South Muntenia support for the preparation of projects financed from the 2021-2027 programming period in the field of smart specialisation (Q3099660): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en) |
(Changed label, description and/or aliases in pt) |
||||||||||||||
(33 intermediate revisions by 2 users not shown) | |||||||||||||||
label / en | label / en | ||||||||||||||
South Muntenia support for the preparation of projects financed from the 2021-2027 programming period in the field of smart specialisation | |||||||||||||||
label / fr | label / fr | ||||||||||||||
Soutien de Muntenia Sud à la préparation de projets financés sur la période de programmation 2021-2027 dans le domaine de la spécialisation intelligente | |||||||||||||||
label / de | label / de | ||||||||||||||
Süd-Müntenia-Unterstützung für die Vorbereitung von Projekten, die aus dem Programmplanungszeitraum 2021-2027 im Bereich der intelligenten Spezialisierung finanziert werden | |||||||||||||||
label / nl | label / nl | ||||||||||||||
Zuid-Müntenia-steun voor de voorbereiding van projecten die uit de programmeringsperiode 2021-2027 worden gefinancierd op het gebied van slimme specialisatie | |||||||||||||||
label / it | label / it | ||||||||||||||
Sostegno della Muntenia meridionale alla preparazione di progetti finanziati dal periodo di programmazione 2021-2027 nel settore della specializzazione intelligente | |||||||||||||||
label / es | label / es | ||||||||||||||
Apoyo de Muntenia meridional para la preparación de proyectos financiados con cargo al período de programación 2021-2027 en el ámbito de la especialización inteligente | |||||||||||||||
label / et | label / et | ||||||||||||||
Lõuna-Muntenia toetus programmitöö perioodil 2021–2027 rahastatavate aruka spetsialiseerumise projektide ettevalmistamiseks | |||||||||||||||
label / lt | label / lt | ||||||||||||||
Pietų Muntenijos parama rengiant projektus, finansuojamus iš 2021–2027 m. programavimo laikotarpio pažangiosios specializacijos srityje | |||||||||||||||
label / hr | label / hr | ||||||||||||||
Potpora Južne Muntenije za pripremu projekata financiranih iz programskog razdoblja 2021. – 2027. u području pametne specijalizacije | |||||||||||||||
label / el | label / el | ||||||||||||||
Στήριξη της Νότιας Μουντενίας για την προετοιμασία έργων που χρηματοδοτούνται από την περίοδο προγραμματισμού 2021-2027 στον τομέα της έξυπνης εξειδίκευσης | |||||||||||||||
label / sk | label / sk | ||||||||||||||
Podpora Južnej Munténie na prípravu projektov financovaných z programového obdobia 2021 – 2027 v oblasti inteligentnej špecializácie | |||||||||||||||
label / fi | label / fi | ||||||||||||||
Etelä-Muntenian tuki ohjelmakaudelta 2021–2027 rahoitettavien älykkään erikoistumisen alan hankkeiden valmisteluun | |||||||||||||||
label / pl | label / pl | ||||||||||||||
Wsparcie South Muntenia na przygotowanie projektów finansowanych z okresu programowania 2021-2027 w dziedzinie inteligentnej specjalizacji | |||||||||||||||
label / hu | label / hu | ||||||||||||||
Dél-Müntenia támogatása a 2021–2027-es programozási időszakból finanszírozott projektek előkészítéséhez az intelligens szakosodás területén | |||||||||||||||
label / cs | label / cs | ||||||||||||||
Podpora South Muntenia na přípravu projektů financovaných z programového období 2021–2027 v oblasti inteligentní specializace | |||||||||||||||
label / lv | label / lv | ||||||||||||||
Dienvidmuntenia atbalsts tādu projektu sagatavošanai, kas tiek finansēti no 2021.–2027. gada plānošanas perioda pārdomātas specializācijas jomā | |||||||||||||||
label / ga | label / ga | ||||||||||||||
Tacaíocht ó Muntenia Theas chun tionscadail a mhaoinítear ón gclárthréimhse 2021-2027 i réimse na speisialtóireachta cliste a ullmhú | |||||||||||||||
label / sl | label / sl | ||||||||||||||
