Energy renovation of 110 social housing units in Saint-Avold (rue du Pré-aux-Moines) (Q3696868): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created a new Item: importing one item from France)
 
(‎Set a claim value: summary (P836): A caldeira a gás que remonta a mais de quinze anos, o isolamento interior que já não atende aos requisitos atuais, bem como as fachadas antigas levaram a Neolia a realizar um programa de reabilitação térmica de 110 habitações rue du Pré-aux-Moines em Saint-Avold.)
 
(18 intermediate revisions by 2 users not shown)
label / enlabel / en
 
Energy renovation of 110 social housing units in Saint-Avold (rue du Pré-aux-Moines)
label / delabel / de
 
Energetische Renovierung von 110 Sozialwohnungen in Saint-Avold (Rue du Pré-aux-Moines)
label / nllabel / nl
 
Energierenovatie van 110 sociale woningen in Saint-Avold (rue du Pré-aux-Moines)
label / itlabel / it
 
Ristrutturazione energetica di 110 alloggi sociali a Saint-Avold (rue du Pré-aux-Moines)
label / eslabel / es
 
Renovación energética de 110 viviendas sociales en Saint-Avold (rue du Pré-aux-Moines)
label / etlabel / et
 
110 sotsiaalkorteri renoveerimine Saint-Avoldis (rue du Pré-aux-Moines)
label / ltlabel / lt
 
110 socialinių būstų renovacija Saint-Avold (rue du Pré-aux-Moines)
label / hrlabel / hr
 
Energetska obnova 110 socijalnih stambenih jedinica u Saint-Avoldu (rue du Pré-aux-Moines)
label / ellabel / el
 
Ενεργειακή ανακαίνιση 110 μονάδων κοινωνικής κατοικίας στο Saint-Avold (rue du Pré-aux-Moines)
label / sklabel / sk
 
Energetická renovácia 110 sociálnych bytov v Saint-Avold (rue du Pré-aux-Moines)
label / filabel / fi
 
Saint-Avoldissa sijaitsevan 110 sosiaalisen asunnon energiakorjaus (rue du Pré-aux-Moines)
label / pllabel / pl
 
Renowacja energetyczna 110 mieszkań socjalnych w Saint-Avold (rue du Pré-aux-Moines)
label / hulabel / hu
 
110 szociális lakás energetikai felújítása Saint-Avoldban (rue du Pré-aux-Moines)
label / cslabel / cs
 
Energetická renovace 110 bytových jednotek v Saint-Avold (rue du Pré-aux-Moines)
label / lvlabel / lv
 
110 sociālo mājokļu energorenovācija Saint-Avold (rue du Pré-aux-Moines)
label / galabel / ga
 
Athchóiriú fuinnimh 110 aonad tithíochta sóisialta in Saint-Avold (rue du Pré-aux-Moines)
label / sllabel / sl
 
Energetska prenova 110 socialnih stanovanjskih enot v Saint-Avoldu (rue du Pré-aux-Moines)
label / bglabel / bg
 
Енергийно саниране на 110 социални жилища в Saint-Avold (rue du Pré-aux-Moines)
label / mtlabel / mt
 
Rinnovazzjoni tal-enerġija ta’ 110 unità ta’ akkomodazzjoni soċjali f’Saint-Avold (rue du Pré-aux-Moines)
label / ptlabel / pt
 
Renovação energética de 110 habitações sociais em Saint-Avold (rue du Pré-aux-Moines)
label / dalabel / da
 
Energirenovering af 110 sociale boliger i Saint-Avold (rue du Pré-aux-Moines)
label / rolabel / ro
 
Renovarea energetică a 110 unități de locuințe sociale din Saint-Avold (rue du Pré-aux-Moines)
label / svlabel / sv
 
Energirenovering av 110 subventionerade bostäder i Saint-Avold (rue du Pré-aux-Moines)
description / endescription / en
Project in France 10958
Project Q3696868 in France
description / bgdescription / bg
 
