Q2733447 (Q2733447): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The project provides for the renovation of the building envelope comprising three construction measures to improve the thermal protective envelope (thermal insulation of the external walls, thermal insulation of the ceiling to an unheated attic and the replacement of external joinery), the two engine engineering measures (reconstruction of the natural gas gas circuit and the reconstruction of the existing central heating hot-water boilers — repl...)
Property / summary
 
The project provides for the renovation of the building envelope comprising three construction measures to improve the thermal protective envelope (thermal insulation of the external walls, thermal insulation of the ceiling to an unheated attic and the replacement of external joinery), the two engine engineering measures (reconstruction of the natural gas gas circuit and the reconstruction of the existing central heating hot-water boilers — replacement of gas boiler by condensing unit and the installation of a thermos-governor) with a view to reducing energy input and harmful CO2 emissions. (English)
Property / summary: The project provides for the renovation of the building envelope comprising three construction measures to improve the thermal protective envelope (thermal insulation of the external walls, thermal insulation of the ceiling to an unheated attic and the replacement of external joinery), the two engine engineering measures (reconstruction of the natural gas gas circuit and the reconstruction of the existing central heating hot-water boilers — replacement of gas boiler by condensing unit and the installation of a thermos-governor) with a view to reducing energy input and harmful CO2 emissions. (English) / rank
 
Normal rank
Property / summary: The project provides for the renovation of the building envelope comprising three construction measures to improve the thermal protective envelope (thermal insulation of the external walls, thermal insulation of the ceiling to an unheated attic and the replacement of external joinery), the two engine engineering measures (reconstruction of the natural gas gas circuit and the reconstruction of the existing central heating hot-water boilers — replacement of gas boiler by condensing unit and the installation of a thermos-governor) with a view to reducing energy input and harmful CO2 emissions. (English) / qualifier
 
point in time: 3 June 2021
Timestamp+2021-06-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:58, 3 June 2021

Project Q2733447 in Croatia
Language Label Description Also known as
English
No label defined
Project Q2733447 in Croatia

    Statements

    0 references
    190,080.2 Croatian kuna
    0 references
    24,710.43 Euro
    2 June 2021
    0 references
    327,896.25 Croatian kuna
    0 references
    42,626.51 Euro
    2 June 2021
    0 references
    85.0 percent
    0 references
    19 April 2019
    0 references
    19 April 2021
    0 references
    VIROVITIČKO-PODRAVSKA ŽUPANIJA
    0 references

    45°49'53.94"N, 17°23'7.94"E
    0 references
    33000
    0 references
    Projektom je predviđena rekonstrukcija ovojnice zgrade koja obuhvaća tri građevinske mjere za poboljšanje toplinske zaštitne ovojnice (toplinsku izolaciju vanjskih zidova, toplinsku izolaciju stropa prema negrijanog tavana i zamjenu vanjske stolarije), dvije strojarske mjere (rekonstrukciju plinske instalacije zemnog plina i rekonstrukciju postojeće instalacije centralnog toplovodnog radijatorskog grijanja - zamjena plinskog bojlera kondenzacijskim uređajem i ugradnja termo ventila s regulatorom protoka) a sve u cilju smanjenja utroška energije i štetnih emisija CO2. (Croatian)
    0 references
    The project provides for the renovation of the building envelope comprising three construction measures to improve the thermal protective envelope (thermal insulation of the external walls, thermal insulation of the ceiling to an unheated attic and the replacement of external joinery), the two engine engineering measures (reconstruction of the natural gas gas circuit and the reconstruction of the existing central heating hot-water boilers — replacement of gas boiler by condensing unit and the installation of a thermos-governor) with a view to reducing energy input and harmful CO2 emissions. (English)
    3 June 2021
    0 references

    Identifiers

    KK.04.2.1.04.0798
    0 references