Podpora Južni Muntenii za pripravo projektov, ki se financirajo iz programskega obdobja 2021–2027 na področju pametne specializacije | |||||||||||||||
label / bg | label / bg | ||||||||||||||
Подкрепа на Южна Мунтения за подготовката на проекти, финансирани от програмния период 2021—2027 г. в областта на интелигентната специализация | |||||||||||||||
label / mt | label / mt | ||||||||||||||
Appoġġ għan-Nofsinhar tal-Muntenia għat-tħejjija ta’ proġetti ffinanzjati mill-perjodu ta’ programmazzjoni 2021–2027 fil-qasam tal-ispeċjalizzazzjoni intelliġenti | |||||||||||||||
label / pt | label / pt | ||||||||||||||
Apoio da South Muntenia à preparação de projetos financiados a partir do período de programação de 2021-2027 no domínio da especialização inteligente | |||||||||||||||
label / da | label / da | ||||||||||||||
Syd Muntenia-støtte til forberedelse af projekter, der finansieres over programmeringsperioden 2021-2027 inden for intelligent specialisering | |||||||||||||||
label / sv | label / sv | ||||||||||||||
Södra Muntenia stöd för förberedelse av projekt som finansieras från programperioden 2021–2027 inom området smart specialisering | |||||||||||||||
description / bg | description / bg | ||||||||||||||
Проект Q3099660 в Румъния | |||||||||||||||
description / hr | description / hr | ||||||||||||||
Projekt Q3099660 u Rumunjskoj | |||||||||||||||
description / hu | description / hu | ||||||||||||||
Projekt Q3099660 Romániában | |||||||||||||||
description / cs | description / cs | ||||||||||||||
Projekt Q3099660 v Rumunsku | |||||||||||||||
description / da | description / da | ||||||||||||||
Projekt Q3099660 i Rumænien | |||||||||||||||
description / nl | description / nl | ||||||||||||||
Project Q3099660 in Roemenië | |||||||||||||||
description / et | description / et | ||||||||||||||
Projekt Q3099660 Rumeenias | |||||||||||||||
description / fi | description / fi | ||||||||||||||
Projekti Q3099660 Romaniassa | |||||||||||||||
description / fr | description / fr | ||||||||||||||
Projet Q3099660 en Roumanie | |||||||||||||||
description / de | description / de | ||||||||||||||
Projekt Q3099660 in Rumänien | |||||||||||||||
description / el | description / el | ||||||||||||||
Έργο Q3099660 στη Ρουμανία | |||||||||||||||
description / ga | description / ga | ||||||||||||||
Tionscadal Q3099660 sa Rómáin | |||||||||||||||
description / it | description / it | ||||||||||||||
Progetto Q3099660 in Romania | |||||||||||||||
description / lv | description / lv | ||||||||||||||
Projekts Q3099660 Rumānijā | |||||||||||||||
description / lt | description / lt | ||||||||||||||
Projektas Q3099660 Rumunijoje | |||||||||||||||
description / mt | description / mt | ||||||||||||||
Proġett Q3099660 fir-Rumanija | |||||||||||||||
description / pl | description / pl | ||||||||||||||
Projekt Q3099660 w Rumunii | |||||||||||||||
description / pt | description / pt | ||||||||||||||
Projeto Q3099660 na Romênia | |||||||||||||||
description / ro | description / ro | ||||||||||||||
Proiectul Q3099660 în România | |||||||||||||||
description / sk | description / sk | ||||||||||||||
Projekt Q3099660 v Rumunsku | |||||||||||||||
description / sl | description / sl | ||||||||||||||
Projekt Q3099660 v Romuniji | |||||||||||||||
description / es | description / es | ||||||||||||||
Proyecto Q3099660 en Rumania | |||||||||||||||
description / sv | description / sv | ||||||||||||||
Projekt Q3099660 i Rumänien | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 1,305,920.42 Romanian Leu / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 261,184.084 Euro / rank | |||||||||||||||
Property / EU contribution: 261,184.084 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 261,184.084 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 1,536,376.96 Romanian Leu / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 307,275.392 Euro / rank | |||||||||||||||