Проект Q3696868 във Франция
description / hrdescription / hr
 
Projekt Q3696868 u Francuskoj
description / hudescription / hu
 
Projekt Q3696868 Franciaországban
description / csdescription / cs
 
Projekt Q3696868 ve Francii
description / dadescription / da
 
Projekt Q3696868 i Frankrig
description / nldescription / nl
 
Project Q3696868 in Frankrijk
description / etdescription / et
 
Projekt Q3696868 Prantsusmaal
description / fidescription / fi
 
Projekti Q3696868 Ranskassa
description / frdescription / fr
 
Projet Q3696868 en France
description / dedescription / de
 
Projekt Q3696868 in Frankreich
description / eldescription / el
 
Έργο Q3696868 στη Γαλλία
description / gadescription / ga
 
Tionscadal Q3696868 sa Fhrainc
description / itdescription / it
 
Progetto Q3696868 in Francia
description / lvdescription / lv
 
Projekts Q3696868 Francijā
description / ltdescription / lt
 
Projektas Q3696868 Prancūzijoje
description / mtdescription / mt
 
Proġett Q3696868 fi Franza
description / pldescription / pl
 
Projekt Q3696868 we Francji
description / ptdescription / pt
 
Projeto Q3696868 na França
description / rodescription / ro
 
Proiectul Q3696868 în Franța
description / skdescription / sk
 
Projekt Q3696868 vo Francúzsku
description / sldescription / sl
 
Projekt Q3696868 v Franciji
description / esdescription / es
 
Proyecto Q3696868 en Francia
description / svdescription / sv
 
Projekt Q3696868 i Frankrike
Property / postal code
57500
 
Property / postal code: 57500 / rank
Normal rank
 
Property / summary
 
The gas boiler dating back more than fifteen years, the interior insulation that no longer meets the current requirements as well as the old facades have led Neolia to undertake a thermal rehabilitation program of 110 dwellings rue du Pré-aux-Moines in Saint-Avold. (English)
Property / summary: The gas boiler dating back more than fifteen years, the interior insulation that no longer meets the current requirements as well as the old facades have led Neolia to undertake a thermal rehabilitation program of 110 dwellings rue du Pré-aux-Moines in Saint-Avold. (English) / rank
 
Normal rank
Property / summary: The gas boiler dating back more than fifteen years, the interior insulation that no longer meets the current requirements as well as the old facades have led Neolia to undertake a thermal rehabilitation program of 110 dwellings rue du Pré-aux-Moines in Saint-Avold. (English) / qualifier
 
point in time: 22 November 2021
Timestamp+2021-11-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary: The gas boiler dating back more than fifteen years, the interior insulation that no longer meets the current requirements as well as the old facades have led Neolia to undertake a thermal rehabilitation program of 110 dwellings rue du Pré-aux-Moines in Saint-Avold. (English) / qualifier
 
readability score: 0.0017841373026512
Amount0.0017841373026512
Unit1
Property / summary
 
Der mehr als fünfzehn Jahre alte Gaskessel, die Innenisolierung, die nicht mehr den aktuellen Anforderungen entspricht, sowie die veralteten Fassaden führten Neolia zu einem thermischen Sanierungsprogramm von 110 Wohnungen in der Rue du Pré-aux-Moines in St. Avold. (German)
Property / summary: Der mehr als fünfzehn Jahre alte Gaskessel, die Innenisolierung, die nicht mehr den aktuellen Anforderungen entspricht, sowie die veralteten Fassaden führten Neolia zu einem thermischen Sanierungsprogramm von 110 Wohnungen in der Rue du Pré-aux-Moines in St. Avold. (German) / rank
 
Normal rank
Property / summary: Der mehr als fünfzehn Jahre alte Gaskessel, die Innenisolierung, die nicht mehr den aktuellen Anforderungen entspricht, sowie die veralteten Fassaden führten Neolia zu einem thermischen Sanierungsprogramm von 110 Wohnungen in der Rue du Pré-aux-Moines in St. Avold. (German) / qualifier
 
point in time: 1 December 2021
Timestamp+2021-12-01T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
De gasketel dateert van meer dan vijftien jaar, de binnenisolatie die niet langer aan de huidige eisen voldoet, evenals de oude gevels hebben Neolia ertoe gebracht om een thermisch revalidatieprogramma uit te voeren van 110 woningen rue du Pré-aux-Moines in Saint-Avold. (Dutch)
Property / summary: De gasketel dateert van meer dan vijftien jaar, de binnenisolatie die niet langer aan de huidige eisen voldoet, evenals de oude gevels hebben Neolia ertoe gebracht om een thermisch revalidatieprogramma uit te voeren van 110 woningen rue du Pré-aux-Moines in Saint-Avold. (Dutch) / rank
 
Normal rank
Property / summary: De gasketel dateert van meer dan vijftien jaar, de binnenisolatie die niet langer aan de huidige eisen voldoet, evenals de oude gevels hebben Neolia ertoe gebracht om een thermisch revalidatieprogramma uit te voeren van 110 woningen rue du Pré-aux-Moines in Saint-Avold. (Dutch) / qualifier
 
point in time: 6 December 2021
Timestamp+2021-12-06T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
La caldaia a gas risalente a più di quindici anni fa, l'isolamento interno che non soddisfa più i requisiti attuali e le vecchie facciate hanno portato Neolia a intraprendere un programma di riabilitazione termica di 110 abitazioni rue du Pré-aux-Moines a Saint-Avold. (Italian)
Property / summary: La caldaia a gas risalente a più di quindici anni fa, l'isolamento interno che non soddisfa più i requisiti attuali e le vecchie facciate hanno portato Neolia a intraprendere un programma di riabilitazione termica di 110 abitazioni rue du Pré-aux-Moines a Saint-Avold. (Italian) / rank
 
Normal rank
Property / summary: La caldaia a gas risalente a più di quindici anni fa, l'isolamento interno che non soddisfa più i requisiti attuali e le vecchie facciate hanno portato Neolia a intraprendere un programma di riabilitazione termica di 110 abitazioni rue du Pré-aux-Moines a Saint-Avold. (Italian) / qualifier
 
point in time: 13 January 2022
Timestamp+2022-01-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
La caldera de gas que data de hace más de quince años, el aislamiento interior que ya no cumple con los requisitos actuales, así como las fachadas antiguas, han llevado a Neolia a emprender un programa de rehabilitación térmica de 110 viviendas rue du Pré-aux-Moines en Saint-Avold. (Spanish)
Property / summary: La caldera de gas que data de hace más de quince años, el aislamiento interior que ya no cumple con los requisitos actuales, así como las fachadas antiguas, han llevado a Neolia a emprender un programa de rehabilitación térmica de 110 viviendas rue du Pré-aux-Moines en Saint-Avold. (Spanish) / rank
 
