Q2734931 (Q2734931): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The project provides public infrastructure that is needed as a prerequisite for the development of all driving forces, starting with a business, tourist and all safety and life benefits for all. The centre of the centre will, directly and in the long term, lead to a reduction in the social dependency and to the strengthening of the demographic picture of the area. The scoreboard indicators are: 1.652 m roads, 3 circling, 3 152 m pedestrian lanes...)
Property / summary
 
The project provides public infrastructure that is needed as a prerequisite for the development of all driving forces, starting with a business, tourist and all safety and life benefits for all. The centre of the centre will, directly and in the long term, lead to a reduction in the social dependency and to the strengthening of the demographic picture of the area. The scoreboard indicators are: 1.652 m roads, 3 circling, 3 152 m pedestrian lanes, 1.803 m bicycle lanes, 217 parking spaces, 81 public lighting, precipitation drainage, planted 245 seedlings of indigenous trees and 554 wild shrubs. (English)
Property / summary: The project provides public infrastructure that is needed as a prerequisite for the development of all driving forces, starting with a business, tourist and all safety and life benefits for all. The centre of the centre will, directly and in the long term, lead to a reduction in the social dependency and to the strengthening of the demographic picture of the area. The scoreboard indicators are: 1.652 m roads, 3 circling, 3 152 m pedestrian lanes, 1.803 m bicycle lanes, 217 parking spaces, 81 public lighting, precipitation drainage, planted 245 seedlings of indigenous trees and 554 wild shrubs. (English) / rank
 
Normal rank
Property / summary: The project provides public infrastructure that is needed as a prerequisite for the development of all driving forces, starting with a business, tourist and all safety and life benefits for all. The centre of the centre will, directly and in the long term, lead to a reduction in the social dependency and to the strengthening of the demographic picture of the area. The scoreboard indicators are: 1.652 m roads, 3 circling, 3 152 m pedestrian lanes, 1.803 m bicycle lanes, 217 parking spaces, 81 public lighting, precipitation drainage, planted 245 seedlings of indigenous trees and 554 wild shrubs. (English) / qualifier
 
point in time: 3 June 2021
Timestamp+2021-06-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:27, 3 June 2021

Project Q2734931 in Croatia
Language Label Description Also known as
English
No label defined
Project Q2734931 in Croatia

    Statements

    0 references
    20,570,733.93 Croatian kuna
    0 references
    2,674,195.41 Euro
    2 June 2021
    0 references
    24,200,863.45 Croatian kuna
    0 references
    3,146,112.25 Euro
    2 June 2021
    0 references
    85.0 percent
    0 references
    14 November 2017
    0 references
    1 October 2019
    0 references
    Općina Darda
    0 references

    45°40'29.60"N, 18°38'31.96"E
    0 references
    31326
    0 references
    Projekt osigurava javnu infrastrukturu koja je potrebna kao preduvjet razvoja svih pokretačkih sila, počevši od poduzetničke, turističke, pa sve dosame sigurnosti i ugodnog života za sve građane. Uređenje centra neposredno i dugoročno dovest će do smanjenja socijalne ovisnosti i jačanja demografske slike područja. Pokazatelji su: 1.652m ceste, 3 kružna toka, 3152m pješačke staze, 1.803m biciklističke staze, 217 parkirnih mjesta, 81 stup javne rasvjete, oborinska odvodnja, zasađeno 245 sadnica autohtonog drveća i 554 sadnice autohtonog grmlja. (Croatian)
    0 references
    The project provides public infrastructure that is needed as a prerequisite for the development of all driving forces, starting with a business, tourist and all safety and life benefits for all. The centre of the centre will, directly and in the long term, lead to a reduction in the social dependency and to the strengthening of the demographic picture of the area. The scoreboard indicators are: 1.652 m roads, 3 circling, 3 152 m pedestrian lanes, 1.803 m bicycle lanes, 217 parking spaces, 81 public lighting, precipitation drainage, planted 245 seedlings of indigenous trees and 554 wild shrubs. (English)
    3 June 2021
    0 references

    Identifiers

    KK.08.2.1.07.0001
    0 references