The use of the international wall crossing at the Danube in a place of arrival at 1314 rkm (Q2734689): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
||
Property / beneficiary | |||
Property / beneficiary: Q2762518 / rank | |||
Normal rank |
Revision as of 14:30, 21 June 2021
Project Q2734689 in Croatia
Language | Label | Description | Also known as |
---|---|---|---|
English | The use of the international wall crossing at the Danube in a place of arrival at 1314 rkm |
Project Q2734689 in Croatia |
Statements
40,984,634.62 Croatian kuna
0 references
48,217,217.21 Croatian kuna
0 references
85.0 percent
0 references
1 October 2020
0 references
31 December 2023
0 references
Ministarstvo mora, prometa i infrastrukture
0 references
10000
0 references
Projekt se nalazi u RH, Vukovarsko-srijemska županija, naselje Opatovac, a odnosi se na izgradnju zimovnika za plovila na rijeci Dunav.Cilj projekta je povećanje stupnja sigurnosti plovidbe na predmetnoj dionici rijeke Dunav kroz omogućavanje plovilima sklanjanje za vrijeme pojave ledostaja/ledohoda na plovnim putovima ili neke druge izvanredne situacije uslijed koje dolazi do prekida plovidbe.Izgradnja zimovnika obuhvaća izgradnju obalnih građevina, privezne opreme, pomoćnih građevina i uređenje akvatorija. Ukupna vrijednost prihvatljivih troškova projekta iznosi 48.217.217,21 HRK. (Croatian)
0 references
The project is located in the Republic of Croatia, Vukovar-Syrmia County, the settlement of Okotraac, which concerns the construction of the wall of vessels on the Danube River. the aim of the project is to increase the degree of safety of navigation on the relevant stretch of the Danube River, by enabling the vessels to sklanyard during leachinadequate/leaxia on waterways or some other emergency situations that lead to an interruption by the construction of coastal buildings, mooring equipment, accessory structures and aquatorship construction. The total eligible cost of the project is HRK 48.217.217,21. (English)
3 June 2021
0 references
Identifiers
KK.07.3.1.05.0001
0 references