Property / budget: 307,275.392 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 307,275.392 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 0.85 percent / rank | |||||||||||||||
Property / end time | |||||||||||||||
| |||||||||||||||
Property / end time: 31 December 2021 / rank | |||||||||||||||
Property / contained in Local Administrative Unit | |||||||||||||||
Property / contained in Local Administrative Unit: Perieti / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary | |||||||||||||||
Preparing mature projects for the 2021-2027 programming period at South Muntenia level. (English) | |||||||||||||||
Property / summary: Preparing mature projects for the 2021-2027 programming period at South Muntenia level. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Preparing mature projects for the 2021-2027 programming period at South Muntenia level. (English) / qualifier | |||||||||||||||
point in time: 16 September 2021
| |||||||||||||||
Property / summary: Preparing mature projects for the 2021-2027 programming period at South Muntenia level. (English) / qualifier | |||||||||||||||
readability score: 0.0009591927473779
| |||||||||||||||
Property / summary | |||||||||||||||
Préparer des projets matures pour la période de programmation 2021-2027 au niveau de la Muntenia du Sud. (French) | |||||||||||||||
Property / summary: Préparer des projets matures pour la période de programmation 2021-2027 au niveau de la Muntenia du Sud. (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Préparer des projets matures pour la période de programmation 2021-2027 au niveau de la Muntenia du Sud. (French) / qualifier | |||||||||||||||
point in time: 27 November 2021
| |||||||||||||||
Property / summary | |||||||||||||||
Vorbereitung ausgereifter Projekte für den Programmplanungszeitraum 2021-2027 auf Süd-Müntenia-Ebene. (German) | |||||||||||||||
Property / summary: Vorbereitung ausgereifter Projekte für den Programmplanungszeitraum 2021-2027 auf Süd-Müntenia-Ebene. (German) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Vorbereitung ausgereifter Projekte für den Programmplanungszeitraum 2021-2027 auf Süd-Müntenia-Ebene. (German) / qualifier | |||||||||||||||
point in time: 1 December 2021
| |||||||||||||||
Property / summary | |||||||||||||||
Voorbereiding van volwassen projecten voor de programmeringsperiode 2021-2027 op het niveau van Zuid-Müntenia. (Dutch) | |||||||||||||||
Property / summary: Voorbereiding van volwassen projecten voor de programmeringsperiode 2021-2027 op het niveau van Zuid-Müntenia. (Dutch) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Voorbereiding van volwassen projecten voor de programmeringsperiode 2021-2027 op het niveau van Zuid-Müntenia. (Dutch) / qualifier | |||||||||||||||
point in time: 6 December 2021
| |||||||||||||||
Property / summary | |||||||||||||||
Preparare progetti maturi per il periodo di programmazione 2021-2027 a livello della Muntenia meridionale. (Italian) | |||||||||||||||
Property / summary: Preparare progetti maturi per il periodo di programmazione 2021-2027 a livello della Muntenia meridionale. (Italian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Preparare progetti maturi per il periodo di programmazione 2021-2027 a livello della Muntenia meridionale. (Italian) / qualifier | |||||||||||||||
point in time: 12 January 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Preparación de proyectos maduros para el período de programación 2021-2027 a nivel de Muntenia meridional. (Spanish) | |||||||||||||||
Property / summary: Preparación de proyectos maduros para el período de programación 2021-2027 a nivel de Muntenia meridional. (Spanish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Preparación de proyectos maduros para el período de programación 2021-2027 a nivel de Muntenia meridional. (Spanish) / qualifier | |||||||||||||||