Normal rank
Property / summary: La caldera de gas que data de hace más de quince años, el aislamiento interior que ya no cumple con los requisitos actuales, así como las fachadas antiguas, han llevado a Neolia a emprender un programa de rehabilitación térmica de 110 viviendas rue du Pré-aux-Moines en Saint-Avold. (Spanish) / qualifier
 
point in time: 14 January 2022
Timestamp+2022-01-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Enam kui viieteistkümne aasta tagune gaasikatel, siseruumide isolatsioon, mis ei vasta enam praegustele nõuetele, ning vanad fassaadid on viinud Neolia ellu soojustusravi programmi, mis koosneb 110 korterist rue du Pré-aux-Moines Saint-Avoldis. (Estonian)
Property / summary: Enam kui viieteistkümne aasta tagune gaasikatel, siseruumide isolatsioon, mis ei vasta enam praegustele nõuetele, ning vanad fassaadid on viinud Neolia ellu soojustusravi programmi, mis koosneb 110 korterist rue du Pré-aux-Moines Saint-Avoldis. (Estonian) / rank
 
Normal rank
Property / summary: Enam kui viieteistkümne aasta tagune gaasikatel, siseruumide isolatsioon, mis ei vasta enam praegustele nõuetele, ning vanad fassaadid on viinud Neolia ellu soojustusravi programmi, mis koosneb 110 korterist rue du Pré-aux-Moines Saint-Avoldis. (Estonian) / qualifier
 
point in time: 11 August 2022
Timestamp+2022-08-11T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Daugiau nei penkiolika metų dujinis katilas, nebeatitikęs dabartinių reikalavimų, taip pat seni fasadai paskatino Neolia vykdyti 110 gyvenamųjų patalpų rue du Pré-aux-Moines šilumos renovacijos programą Saint-Avold. (Lithuanian)
Property / summary: Daugiau nei penkiolika metų dujinis katilas, nebeatitikęs dabartinių reikalavimų, taip pat seni fasadai paskatino Neolia vykdyti 110 gyvenamųjų patalpų rue du Pré-aux-Moines šilumos renovacijos programą Saint-Avold. (Lithuanian) / rank
 
Normal rank
Property / summary: Daugiau nei penkiolika metų dujinis katilas, nebeatitikęs dabartinių reikalavimų, taip pat seni fasadai paskatino Neolia vykdyti 110 gyvenamųjų patalpų rue du Pré-aux-Moines šilumos renovacijos programą Saint-Avold. (Lithuanian) / qualifier
 
point in time: 11 August 2022
Timestamp+2022-08-11T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Plinski kotao datiraju više od petnaest godina, unutarnja izolacija koja više ne zadovoljava trenutne zahtjeve, kao i stare fasade doveli su Neolia da poduzme program toplinske rehabilitacije 110 stanova rue du Pré-aux-Moines u Saint-Avoldu. (Croatian)
Property / summary: Plinski kotao datiraju više od petnaest godina, unutarnja izolacija koja više ne zadovoljava trenutne zahtjeve, kao i stare fasade doveli su Neolia da poduzme program toplinske rehabilitacije 110 stanova rue du Pré-aux-Moines u Saint-Avoldu. (Croatian) / rank
 
Normal rank
Property / summary: Plinski kotao datiraju više od petnaest godina, unutarnja izolacija koja više ne zadovoljava trenutne zahtjeve, kao i stare fasade doveli su Neolia da poduzme program toplinske rehabilitacije 110 stanova rue du Pré-aux-Moines u Saint-Avoldu. (Croatian) / qualifier
 
point in time: 11 August 2022
Timestamp+2022-08-11T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Ο λέβητας φυσικού αερίου που χρονολογείται πάνω από δεκαπέντε χρόνια, η εσωτερική μόνωση που δεν πληροί πλέον τις τρέχουσες απαιτήσεις, καθώς και οι παλιές προσόψεις έχουν οδηγήσει τη Νεολία να αναλάβει ένα πρόγραμμα θερμικής αποκατάστασης 110 κατοικιών rue du Pré-aux-Moines στο Saint-Avold. (Greek)
Property / summary: Ο λέβητας φυσικού αερίου που χρονολογείται πάνω από δεκαπέντε χρόνια, η εσωτερική μόνωση που δεν πληροί πλέον τις τρέχουσες απαιτήσεις, καθώς και οι παλιές προσόψεις έχουν οδηγήσει τη Νεολία να αναλάβει ένα πρόγραμμα θερμικής αποκατάστασης 110 κατοικιών rue du Pré-aux-Moines στο Saint-Avold. (Greek) / rank
 
