Q2733275 (Q2733275): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): Energy renovation of the building and implementation of project activities will save by 65 % the heating energy needed for heating. It is foreseen to renovate the complete envelope (all 4 facades and sides of the roof) with a view to achieving this saving, a separation between the hot water and the introduction of a new heat pump system is foreseen. Existing fluorescent lights will be replaced by LED lighting., translated_summary)
Property / summary
 
Energy renovation of the building and implementation of project activities will save by 65 % the heating energy needed for heating. It is foreseen to renovate the complete envelope (all 4 facades and sides of the roof) with a view to achieving this saving, a separation between the hot water and the introduction of a new heat pump system is foreseen. Existing fluorescent lights will be replaced by LED lighting. (English)
Property / summary: Energy renovation of the building and implementation of project activities will save by 65 % the heating energy needed for heating. It is foreseen to renovate the complete envelope (all 4 facades and sides of the roof) with a view to achieving this saving, a separation between the hot water and the introduction of a new heat pump system is foreseen. Existing fluorescent lights will be replaced by LED lighting. (English) / rank
 
Normal rank
Property / summary: Energy renovation of the building and implementation of project activities will save by 65 % the heating energy needed for heating. It is foreseen to renovate the complete envelope (all 4 facades and sides of the roof) with a view to achieving this saving, a separation between the hot water and the introduction of a new heat pump system is foreseen. Existing fluorescent lights will be replaced by LED lighting. (English) / qualifier
 
point in time: 3 June 2021
Timestamp+2021-06-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:56, 3 June 2021

Project Q2733275 in Croatia
Language Label Description Also known as
English
No label defined
Project Q2733275 in Croatia

    Statements

    0 references
    804,588.79 Croatian kuna
    0 references
    104,596.54 Euro
    2 June 2021
    0 references
    2,471,017.96 Croatian kuna
    0 references
    321,232.33 Euro
    2 June 2021
    0 references
    85.0 percent
    0 references
    4 February 2019
    0 references
    4 February 2021
    0 references
    Ministarstvo prostornoga uređenja, graditeljstva i državne imovine
    0 references

    45°50'5.46"N, 15°58'14.74"E
    0 references
    10000
    0 references
    Energetskom obnovom zgrade i provedbom projektnih aktivnosti, ostvarit će se ušteda potrebne toplinske energije za grijanje od 65%. Za ostvarenje navedene uštede predviđena je obnova kompletne ovojnice (sva 4 pročelja i ravni krov).Strojarskim projektom predviđeno je odvajanje sa toplovoda i uvođenje novog sustava dizalice topline. Postojeća rasvjeta fluorescentnim tijelima zamijenit će se LED rasvjetom. (Croatian)
    0 references
    Energy renovation of the building and implementation of project activities will save by 65 % the heating energy needed for heating. It is foreseen to renovate the complete envelope (all 4 facades and sides of the roof) with a view to achieving this saving, a separation between the hot water and the introduction of a new heat pump system is foreseen. Existing fluorescent lights will be replaced by LED lighting. (English)
    3 June 2021
    0 references

    Identifiers

    KK.04.2.1.04.0574
    0 references