point in time: 13 January 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Valmis projektide ettevalmistamine programmitöö perioodiks 2021–2027 Lõuna-Muntenia tasandil. (Estonian) | |||||||||||||||
Property / summary: Valmis projektide ettevalmistamine programmitöö perioodiks 2021–2027 Lõuna-Muntenia tasandil. (Estonian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Valmis projektide ettevalmistamine programmitöö perioodiks 2021–2027 Lõuna-Muntenia tasandil. (Estonian) / qualifier | |||||||||||||||
point in time: 3 August 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Parengti brandžius 2021–2027 m. programavimo laikotarpio projektus Pietų Muntenijos lygmeniu. (Lithuanian) | |||||||||||||||
Property / summary: Parengti brandžius 2021–2027 m. programavimo laikotarpio projektus Pietų Muntenijos lygmeniu. (Lithuanian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Parengti brandžius 2021–2027 m. programavimo laikotarpio projektus Pietų Muntenijos lygmeniu. (Lithuanian) / qualifier | |||||||||||||||
point in time: 3 August 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Priprema zrelih projekata za programsko razdoblje 2021. – 2027. na razini Južne Muntenije. (Croatian) | |||||||||||||||
Property / summary: Priprema zrelih projekata za programsko razdoblje 2021. – 2027. na razini Južne Muntenije. (Croatian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Priprema zrelih projekata za programsko razdoblje 2021. – 2027. na razini Južne Muntenije. (Croatian) / qualifier | |||||||||||||||
point in time: 3 August 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Προετοιμασία ώριμων έργων για την περίοδο προγραμματισμού 2021-2027 σε επίπεδο Νότιας Μουντενίας. (Greek) | |||||||||||||||
Property / summary: Προετοιμασία ώριμων έργων για την περίοδο προγραμματισμού 2021-2027 σε επίπεδο Νότιας Μουντενίας. (Greek) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Προετοιμασία ώριμων έργων για την περίοδο προγραμματισμού 2021-2027 σε επίπεδο Νότιας Μουντενίας. (Greek) / qualifier | |||||||||||||||
point in time: 3 August 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Príprava vyspelých projektov na programové obdobie 2021 – 2027 na úrovni Južnej Munténie. (Slovak) | |||||||||||||||
Property / summary: Príprava vyspelých projektov na programové obdobie 2021 – 2027 na úrovni Južnej Munténie. (Slovak) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Príprava vyspelých projektov na programové obdobie 2021 – 2027 na úrovni Južnej Munténie. (Slovak) / qualifier | |||||||||||||||
point in time: 3 August 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Valmistellaan valmiita hankkeita ohjelmakaudelle 2021–2027 Etelä-Muntenian tasolla. (Finnish) | |||||||||||||||
Property / summary: Valmistellaan valmiita hankkeita ohjelmakaudelle 2021–2027 Etelä-Muntenian tasolla. (Finnish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Valmistellaan valmiita hankkeita ohjelmakaudelle 2021–2027 Etelä-Muntenian tasolla. (Finnish) / qualifier | |||||||||||||||
point in time: 3 August 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Przygotowanie dojrzałych projektów na okres programowania 2021-2027 na poziomie South Muntenia. (Polish) | |||||||||||||||
Property / summary: Przygotowanie dojrzałych projektów na okres programowania 2021-2027 na poziomie South Muntenia. (Polish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Przygotowanie dojrzałych projektów na okres programowania 2021-2027 na poziomie South Muntenia. (Polish) / qualifier | |||||||||||||||
point in time: 3 August 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Érett projektek előkészítése a 2021–2027-es programozási időszakra Dél-Muntenia szintjén. (Hungarian) | |||||||||||||||
Property / summary: Érett projektek előkészítése a 2021–2027-es programozási időszakra Dél-Muntenia szintjén. (Hungarian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Érett projektek előkészítése a 2021–2027-es programozási időszakra Dél-Muntenia szintjén. (Hungarian) / qualifier | |||||||||||||||