Normal rank
Property / summary: Ο λέβητας φυσικού αερίου που χρονολογείται πάνω από δεκαπέντε χρόνια, η εσωτερική μόνωση που δεν πληροί πλέον τις τρέχουσες απαιτήσεις, καθώς και οι παλιές προσόψεις έχουν οδηγήσει τη Νεολία να αναλάβει ένα πρόγραμμα θερμικής αποκατάστασης 110 κατοικιών rue du Pré-aux-Moines στο Saint-Avold. (Greek) / qualifier
 
point in time: 11 August 2022
Timestamp+2022-08-11T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Plynový kotol siahajúci viac ako pätnásť rokov, vnútorná izolácia, ktorá už nespĺňa súčasné požiadavky, ako aj staré fasády viedli Neolia k realizácii programu tepelnej obnovy 110 obydlí rue du Pré-aux-Moines v Saint-Avold. (Slovak)
Property / summary: Plynový kotol siahajúci viac ako pätnásť rokov, vnútorná izolácia, ktorá už nespĺňa súčasné požiadavky, ako aj staré fasády viedli Neolia k realizácii programu tepelnej obnovy 110 obydlí rue du Pré-aux-Moines v Saint-Avold. (Slovak) / rank
 
Normal rank
Property / summary: Plynový kotol siahajúci viac ako pätnásť rokov, vnútorná izolácia, ktorá už nespĺňa súčasné požiadavky, ako aj staré fasády viedli Neolia k realizácii programu tepelnej obnovy 110 obydlí rue du Pré-aux-Moines v Saint-Avold. (Slovak) / qualifier
 
point in time: 11 August 2022
Timestamp+2022-08-11T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Yli viisitoista vuotta vanha kaasukattila, sisäeristys, joka ei enää täytä nykyisiä vaatimuksia, sekä vanhat julkisivut ovat johtaneet Neolian toteuttamaan 110 asunnon lämpökuntoutusohjelman Saint-Avoldissa. (Finnish)
Property / summary: Yli viisitoista vuotta vanha kaasukattila, sisäeristys, joka ei enää täytä nykyisiä vaatimuksia, sekä vanhat julkisivut ovat johtaneet Neolian toteuttamaan 110 asunnon lämpökuntoutusohjelman Saint-Avoldissa. (Finnish) / rank
 
Normal rank
Property / summary: Yli viisitoista vuotta vanha kaasukattila, sisäeristys, joka ei enää täytä nykyisiä vaatimuksia, sekä vanhat julkisivut ovat johtaneet Neolian toteuttamaan 110 asunnon lämpökuntoutusohjelman Saint-Avoldissa. (Finnish) / qualifier
 
point in time: 11 August 2022
Timestamp+2022-08-11T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Kocioł gazowy sięgający ponad piętnastu lat, izolacja wewnętrzna, która nie spełnia już obecnych wymagań, a także stare fasady doprowadziły Neolię do podjęcia programu rehabilitacji termicznej 110 mieszkań rue du Pré-aux-Moines w Saint-Avold. (Polish)
Property / summary: Kocioł gazowy sięgający ponad piętnastu lat, izolacja wewnętrzna, która nie spełnia już obecnych wymagań, a także stare fasady doprowadziły Neolię do podjęcia programu rehabilitacji termicznej 110 mieszkań rue du Pré-aux-Moines w Saint-Avold. (Polish) / rank
 
Normal rank
Property / summary: Kocioł gazowy sięgający ponad piętnastu lat, izolacja wewnętrzna, która nie spełnia już obecnych wymagań, a także stare fasady doprowadziły Neolię do podjęcia programu rehabilitacji termicznej 110 mieszkań rue du Pré-aux-Moines w Saint-Avold. (Polish) / qualifier
 
point in time: 11 August 2022
Timestamp+2022-08-11T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
A több mint tizenöt éves gázkazán, a belső szigetelés, amely már nem felel meg a jelenlegi követelményeknek, valamint a régi homlokzatok arra késztették Neoliát, hogy a Saint-Avold-i rue du Pré-aux-Moines 110 lakásának termálrehabilitációs programját hajtsa végre. (Hungarian)
Property / summary: A több mint tizenöt éves gázkazán, a belső szigetelés, amely már nem felel meg a jelenlegi követelményeknek, valamint a régi homlokzatok arra késztették Neoliát, hogy a Saint-Avold-i rue du Pré-aux-Moines 110 lakásának termálrehabilitációs programját hajtsa végre. (Hungarian) / rank
 
Normal rank
Property / summary: A több mint tizenöt éves gázkazán, a belső szigetelés, amely már nem felel meg a jelenlegi követelményeknek, valamint a régi homlokzatok arra késztették Neoliát, hogy a Saint-Avold-i rue du Pré-aux-Moines 110 lakásának termálrehabilitációs programját hajtsa végre. (Hungarian) / qualifier
 
point in time: 11 August 2022
Timestamp+2022-08-11T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Plynový kotel sahá více než patnáct let, vnitřní izolace, která již nesplňuje současné požadavky, stejně jako staré fasády vedly Neolia k provedení programu tepelné obnovy 110 bytů rue du Pré-aux-Moines v Saint-Avold. (Czech)
Property / summary: Plynový kotel sahá více než patnáct let, vnitřní izolace, která již nesplňuje současné požadavky, stejně jako staré fasády vedly Neolia k provedení programu tepelné obnovy 110 bytů rue du Pré-aux-Moines v Saint-Avold. (Czech) / rank
 
