Q2744613 (Q2744613): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): Improving the infrastructure of a pre-university education unit, the school with the I-IV classes in the city of Ineu, as a result of modernisation, rehabilitation and endowment activities. It is estimated that at the end of the project, about 436 pupils (preparatory, primary and secondary classes) of which 192 from disadvantaged backgrounds will benefit from an educational unit modernised to European quality standards., translated_summary)
Property / summary
 
Improving the infrastructure of a pre-university education unit, the school with the I-IV classes in the city of Ineu, as a result of modernisation, rehabilitation and endowment activities. It is estimated that at the end of the project, about 436 pupils (preparatory, primary and secondary classes) of which 192 from disadvantaged backgrounds will benefit from an educational unit modernised to European quality standards. (English)
Property / summary: Improving the infrastructure of a pre-university education unit, the school with the I-IV classes in the city of Ineu, as a result of modernisation, rehabilitation and endowment activities. It is estimated that at the end of the project, about 436 pupils (preparatory, primary and secondary classes) of which 192 from disadvantaged backgrounds will benefit from an educational unit modernised to European quality standards. (English) / rank
 
Normal rank
Property / summary: Improving the infrastructure of a pre-university education unit, the school with the I-IV classes in the city of Ineu, as a result of modernisation, rehabilitation and endowment activities. It is estimated that at the end of the project, about 436 pupils (preparatory, primary and secondary classes) of which 192 from disadvantaged backgrounds will benefit from an educational unit modernised to European quality standards. (English) / qualifier
 
point in time: 17 June 2021
Timestamp+2021-06-17T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:58, 17 June 2021

Project Q2744613 in Romania
Language Label Description Also known as
English
No label defined
Project Q2744613 in Romania

    Statements

    0 references
    0 references
    4,900,470.94 Romanian Leu
    0 references
    980,094.1880000001 Euro
    15 June 2021
    0 references
    5,765,259.9 Romanian Leu
    0 references
    1,153,051.9800000002 Euro
    15 June 2021
    0 references
    0.85 percent
    0 references
    25 September 2020
    0 references
    30 June 2023
    0 references
    UAT Orașul Ineu
    0 references

    46°25'33.56"N, 21°50'30.08"E
    0 references
    Imbunatatirea infrastructurii unei unitati de invatamant preuniversitar, scoala cu clasele I-IV din orasul Ineu, ca urmare a unor activitati de modernizare, reabilitare si dotare . Se estimeaza ca la sfarsitul proiectului, un numar de cca 436 de elevi (clase pregatitoare, primare si gimnaziale) din care 192 provenind din medii defavorizate, vor beneficia de o unitate de invatamant modernizata la standarde europene de calitate. (Romanian)
    0 references
    Improving the infrastructure of a pre-university education unit, the school with the I-IV classes in the city of Ineu, as a result of modernisation, rehabilitation and endowment activities. It is estimated that at the end of the project, about 436 pupils (preparatory, primary and secondary classes) of which 192 from disadvantaged backgrounds will benefit from an educational unit modernised to European quality standards. (English)
    17 June 2021
    0 references
    Arad, Ineu
    0 references

    Identifiers

    123803
    0 references