point in time: 3 August 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Příprava vyspělých projektů na programové období 2021–2027 na úrovni Jižní Muntenia. (Czech) | |||||||||||||||
Property / summary: Příprava vyspělých projektů na programové období 2021–2027 na úrovni Jižní Muntenia. (Czech) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Příprava vyspělých projektů na programové období 2021–2027 na úrovni Jižní Muntenia. (Czech) / qualifier | |||||||||||||||
point in time: 3 August 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Sagatavot nobriedušus projektus 2021.–2027. gada plānošanas periodam Dienvidmuntēnijā. (Latvian) | |||||||||||||||
Property / summary: Sagatavot nobriedušus projektus 2021.–2027. gada plānošanas periodam Dienvidmuntēnijā. (Latvian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Sagatavot nobriedušus projektus 2021.–2027. gada plānošanas periodam Dienvidmuntēnijā. (Latvian) / qualifier | |||||||||||||||
point in time: 3 August 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Tionscadail aibí a ullmhú don chlárthréimhse 2021-2027 ar leibhéal South Muntenia. (Irish) | |||||||||||||||
Property / summary: Tionscadail aibí a ullmhú don chlárthréimhse 2021-2027 ar leibhéal South Muntenia. (Irish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Tionscadail aibí a ullmhú don chlárthréimhse 2021-2027 ar leibhéal South Muntenia. (Irish) / qualifier | |||||||||||||||
point in time: 3 August 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Priprava zrelih projektov za programsko obdobje 2021–2027 na ravni Južne Muntenije. (Slovenian) | |||||||||||||||
Property / summary: Priprava zrelih projektov za programsko obdobje 2021–2027 na ravni Južne Muntenije. (Slovenian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Priprava zrelih projektov za programsko obdobje 2021–2027 na ravni Južne Muntenije. (Slovenian) / qualifier | |||||||||||||||
point in time: 3 August 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Подготовка на проекти в напреднала фаза за програмния период 2021—2027 г. на равнище Южна Мунтения. (Bulgarian) | |||||||||||||||
Property / summary: Подготовка на проекти в напреднала фаза за програмния период 2021—2027 г. на равнище Южна Мунтения. (Bulgarian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Подготовка на проекти в напреднала фаза за програмния период 2021—2027 г. на равнище Южна Мунтения. (Bulgarian) / qualifier | |||||||||||||||
point in time: 3 August 2022
| |||||||||||||||
Property / summary | |||||||||||||||
It-tħejjija ta’ proġetti maturi għall-perjodu ta’ programmazzjoni 2021–2027 fil-livell tal-Muntenia tan-Nofsinhar. (Maltese) | |||||||||||||||
Property / summary: It-tħejjija ta’ proġetti maturi għall-perjodu ta’ programmazzjoni 2021–2027 fil-livell tal-Muntenia tan-Nofsinhar. (Maltese) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: It-tħejjija ta’ proġetti maturi għall-perjodu ta’ programmazzjoni 2021–2027 fil-livell tal-Muntenia tan-Nofsinhar. (Maltese) / qualifier | |||||||||||||||
point in time: 3 August 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Preparação de projetos maduros para o período de programação de 2021-2027 a nível da MUNTNIA DO SUL. (Portuguese) | |||||||||||||||
Property / summary: Preparação de projetos maduros para o período de programação de 2021-2027 a nível da MUNTNIA DO SUL. (Portuguese) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Preparação de projetos maduros para o período de programação de 2021-2027 a nível da MUNTNIA DO SUL. (Portuguese) / qualifier | |||||||||||||||
point in time: 3 August 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Forberedelse af modne projekter for programmeringsperioden 2021-2027 på Syd Muntenia-niveau. (Danish) | |||||||||||||||