Normal rank
Property / summary: Plynový kotel sahá více než patnáct let, vnitřní izolace, která již nesplňuje současné požadavky, stejně jako staré fasády vedly Neolia k provedení programu tepelné obnovy 110 bytů rue du Pré-aux-Moines v Saint-Avold. (Czech) / qualifier
 
point in time: 11 August 2022
Timestamp+2022-08-11T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Gāzes apkures katls, kas datēts ar vairāk nekā piecpadsmit gadiem, interjera siltināšana, kas vairs neatbilst pašreizējām prasībām, kā arī vecās fasādes ir likušas Neolia īstenot 110 mājokļu rue du Pré-aux-Moines siltumizolācijas programmu Saint-Avold. (Latvian)
Property / summary: Gāzes apkures katls, kas datēts ar vairāk nekā piecpadsmit gadiem, interjera siltināšana, kas vairs neatbilst pašreizējām prasībām, kā arī vecās fasādes ir likušas Neolia īstenot 110 mājokļu rue du Pré-aux-Moines siltumizolācijas programmu Saint-Avold. (Latvian) / rank
 
Normal rank
Property / summary: Gāzes apkures katls, kas datēts ar vairāk nekā piecpadsmit gadiem, interjera siltināšana, kas vairs neatbilst pašreizējām prasībām, kā arī vecās fasādes ir likušas Neolia īstenot 110 mājokļu rue du Pré-aux-Moines siltumizolācijas programmu Saint-Avold. (Latvian) / qualifier
 
point in time: 11 August 2022
Timestamp+2022-08-11T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Tá an coire gáis ag dul siar níos mó ná cúig bliana déag, an insliú taobh istigh nach gcomhlíonann na riachtanais reatha a thuilleadh chomh maith leis na sean-aghaidheanna faoi stiúir Neolia chun tabhairt faoi chlár athshlánúcháin teirmeach de 110 teaghaisí rue du Pré-aux-Moines i Saint-Avold. (Irish)
Property / summary: Tá an coire gáis ag dul siar níos mó ná cúig bliana déag, an insliú taobh istigh nach gcomhlíonann na riachtanais reatha a thuilleadh chomh maith leis na sean-aghaidheanna faoi stiúir Neolia chun tabhairt faoi chlár athshlánúcháin teirmeach de 110 teaghaisí rue du Pré-aux-Moines i Saint-Avold. (Irish) / rank
 
Normal rank
Property / summary: Tá an coire gáis ag dul siar níos mó ná cúig bliana déag, an insliú taobh istigh nach gcomhlíonann na riachtanais reatha a thuilleadh chomh maith leis na sean-aghaidheanna faoi stiúir Neolia chun tabhairt faoi chlár athshlánúcháin teirmeach de 110 teaghaisí rue du Pré-aux-Moines i Saint-Avold. (Irish) / qualifier
 
point in time: 11 August 2022
Timestamp+2022-08-11T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Plinski kotel izpred več kot petnajstih let, notranja izolacija, ki ne izpolnjuje več sedanjih zahtev, kot tudi stare fasade so Neolio pripeljali do izvedbe termičnega rehabilitacijskega programa 110 stanovanj rue du Pré-aux-Moines v Saint-Avoldu. (Slovenian)
Property / summary: Plinski kotel izpred več kot petnajstih let, notranja izolacija, ki ne izpolnjuje več sedanjih zahtev, kot tudi stare fasade so Neolio pripeljali do izvedbe termičnega rehabilitacijskega programa 110 stanovanj rue du Pré-aux-Moines v Saint-Avoldu. (Slovenian) / rank
 
Normal rank
Property / summary: Plinski kotel izpred več kot petnajstih let, notranja izolacija, ki ne izpolnjuje več sedanjih zahtev, kot tudi stare fasade so Neolio pripeljali do izvedbe termičnega rehabilitacijskega programa 110 stanovanj rue du Pré-aux-Moines v Saint-Avoldu. (Slovenian) / qualifier
 
point in time: 11 August 2022
Timestamp+2022-08-11T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Газовият котел, датиращ от повече от петнадесет години, вътрешната изолация, която вече не отговаря на настоящите изисквания, както и старите фасади, накараха Neolia да предприеме програма за топлинна рехабилитация на 110 жилища rue du Pré-aux-Moines в Сен-Аволд. (Bulgarian)
Property / summary: Газовият котел, датиращ от повече от петнадесет години, вътрешната изолация, която вече не отговаря на настоящите изисквания, както и старите фасади, накараха Neolia да предприеме програма за топлинна рехабилитация на 110 жилища rue du Pré-aux-Moines в Сен-Аволд. (Bulgarian) / rank
 
