 2019. JÚNIUS 13-ÁN ÉS 2019. JÚNIUS 12-ÉN HATALOMRA KERÜLŐ ELŐZETES TECHNIKAI ÜLÉSNEK A MEGBÍZÁSA – KIADÁSI KÖTELEZETTSÉGVÁLLALÁS (Hungarian) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PO FSE BASILICATA 2014-2020 — EAGRÚCHÁN AN CHOISTE FAIREACHÁIN AGUS AN RÉAMHCHRUINNIÚ TEICNIÚIL A THIONÓLFAR I GCUMHACHT AN 13.06.2019 AGUS 12.06.2019 — GEALLTANAS CAITEACHAIS A CHUR DE CHÚRAM (Irish) | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014-2020 — EAGRÚCHÁN AN CHOISTE FAIREACHÁIN AGUS AN RÉAMHCHRUINNIÚ TEICNIÚIL A THIONÓLFAR I GCUMHACHT AN 13.06.2019 AGUS 12.06.2019 — GEALLTANAS CAITEACHAIS A CHUR DE CHÚRAM (Irish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014-2020 — EAGRÚCHÁN AN CHOISTE FAIREACHÁIN AGUS AN RÉAMHCHRUINNIÚ TEICNIÚIL A THIONÓLFAR I GCUMHACHT AN 13.06.2019 AGUS 12.06.2019 — GEALLTANAS CAITEACHAIS A CHUR DE CHÚRAM (Irish) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PO FSE BASILICATA 2014–2020 – ANFÖRTROENDE AV ÖVERVAKNINGSKOMMITTÉNS ORGANISATION OCH DET PRELIMINÄRA TEKNISKA MÖTE SOM SKA ÄGA RUM DEN 13 JUNI 2019 OCH DEN 12 JUNI 2019 – UTGIFTSÅTAGANDEN (Swedish) | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014–2020 – ANFÖRTROENDE AV ÖVERVAKNINGSKOMMITTÉNS ORGANISATION OCH DET PRELIMINÄRA TEKNISKA MÖTE SOM SKA ÄGA RUM DEN 13 JUNI 2019 OCH DEN 12 JUNI 2019 – UTGIFTSÅTAGANDEN (Swedish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014–2020 – ANFÖRTROENDE AV ÖVERVAKNINGSKOMMITTÉNS ORGANISATION OCH DET PRELIMINÄRA TEKNISKA MÖTE SOM SKA ÄGA RUM DEN 13 JUNI 2019 OCH DEN 12 JUNI 2019 – UTGIFTSÅTAGANDEN (Swedish) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PO FSE BASILICATA 2014–2020 – JÄRELEVALVEKOMITEE TÖÖ KORRALDAMINE JA ESIALGNE TEHNILINE KOOSOLEK, MIS TOIMUB 13.06.2019 JA 12.06.2019 – KULUKOHUSTUSTE VÕTMINE (Estonian) | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014–2020 – JÄRELEVALVEKOMITEE TÖÖ KORRALDAMINE JA ESIALGNE TEHNILINE KOOSOLEK, MIS TOIMUB 13.06.2019 JA 12.06.2019 – KULUKOHUSTUSTE VÕTMINE (Estonian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PO FSE BASILICATA 2014–2020 – JÄRELEVALVEKOMITEE TÖÖ KORRALDAMINE JA ESIALGNE TEHNILINE KOOSOLEK, MIS TOIMUB 13.06.2019 JA 12.06.2019 – KULUKOHUSTUSTE VÕTMINE (Estonian) / qualifier | |||||||||||||||
point in time: 21 July 2022
| |||||||||||||||
Property / coordinate location | |||||||||||||||
40°31'5.95"N, 15°49'15.46"E
| |||||||||||||||
Property / coordinate location: 40°31'5.95"N, 15°49'15.46"E / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
