Modernisation of the streets on which public transport runs and the development of pedestrian infrastructure in Slatina (Q2744174): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
||
Property / beneficiary | |||
Q2754516 (Deleted Item) | |||
Property / beneficiary: Q2754516 (Deleted Item) / rank | |||
Normal rank |
Revision as of 12:01, 21 June 2021
Project Q2744174 in Romania
Language | Label | Description | Also known as |
---|---|---|---|
English | Modernisation of the streets on which public transport runs and the development of pedestrian infrastructure in Slatina |
Project Q2744174 in Romania |
Statements
3,669,707.22 Romanian Leu
0 references
4,317,302.59 Romanian Leu
0 references
0.85 percent
0 references
1 November 2017
0 references
31 December 2021
0 references
UAT Municipiul Slatina
0 references
Q2754516 (Deleted Item)
0 references
Proiectul propus spre finantare are ca obiect modernizarea strazilor pe care circula transp public din Slatina: str Vailor si Vintila Voda, carosabil+trotuare. Transp public este ingreunat de starea infrastructurii, avand ca efect deplasarea la viteze inferioare celei de flux liber.Modernizarea va avea ca efect eficientizarea serviciului de transp public si reducerea emisiilor GES generate de acesta si cresterea sigurantei rutiere. Vor fi reabilitate 2 strazi pe care circula tranportul public. Lungimea pistelor/ traseelor pentru biciclete construite/ modernizate/ extinse (ml) - 1971,15 ml; Suprafata traseelor/ sonelor pietonale/ semi pietonale construite/ modernizate/ extinse - 3075 mp. (Romanian)
0 references
The project proposed for financing aims to modernise the streets on which public transp circulates in Slatina: str Valleys and Vintila Voda, road and trotuation. Public Transp is hampered by the condition of the infrastructure, having the effect of moving at lower speeds than free flow.Modernisation will have the effect of streamlining the public transp service and reducing the GHG emissions generated by it and increasing road safety. 2 streets of public transport will be rehabilitated. Length of bicycle tracks/tracks constructed/modernised/extended (ml) – 1971,15 ml; Surface of pedestrian routes/sons/steps built/modernised/extended – 3075 sqm. (English)
17 June 2021
0 references
OT, Slatina
0 references
Identifiers
127366
0 references