Normal rank
Property / summary: Газовият котел, датиращ от повече от петнадесет години, вътрешната изолация, която вече не отговаря на настоящите изисквания, както и старите фасади, накараха Neolia да предприеме програма за топлинна рехабилитация на 110 жилища rue du Pré-aux-Moines в Сен-Аволд. (Bulgarian) / qualifier
 
point in time: 11 August 2022
Timestamp+2022-08-11T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Il-bojler tal-gass li jmur lura aktar minn ħmistax-il sena, l-insulazzjoni interna li m’għadhiex tissodisfa r-rekwiżiti attwali kif ukoll il-faċċati qodma wasslu lil Neolia biex twettaq programm ta’ riabilitazzjoni termali ta’ 110 djar rue du Pré-aux-Moines f’Saint-Avold. (Maltese)
Property / summary: Il-bojler tal-gass li jmur lura aktar minn ħmistax-il sena, l-insulazzjoni interna li m’għadhiex tissodisfa r-rekwiżiti attwali kif ukoll il-faċċati qodma wasslu lil Neolia biex twettaq programm ta’ riabilitazzjoni termali ta’ 110 djar rue du Pré-aux-Moines f’Saint-Avold. (Maltese) / rank
 
Normal rank
Property / summary: Il-bojler tal-gass li jmur lura aktar minn ħmistax-il sena, l-insulazzjoni interna li m’għadhiex tissodisfa r-rekwiżiti attwali kif ukoll il-faċċati qodma wasslu lil Neolia biex twettaq programm ta’ riabilitazzjoni termali ta’ 110 djar rue du Pré-aux-Moines f’Saint-Avold. (Maltese) / qualifier
 
point in time: 11 August 2022
Timestamp+2022-08-11T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
A caldeira a gás que remonta a mais de quinze anos, o isolamento interior que já não atende aos requisitos atuais, bem como as fachadas antigas levaram a Neolia a realizar um programa de reabilitação térmica de 110 habitações rue du Pré-aux-Moines em Saint-Avold. (Portuguese)
Property / summary: A caldeira a gás que remonta a mais de quinze anos, o isolamento interior que já não atende aos requisitos atuais, bem como as fachadas antigas levaram a Neolia a realizar um programa de reabilitação térmica de 110 habitações rue du Pré-aux-Moines em Saint-Avold. (Portuguese) / rank
 
Normal rank
Property / summary: A caldeira a gás que remonta a mais de quinze anos, o isolamento interior que já não atende aos requisitos atuais, bem como as fachadas antigas levaram a Neolia a realizar um programa de reabilitação térmica de 110 habitações rue du Pré-aux-Moines em Saint-Avold. (Portuguese) / qualifier
 
point in time: 11 August 2022
Timestamp+2022-08-11T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Gaskedlen fra mere end femten år, den indvendige isolering, der ikke længere opfylder de nuværende krav samt de gamle facader har ført Neolia til at gennemføre et termisk rehabiliteringsprogram af 110 boliger rue du Pré-aux-Moines i Saint-Avold. (Danish)
Property / summary: Gaskedlen fra mere end femten år, den indvendige isolering, der ikke længere opfylder de nuværende krav samt de gamle facader har ført Neolia til at gennemføre et termisk rehabiliteringsprogram af 110 boliger rue du Pré-aux-Moines i Saint-Avold. (Danish) / rank
 
Normal rank
Property / summary: Gaskedlen fra mere end femten år, den indvendige isolering, der ikke længere opfylder de nuværende krav samt de gamle facader har ført Neolia til at gennemføre et termisk rehabiliteringsprogram af 110 boliger rue du Pré-aux-Moines i Saint-Avold. (Danish) / qualifier
 
point in time: 11 August 2022
Timestamp+2022-08-11T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Cazanul cu gaz datând de peste cincisprezece ani, izolația interioară care nu mai îndeplinește cerințele actuale, precum și fațadele vechi au determinat Neolia să întreprindă un program de reabilitare termică de 110 locuințe rue du Pré-aux-Moines din Saint-Avold. (Romanian)
Property / summary: Cazanul cu gaz datând de peste cincisprezece ani, izolația interioară care nu mai îndeplinește cerințele actuale, precum și fațadele vechi au determinat Neolia să întreprindă un program de reabilitare termică de 110 locuințe rue du Pré-aux-Moines din Saint-Avold. (Romanian) / rank
 
Normal rank
Property / summary: Cazanul cu gaz datând de peste cincisprezece ani, izolația interioară care nu mai îndeplinește cerințele actuale, precum și fațadele vechi au determinat Neolia să întreprindă un program de reabilitare termică de 110 locuințe rue du Pré-aux-Moines din Saint-Avold. (Romanian) / qualifier
 
point in time: 11 August 2022
Timestamp+2022-08-11T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Gaspannan som går tillbaka mer än femton år, den inre isoleringen som inte längre uppfyller de nuvarande kraven samt de gamla fasaderna har fått Neolia att genomföra ett värmerehabiliteringsprogram på 110 bostäder rue du Pré-aux-Moines i Saint-Avold. (Swedish)
Property / summary: Gaspannan som går tillbaka mer än femton år, den inre isoleringen som inte längre uppfyller de nuvarande kraven samt de gamla fasaderna har fått Neolia att genomföra ett värmerehabiliteringsprogram på 110 bostäder rue du Pré-aux-Moines i Saint-Avold. (Swedish) / rank
 
Normal rank
Property / summary: Gaspannan som går tillbaka mer än femton år, den inre isoleringen som inte längre uppfyller de nuvarande kraven samt de gamla fasaderna har fått Neolia att genomföra ett värmerehabiliteringsprogram på 110 bostäder rue du Pré-aux-Moines i Saint-Avold. (Swedish) / qualifier
 
point in time: 11 August 2022
Timestamp+2022-08-11T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / beneficiary
 