5,916.34 Euro
| |||||||||||||||
Property / budget: 5,916.34 Euro / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
2,913.65 Euro
| |||||||||||||||
Property / EU contribution: 2,913.65 Euro / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / co-financing rate | |||||||||||||||
49.25 percent
| |||||||||||||||
Property / co-financing rate: 49.25 percent / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / contained in NUTS | |||||||||||||||
Property / contained in NUTS: Province of Potenza / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / priority axis | |||||||||||||||
Property / priority axis: Technical assistance / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / thematic objective | |||||||||||||||
Property / thematic objective: Technical assistance / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / start time | |||||||||||||||
4 June 2019
| |||||||||||||||
Property / start time: 4 June 2019 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / end time | |||||||||||||||
16 July 2019
| |||||||||||||||
Property / end time: 16 July 2019 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / date of last update | |||||||||||||||
8 April 2023
| |||||||||||||||
Property / date of last update: 8 April 2023 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / Call for proposal | |||||||||||||||
Property / Call for proposal: Condivisione e approvazione della Strategia di Comunicazione del Programma Operativo F.S.E. Basilicata 2014/2020. / rank | |||||||||||||||
Normal rank |
Latest revision as of 16:24, 7 March 2024
Project Q4183547 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | ENTRUSTMENT OF THE ORGANISATION OF THE MONITORING COMMITTEE AND OF THE PRELIMINARY TECHNICAL MEETING |
Project Q4183547 in Italy |
Statements
2,913.65 Euro
0 references
5,916.34 Euro
0 references
49.25 percent
0 references
4 June 2019
0 references
16 July 2019
0 references
REGIONE BASILICATA
0 references
PO FSE BASILICATA 2014-2020 - AFFIDAMENTO SERVIZIO DI ORGANIZZAZIONE DEL COMITATO DI SORVEGLIANZA E DELLA RIUNIONE TECNICA PRELIMINARE CHE SI TERRANNO A POTENZA RISPETIVAMENTE IL 13.06.2019 ED IL 12.06.2019 - IMPEGNO DI SPESA (Italian)
0 references
PO FSE BASILICATA 2014-2020 — ENCOMIENDA LA ORGANIZACIÓN DEL COMITÉ DE SEGUIMIENTO Y DE LA REUNIÓN TÉCNICA PRELIMINAR QUE SE CELEBRARÁ EN EL PODER LOS DÍAS 13.06.2019 Y 12.06.2019 — COMPROMISO DE GASTOS (Spanish)
31 January 2022
0 references
