Energy renovation on the street building Vinogradska 25 in Zagreb (Q2733268): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): Energy renovation of the building and implementation of project activities will save by 63.5 % the heating energy needed for heating. To achieve this saving, provision is made for the thermal insulation of all roof panels, thermal insulation installed on the backyard with the design and setting of new windows and the performance of the thermal plaster instead of the existing ones on the street corner. Existing climate units, both external and...) |
(Created claim: summary (P836): Energy renovation of the building and implementation of project activities will save by 63.5 % the heating energy needed for heating. To achieve this saving, provision is made for the thermal insulation of all roof panels, thermal insulation installed on the backyard with the design and setting of new windows and the performance of the thermal plaster instead of the existing ones on the street corner. Existing climate units, both external and in...) |
||||||||||||||
Property / summary | |||||||||||||||
Energy renovation of the building and implementation of project activities will save by 63.5 % the heating energy needed for heating. To achieve this saving, provision is made for the thermal insulation of all roof panels, thermal insulation installed on the backyard with the design and setting of new windows and the performance of the thermal plaster instead of the existing ones on the street corner. Existing climate units, both external and internal, will be replaced by a new, improved performance. Existing fluorescent lights will be replaced by LED lighting. (English) | |||||||||||||||
Property / summary: Energy renovation of the building and implementation of project activities will save by 63.5 % the heating energy needed for heating. To achieve this saving, provision is made for the thermal insulation of all roof panels, thermal insulation installed on the backyard with the design and setting of new windows and the performance of the thermal plaster instead of the existing ones on the street corner. Existing climate units, both external and internal, will be replaced by a new, improved performance. Existing fluorescent lights will be replaced by LED lighting. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Energy renovation of the building and implementation of project activities will save by 63.5 % the heating energy needed for heating. To achieve this saving, provision is made for the thermal insulation of all roof panels, thermal insulation installed on the backyard with the design and setting of new windows and the performance of the thermal plaster instead of the existing ones on the street corner. Existing climate units, both external and internal, will be replaced by a new, improved performance. Existing fluorescent lights will be replaced by LED lighting. (English) / qualifier | |||||||||||||||
point in time: 3 June 2021
|
Revision as of 12:57, 3 June 2021
Project Q2733268 in Croatia
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy renovation on the street building Vinogradska 25 in Zagreb |
Project Q2733268 in Croatia |
Statements
1,181,003.05 Croatian kuna
0 references
2,251,056.1 Croatian kuna
0 references
85.0 percent
0 references
4 February 2019
0 references
4 February 2021
0 references
Ministarstvo prostornoga uređenja, graditeljstva i državne imovine
0 references
10000
0 references
Energetskom obnovom zgrade i provedbom projektnih aktivnosti, ostvarit će se ušteda potrebne toplinske energije za grijanje od 63,5%. Za ostvarenje navedene uštede predviđeno je izvesti toplinsku izolaciju svih krovnih ploha, postavu toplinske izolacije na dvorišnom pročelju s izradom i postavom novih prozora te izvedbom toplinske žbuke umjesto postojeće na uličnom pročelju. Postojeće klimatske jedinice, vanjske i unutarnje, zamijenit će se novim , poboljšanih karakteristika. Postojeća rasvjeta fluorescentnim tijelima zamijenit će se LED rasvjetom. (Croatian)
0 references
Energy renovation of the building and implementation of project activities will save by 63.5 % the heating energy needed for heating. To achieve this saving, provision is made for the thermal insulation of all roof panels, thermal insulation installed on the backyard with the design and setting of new windows and the performance of the thermal plaster instead of the existing ones on the street corner. Existing climate units, both external and internal, will be replaced by a new, improved performance. Existing fluorescent lights will be replaced by LED lighting. (English)
3 June 2021
0 references
Identifiers
KK.04.2.1.04.0567
0 references