Property / beneficiary: Q3772656 / rank
 
Normal rank
Property / postal code
 
57500
Property / postal code: 57500 / rank
 
Normal rank
Property / contained in NUTS
 
Property / contained in NUTS: Moselle / rank
 
Normal rank
Property / contained in NUTS: Moselle / qualifier
 
Property / contained in Local Administrative Unit
 
Property / contained in Local Administrative Unit: Saint-Avold / rank
 
Normal rank
Property / contained in Local Administrative Unit: Saint-Avold / qualifier
 
Property / coordinate location
 
49°6'28.30"N, 6°42'31.54"E
Latitude49.107858184615
Longitude6.7087578076923
Precision1.0E-5
Globehttp://www.wikidata.org/entity/Q2
Property / coordinate location: 49°6'28.30"N, 6°42'31.54"E / rank
 
Normal rank
Property / coordinate location: 49°6'28.30"N, 6°42'31.54"E / qualifier
 
Property / date of last update
 
7 December 2023
Timestamp+2023-12-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / date of last update: 7 December 2023 / rank
 
Normal rank

Latest revision as of 02:22, 9 October 2024

Project Q3696868 in France
Language Label Description Also known as
English
Energy renovation of 110 social housing units in Saint-Avold (rue du Pré-aux-Moines)
Project Q3696868 in France

    Statements

    0 references
    357,952.35 Euro
    0 references
    1,022,721.0 Euro
    0 references
    35.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2019
    0 references
    LOGIEST
    0 references
    0 references