PO FSE BASILICATA 2014-2020 — ENTRUSTMENT OF THE ORGANISATION OF THE MONITORING COMMITTEE AND OF THE PRELIMINARY TECHNICAL MEETING TO BE HELD IN POWER ON 13.06.2019 AND 12.06.2019 — COMMITMENT OF EXPENDITURE (English)
31 January 2022
0.0007763351714108
0 references
PO FSE BASILICATA 2014-2020 — MANDAT DE L’ORGANISATION DU COMITÉ DE SUIVI ET DE LA RÉUNION TECHNIQUE PRÉLIMINAIRE QUI SE TIENDRA AU POUVOIR LE 13.06.2019 ET 12.06.2019 — ENGAGEMENT DES DÉPENSES (French)
2 February 2022
0 references
PO FSE BASILICATA 2014-2020 – BETRAUUNG DER ORGANISATION DES BEGLEITAUSSCHUSSES UND DER AM 13.6.2019 UND AM 12.06.2019 DURCHZUFÜHRENDEN VORLÄUFIGEN TECHNISCHEN SITZUNG – MITTELBINDUNG (German)
3 February 2022
0 references
PO FSE BASILICATA 2014-2020 — TOEWIJZING VAN DE ORGANISATIE VAN HET TOEZICHTCOMITÉ EN VAN DE VOORBEREIDENDE TECHNISCHE VERGADERING DIE OP 13.6.2019 EN 12.6.2019 ZAL WORDEN GEHOUDEN — VASTLEGGING VAN UITGAVEN (Dutch)
4 February 2022
0 references
PO FSE BASILICATA 2014-2020 — OVERDRAGELSE AF TILRETTELÆGGELSEN AF OVERVÅGNINGSUDVALGET OG DET FORELØBIGE TEKNISKE MØDE, DER SKAL AFHOLDES DEN 13.6.2019 OG 12.6.2019 — UDGIFTSFORPLIGTELSER (Danish)
21 July 2022
0 references
PO FSE BASILICATA 2014-2020 — ΑΝΆΘΕΣΗ ΤΗΣ ΟΡΓΆΝΩΣΗΣ ΤΗΣ ΕΠΙΤΡΟΠΉΣ ΠΑΡΑΚΟΛΟΎΘΗΣΗΣ ΚΑΙ ΤΗΣ ΠΡΟΚΑΤΑΡΚΤΙΚΉΣ ΤΕΧΝΙΚΉΣ ΣΥΝΕΔΡΊΑΣΗΣ ΠΟΥ ΘΑ ΠΡΑΓΜΑΤΟΠΟΙΗΘΕΊ ΣΤΙΣ 13.06.2019 ΚΑΙ 12.06.2019 — ΑΝΆΛΗΨΗ ΔΑΠΑΝΏΝ (Greek)
21 July 2022
0 references
PO FSE BASILICATA 2014 – 2020 – POVJERAVANJE ORGANIZACIJE ODBORA ZA PRAĆENJE I PRELIMINARNOG TEHNIČKOG SASTANKA KOJI ĆE BITI NA SNAZI 13.06.2019. I 12.06.2019. – PREUZIMANJE OBVEZA ZA RASHODE (Croatian)
21 July 2022
0 references
PO FSE BASILICATA 2014-2020 – ÎNCREDINȚAREA ORGANIZĂRII COMITETULUI DE MONITORIZARE ȘI A REUNIUNII TEHNICE PRELIMINARE CARE VA AVEA LOC LA PUTERE LA 13.6.2019 ȘI 12.6.2019 – ANGAJAREA CHELTUIELILOR (Romanian)
21 July 2022
0 references
PO FSE BASILICATA 2014 – 2020 – POVERENIE ORGANIZÁCIOU MONITOROVACIEHO VÝBORU A PREDBEŽNÝM TECHNICKÝM ZASADNUTÍM, KTORÉ SA USKUTOČNÍ 13. JÚNA 2019 A 12. 6. 2019 – VIAZANIE VÝDAVKOV (Slovak)
21 July 2022
0 references
PO FSE BASILICATA 2014–2020 — INKARIGU TAL-ORGANIZZAZZJONI TAL-KUMITAT TA’ MONITORAĠĠ U TAL-LAQGĦA TEKNIKA PRELIMINARI LI GĦANDHA SSIR FIS-SETGĦA FIT-13.06.2019 U FIT-12.06.2019 — IMPENN TA’ NFIQ (Maltese)
21 July 2022
0 references
PO FSE BASILICATA 2014-2020 — ATRIBUIÇÃO DA ORGANIZAÇÃO DO COMITÉ DE ACOMPANHAMENTO E DA REUNIÃO TÉCNICA PRELIMINAR A REALIZAR EM 13.6.2019 E 12.06.2019 — AUTORIZAÇÃO DE DESPESAS (Portuguese)
21 July 2022
0 references
