Construction of a bridge mainland — Chyzh Island on connecting roads — 2nd design phase (Q2734680): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The aim of the project is to build a bridge between the Ascension Island and the accession roads. The construction of bridge and connecting roads will lead to speeding up traffic flows, reducing congestion and removing the bottleneck, reducing harmful emissions, and increasing the attractiveness of the tourism region. The planned duration of the project is 58 months and will be implemented in 1.3.2015-31.12.2019. The total value of the project w...) |
(Changed label, description and/or aliases in en: translated_label) |
||
label / en | label / en | ||
Construction of a bridge mainland — Chyzh Island on connecting roads — 2nd design phase |
Revision as of 13:20, 3 June 2021
Project Q2734680 in Croatia
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a bridge mainland — Chyzh Island on connecting roads — 2nd design phase |
Project Q2734680 in Croatia |
Statements
100,061,319.32 Croatian kuna
0 references
117,719,199.21 Croatian kuna
0 references
85.0 percent
0 references
11 June 2018
0 references
30 June 2020
0 references
Hrvatske ceste društvo s ograničenom odgovornošću, za upravljanje, građenje i održavanje državnih cesta
0 references
21220
0 references
Cilj projekta je izgradnja mosta kopno-Otok Čiovo sa pristupnim cestama. Izgradnja mosta i spojnih cesta dovest će do ubrzanja prometnih tokova, smanjenja zagušenosti i uklanjanja uskog grla, smanjenja štetnih emisija i povećane atraktivnosti regije u turističkom smislu. Planirano trajanje projekta je 58 mjeseci te će se provoditi u razdoblju 1.3.2015. do 31.12.2019. Ukupna vrijednost projekta procijenjena je na 137.084.613,68 kn. Prihvatljivi troškovi su 117.719.199,21 kn, od čega se 100.061.319,33 kn planira sufinancirati iz EFRR, a 17.657.879,88 kn iz Državnog proračuna RH. Neprihvatljivi izdaci iznose 19.365.414.47 kn i odnose se na iznos koji prelazi iznos predviđen za gradnju mosta i druge troškove radova koji nisu odobreni UDBS-om. (Croatian)
0 references
The aim of the project is to build a bridge between the Ascension Island and the accession roads. The construction of bridge and connecting roads will lead to speeding up traffic flows, reducing congestion and removing the bottleneck, reducing harmful emissions, and increasing the attractiveness of the tourism region. The planned duration of the project is 58 months and will be implemented in 1.3.2015-31.12.2019. The total value of the project was estimated at HRK 137.084.613,68. The eligible costs are HRK 117.719.199,21, of which HRK 100.061.319,33 is to be co-financed from the ERDF and HRK 17.657.879,88 from the Croatian State Budget. Ineligible expenditure is HRK 19.365.414.47 and refers to an amount exceeding the amount foreseen for the construction of a bridge and other costs of works not authorised to the UDBS. (English)
3 June 2021