Property / summary: Forberedelse af modne projekter for programmeringsperioden 2021-2027 på Syd Muntenia-niveau. (Danish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Forberedelse af modne projekter for programmeringsperioden 2021-2027 på Syd Muntenia-niveau. (Danish) / qualifier | |||||||||||||||
point in time: 3 August 2022
| |||||||||||||||
Property / summary | |||||||||||||||
Förbereda mogna projekt för programperioden 2021–2027 på södra Muntenia-nivå. (Swedish) | |||||||||||||||
Property / summary: Förbereda mogna projekt för programperioden 2021–2027 på södra Muntenia-nivå. (Swedish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Förbereda mogna projekt för programperioden 2021–2027 på södra Muntenia-nivå. (Swedish) / qualifier | |||||||||||||||
point in time: 3 August 2022
| |||||||||||||||
Property / intervention field | |||||||||||||||
Property / intervention field: Preparation, implementation, monitoring and inspection / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / beneficiary | |||||||||||||||
Property / beneficiary: Q2757245 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / coordinate location | |||||||||||||||
43°53'45.28"N, 25°57'56.92"E
| |||||||||||||||
Property / coordinate location: 43°53'45.28"N, 25°57'56.92"E / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / coordinate location | |||||||||||||||
44°18'54.68"N, 27°8'20.47"E
| |||||||||||||||
Property / coordinate location: 44°18'54.68"N, 27°8'20.47"E / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / coordinate location | |||||||||||||||
44°55'36.62"N, 25°28'59.20"E
| |||||||||||||||
Property / coordinate location: 44°55'36.62"N, 25°28'59.20"E / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / coordinate location | |||||||||||||||
44°35'45.89"N, 27°12'5.90"E
| |||||||||||||||
Property / coordinate location: 44°35'45.89"N, 27°12'5.90"E / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / coordinate location | |||||||||||||||
45°6'31.50"N, 26°2'15.43"E
| |||||||||||||||
Property / coordinate location: 45°6'31.50"N, 26°2'15.43"E / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / contained in NUTS | |||||||||||||||
Property / contained in NUTS: Dâmboviţa / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / contained in NUTS | |||||||||||||||
Property / contained in NUTS: Giurgiu / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / contained in NUTS | |||||||||||||||
Property / contained in NUTS: Călăraşi / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / contained in NUTS | |||||||||||||||
Property / contained in NUTS: Ialomiţa / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / contained in NUTS | |||||||||||||||
Property / contained in NUTS: Prahova / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / end time | |||||||||||||||
31 December 2022
| |||||||||||||||
Property / end time: 31 December 2022 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
1,022,844.7 Romanian Leu
| |||||||||||||||
Property / budget: 1,022,844.7 Romanian Leu / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
204,568.9375 Euro
| |||||||||||||||
Property / budget: 204,568.9375 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
869,418.0 Romanian Leu
| |||||||||||||||
Property / EU contribution: 869,418.0 Romanian Leu / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
173,883.6 Euro
| |||||||||||||||
Property / EU contribution: 173,883.6 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / co-financing rate | |||||||||||||||
85.0000004888327600 percent
| |||||||||||||||
Property / co-financing rate: 85.0000004888327600 percent / rank | |||||||||||||||
Normal rank |
Latest revision as of 09:47, 9 October 2024
Project Q3099660 in Romania
Language | Label | Description | Also known as |
---|---|---|---|