PO FSE BASILICATA 2014–2020 – SEURANTAKOMITEAN JA 13.6.2019 JA 12.6.2019 PIDETTÄVÄN ALUSTAVAN TEKNISEN KOKOUKSEN JÄRJESTÄMINEN – MENOSITOUMUS (Finnish)
21 July 2022
0 references
PO FSE BASILICATA 2014-2020 – POWIERZENIE ORGANIZACJI KOMITETU MONITORUJĄCEGO ORAZ WSTĘPNEGO POSIEDZENIA TECHNICZNEGO, KTÓRE ODBĘDZIE SIĘ W DNIU 13.06.2019 R. I 12.06.2019 R. – ZOBOWIĄZANIE WYDATKÓW (Polish)
21 July 2022
0 references
PO FSE BASILICATA 2014–2020 – POOBLASTITEV ZA ORGANIZACIJO ODBORA ZA SPREMLJANJE IN PREDHODNI TEHNIČNI SESTANEK, KI BO NA OBLASTI 13. JUNIJA 2019 IN 12. JUNIJA 2019 – PREVZEM OBVEZNOSTI ZA ODHODKE (Slovenian)
21 July 2022
0 references
PO FSE BASILICATA 2014–2020 – POVĚŘENÍ ORGANIZACÍ MONITOROVACÍHO VÝBORU A PŘEDBĚŽNÉHO TECHNICKÉHO ZASEDÁNÍ, KTERÉ SE BUDE KONAT VE DNECH 13. ČERVNA 2019 A 12. ČERVNA 2019 – ZÁVAZEK VÝDAJŮ (Czech)
21 July 2022
0 references
2014–2020 M. PO FSE BASILICATA – PRIEŽIŪROS KOMITETO ORGANIZAVIMO IR PARENGIAMOJO TECHNINIO POSĖDŽIO, KURIS VYKS 2019 M. BIRŽELIO 13 D. IR 2019 M. BIRŽELIO 12 D., PAVEDIMAS. ĮSIPAREIGOJIMAI DĖL IŠLAIDŲ (Lithuanian)
21 July 2022
0 references
PO FSE BASILICATA 2014–2020 — PILNVAROJUMS ORGANIZĒT UZRAUDZĪBAS KOMITEJU UN PROVIZORISKO TEHNISKO SANĀKSMI, KAS NOTIKS 2019. GADA 13. JŪNIJĀ UN 2019. GADA 12. JŪNIJĀ — IZDEVUMU SAISTĪBAS (Latvian)
21 July 2022
0 references
PO FSE BASILICATA 2014—2020 — ВЪЗЛАГАНЕ НА ОРГАНИЗАЦИЯТА НА МОНИТОРИНГОВИЯ КОМИТЕТ И НА ПРЕДВАРИТЕЛНАТА ТЕХНИЧЕСКА СРЕЩА, КОЯТО ЩЕ СЕ ПРОВЕДЕ НА 13.6.2019 Г. И 12.06.2019 Г. — ПОЕМАНЕ НА ЗАДЪЛЖЕНИЕ ЗА РАЗХОДИ (Bulgarian)
21 July 2022
0 references
PO FSE BASILICATA 2014–2020 – A MONITORINGBIZOTTSÁG SZERVEZÉSÉNEK ÉS A 2019. JÚNIUS 13-ÁN ÉS 2019. JÚNIUS 12-ÉN HATALOMRA KERÜLŐ ELŐZETES TECHNIKAI ÜLÉSNEK A MEGBÍZÁSA – KIADÁSI KÖTELEZETTSÉGVÁLLALÁS (Hungarian)
21 July 2022
0 references
PO FSE BASILICATA 2014-2020 — EAGRÚCHÁN AN CHOISTE FAIREACHÁIN AGUS AN RÉAMHCHRUINNIÚ TEICNIÚIL A THIONÓLFAR I GCUMHACHT AN 13.06.2019 AGUS 12.06.2019 — GEALLTANAS CAITEACHAIS A CHUR DE CHÚRAM (Irish)
21 July 2022
0 references
PO FSE BASILICATA 2014–2020 – ANFÖRTROENDE AV ÖVERVAKNINGSKOMMITTÉNS ORGANISATION OCH DET PRELIMINÄRA TEKNISKA MÖTE SOM SKA ÄGA RUM DEN 13 JUNI 2019 OCH DEN 12 JUNI 2019 – UTGIFTSÅTAGANDEN (Swedish)
21 July 2022
0 references
PO FSE BASILICATA 2014–2020 – JÄRELEVALVEKOMITEE TÖÖ KORRALDAMINE JA ESIALGNE TEHNILINE KOOSOLEK, MIS TOIMUB 13.06.2019 JA 12.06.2019 – KULUKOHUSTUSTE VÕTMINE (Estonian)
21 July 2022
0 references
POTENZA
0 references
8 April 2023
0 references