    49°6'28.30"N, 6°42'31.54"E
    0 references
    57500
    0 references
    La chaudière gaz datant de plus de quinze ans, l'isolation intérieure qui ne répond plus aux exigences actuelles ainsi que les façades vétustes ont conduit NEOLIA a engagé un programme de réhabilitation thermique de 110 logements rue du Pré-aux-Moines à Saint-Avold. (French)
    0 references
    The gas boiler dating back more than fifteen years, the interior insulation that no longer meets the current requirements as well as the old facades have led Neolia to undertake a thermal rehabilitation program of 110 dwellings rue du Pré-aux-Moines in Saint-Avold. (English)
    22 November 2021
    0.0017841373026512
    0 references
    Der mehr als fünfzehn Jahre alte Gaskessel, die Innenisolierung, die nicht mehr den aktuellen Anforderungen entspricht, sowie die veralteten Fassaden führten Neolia zu einem thermischen Sanierungsprogramm von 110 Wohnungen in der Rue du Pré-aux-Moines in St. Avold. (German)
    1 December 2021
    0 references
    De gasketel dateert van meer dan vijftien jaar, de binnenisolatie die niet langer aan de huidige eisen voldoet, evenals de oude gevels hebben Neolia ertoe gebracht om een thermisch revalidatieprogramma uit te voeren van 110 woningen rue du Pré-aux-Moines in Saint-Avold. (Dutch)
    6 December 2021
    0 references
    La caldaia a gas risalente a più di quindici anni fa, l'isolamento interno che non soddisfa più i requisiti attuali e le vecchie facciate hanno portato Neolia a intraprendere un programma di riabilitazione termica di 110 abitazioni rue du Pré-aux-Moines a Saint-Avold. (Italian)
    13 January 2022
    0 references
    La caldera de gas que data de hace más de quince años, el aislamiento interior que ya no cumple con los requisitos actuales, así como las fachadas antiguas, han llevado a Neolia a emprender un programa de rehabilitación térmica de 110 viviendas rue du Pré-aux-Moines en Saint-Avold. (Spanish)
    14 January 2022
    0 references
    Enam kui viieteistkümne aasta tagune gaasikatel, siseruumide isolatsioon, mis ei vasta enam praegustele nõuetele, ning vanad fassaadid on viinud Neolia ellu soojustusravi programmi, mis koosneb 110 korterist rue du Pré-aux-Moines Saint-Avoldis. (Estonian)
    11 August 2022
    0 references
    Daugiau nei penkiolika metų dujinis katilas, nebeatitikęs dabartinių reikalavimų, taip pat seni fasadai paskatino Neolia vykdyti 110 gyvenamųjų patalpų rue du Pré-aux-Moines šilumos renovacijos programą Saint-Avold. (Lithuanian)
    11 August 2022
    0 references
    Plinski kotao datiraju više od petnaest godina, unutarnja izolacija koja više ne zadovoljava trenutne zahtjeve, kao i stare fasade doveli su Neolia da poduzme program toplinske rehabilitacije 110 stanova rue du Pré-aux-Moines u Saint-Avoldu. (Croatian)
    11 August 2022
    0 references
    Ο λέβητας φυσικού αερίου που χρονολογείται πάνω από δεκαπέντε χρόνια, η εσωτερική μόνωση που δεν πληροί πλέον τις τρέχουσες απαιτήσεις, καθώς και οι παλιές προσόψεις έχουν οδηγήσει τη Νεολία να αναλάβει ένα πρόγραμμα θερμικής αποκατάστασης 110 κατοικιών rue du Pré-aux-Moines στο Saint-Avold. (Greek)
    11 August 2022
    0 references
    Plynový kotol siahajúci viac ako pätnásť rokov, vnútorná izolácia, ktorá už nespĺňa súčasné požiadavky, ako aj staré fasády viedli Neolia k realizácii programu tepelnej obnovy 110 obydlí rue du Pré-aux-Moines v Saint-Avold. (Slovak)
    11 August 2022
    0 references
    Yli viisitoista vuotta vanha kaasukattila, sisäeristys, joka ei enää täytä nykyisiä vaatimuksia, sekä vanhat julkisivut ovat johtaneet Neolian toteuttamaan 110 asunnon lämpökuntoutusohjelman Saint-Avoldissa. (Finnish)
    11 August 2022
    0 references
    Kocioł gazowy sięgający ponad piętnastu lat, izolacja wewnętrzna, która nie spełnia już obecnych wymagań, a także stare fasady doprowadziły Neolię do podjęcia programu rehabilitacji termicznej 110 mieszkań rue du Pré-aux-Moines w Saint-Avold. (Polish)
    11 August 2022
    0 references
    A több mint tizenöt éves gázkazán, a belső szigetelés, amely már nem felel meg a jelenlegi követelményeknek, valamint a régi homlokzatok arra késztették Neoliát, hogy a Saint-Avold-i rue du Pré-aux-Moines 110 lakásának termálrehabilitációs programját hajtsa végre. (Hungarian)
    11 August 2022
    0 references
    Plynový kotel sahá více než patnáct let, vnitřní izolace, která již nesplňuje současné požadavky, stejně jako staré fasády vedly Neolia k provedení programu tepelné obnovy 110 bytů rue du Pré-aux-Moines v Saint-Avold. (Czech)
    11 August 2022
    0 references
    Gāzes apkures katls, kas datēts ar vairāk nekā piecpadsmit gadiem, interjera siltināšana, kas vairs neatbilst pašreizējām prasībām, kā arī vecās fasādes ir likušas Neolia īstenot 110 mājokļu rue du Pré-aux-Moines siltumizolācijas programmu Saint-Avold. (Latvian)
    11 August 2022
    0 references
    Tá an coire gáis ag dul siar níos mó ná cúig bliana déag, an insliú taobh istigh nach gcomhlíonann na riachtanais reatha a thuilleadh chomh maith leis na sean-aghaidheanna faoi stiúir Neolia chun tabhairt faoi chlár athshlánúcháin teirmeach de 110 teaghaisí rue du Pré-aux-Moines i Saint-Avold. (Irish)
    11 August 2022
    0 references
    Plinski kotel izpred več kot petnajstih let, notranja izolacija, ki ne izpolnjuje več sedanjih zahtev, kot tudi stare fasade so Neolio pripeljali do izvedbe termičnega rehabilitacijskega programa 110 stanovanj rue du Pré-aux-Moines v Saint-Avoldu. (Slovenian)
    11 August 2022
    0 references
    Газовият котел, датиращ от повече от петнадесет години, вътрешната изолация, която вече не отговаря на настоящите изисквания, както и старите фасади, накараха Neolia да предприеме програма за топлинна рехабилитация на 110 жилища rue du Pré-aux-Moines в Сен-Аволд. (Bulgarian)
    11 August 2022
    0 references
    Il-bojler tal-gass li jmur lura aktar minn ħmistax-il sena, l-insulazzjoni interna li m’għadhiex tissodisfa r-rekwiżiti attwali kif ukoll il-faċċati qodma wasslu lil Neolia biex twettaq programm ta’ riabilitazzjoni termali ta’ 110 djar rue du Pré-aux-Moines f’Saint-Avold. (Maltese)
    11 August 2022
    0 references
    A caldeira a gás que remonta a mais de quinze anos, o isolamento interior que já não atende aos requisitos atuais, bem como as fachadas antigas levaram a Neolia a realizar um programa de reabilitação térmica de 110 habitações rue du Pré-aux-Moines em Saint-Avold. (Portuguese)
    11 August 2022
    0 references
    Gaskedlen fra mere end femten år, den indvendige isolering, der ikke længere opfylder de nuværende krav samt de gamle facader har ført Neolia til at gennemføre et termisk rehabiliteringsprogram af 110 boliger rue du Pré-aux-Moines i Saint-Avold. (Danish)
    11 August 2022
    0 references
    Cazanul cu gaz datând de peste cincisprezece ani, izolația interioară care nu mai îndeplinește cerințele actuale, precum și fațadele vechi au determinat Neolia să întreprindă un program de reabilitare termică de 110 locuințe rue du Pré-aux-Moines din Saint-Avold. (Romanian)
    11 August 2022
    0 references
    Gaspannan som går tillbaka mer än femton år, den inre isoleringen som inte längre uppfyller de nuvarande kraven samt de gamla fasaderna har fått Neolia att genomföra ett värmerehabiliteringsprogram på 110 bostäder rue du Pré-aux-Moines i Saint-Avold. (Swedish)
    11 August 2022
    0 references
    7 December 2023
    0 references

    Identifiers

    LO0007554
    0 references