English | South Muntenia support for the preparation of projects financed from the 2021-2027 programming period in the field of smart specialisation |
Project Q3099660 in Romania |
Statements
869,418.0 Romanian Leu
0 references
173,883.6 Euro
0 references
1,022,844.7 Romanian Leu
0 references
204,568.9375 Euro
0 references
85.0000004888327600 percent
0 references
1 September 2020
0 references
31 December 2022
0 references
AGENTIA PENTRU DEZVOLTARE REGIONALA SUD MUNTENIA
0 references
Pregătirea de proiecte mature pentru perioada de programare 2021-2027 la nivelul regiunii Sud Muntenia. (Romanian)
0 references
Preparing mature projects for the 2021-2027 programming period at South Muntenia level. (English)
16 September 2021
0.0009591927473779
0 references
Préparer des projets matures pour la période de programmation 2021-2027 au niveau de la Muntenia du Sud. (French)
27 November 2021
0 references
Vorbereitung ausgereifter Projekte für den Programmplanungszeitraum 2021-2027 auf Süd-Müntenia-Ebene. (German)
1 December 2021
0 references
Voorbereiding van volwassen projecten voor de programmeringsperiode 2021-2027 op het niveau van Zuid-Müntenia. (Dutch)
6 December 2021
0 references
Preparare progetti maturi per il periodo di programmazione 2021-2027 a livello della Muntenia meridionale. (Italian)
12 January 2022
0 references
Preparación de proyectos maduros para el período de programación 2021-2027 a nivel de Muntenia meridional. (Spanish)
13 January 2022
0 references
Valmis projektide ettevalmistamine programmitöö perioodiks 2021–2027 Lõuna-Muntenia tasandil. (Estonian)
3 August 2022
0 references
Parengti brandžius 2021–2027 m. programavimo laikotarpio projektus Pietų Muntenijos lygmeniu. (Lithuanian)
3 August 2022
0 references
Priprema zrelih projekata za programsko razdoblje 2021. – 2027. na razini Južne Muntenije. (Croatian)
3 August 2022
0 references
Προετοιμασία ώριμων έργων για την περίοδο προγραμματισμού 2021-2027 σε επίπεδο Νότιας Μουντενίας. (Greek)
3 August 2022
0 references
Príprava vyspelých projektov na programové obdobie 2021 – 2027 na úrovni Južnej Munténie. (Slovak)
3 August 2022
0 references
Valmistellaan valmiita hankkeita ohjelmakaudelle 2021–2027 Etelä-Muntenian tasolla. (Finnish)
3 August 2022
0 references
Przygotowanie dojrzałych projektów na okres programowania 2021-2027 na poziomie South Muntenia. (Polish)
3 August 2022
0 references
Érett projektek előkészítése a 2021–2027-es programozási időszakra Dél-Muntenia szintjén. (Hungarian)
3 August 2022
0 references
Příprava vyspělých projektů na programové období 2021–2027 na úrovni Jižní Muntenia. (Czech)
3 August 2022
0 references
Sagatavot nobriedušus projektus 2021.–2027. gada plānošanas periodam Dienvidmuntēnijā. (Latvian)
3 August 2022
0 references
Tionscadail aibí a ullmhú don chlárthréimhse 2021-2027 ar leibhéal South Muntenia. (Irish)
3 August 2022
0 references
Priprava zrelih projektov za programsko obdobje 2021–2027 na ravni Južne Muntenije. (Slovenian)
3 August 2022
0 references
Подготовка на проекти в напреднала фаза за програмния период 2021—2027 г. на равнище Южна Мунтения. (Bulgarian)
3 August 2022
0 references
It-tħejjija ta’ proġetti maturi għall-perjodu ta’ programmazzjoni 2021–2027 fil-livell tal-Muntenia tan-Nofsinhar. (Maltese)
3 August 2022
0 references
Preparação de projetos maduros para o período de programação de 2021-2027 a nível da MUNTNIA DO SUL. (Portuguese)
3 August 2022
0 references
Forberedelse af modne projekter for programmeringsperioden 2021-2027 på Syd Muntenia-niveau. (Danish)
3 August 2022
0 references
Förbereda mogna projekt för programperioden 2021–2027 på södra Muntenia-nivå. (Swedish)
3 August 2022
0 references
Judeţul Călăraşi, Romania
0 references
Judeţul Prahova, Romania
0 references
Judeţul Ialomiţa, Romania
0 references
Judeţul Giurgiu, Romania
0 references
Judeţul Dâmboviţa, Romania
0 references
Identifiers
141141
0 references