Q2733244 (Q2733244): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The project focuses on the energy renovation of the building and school sports hall of the Hovese Primary School, at the address of the Radića 2/A, Hdošan, which will achieve energy savings, i.e. the energy consumption of the facilities will be reduced. The works at the main project require thermal energy for heating the buildings of the ŠKOLE and DVOSS as a functional unit compared to the current state of play, reduced by 121 539.13 kWh/a and b...)
Property / summary
 
The project focuses on the energy renovation of the building and school sports hall of the Hovese Primary School, at the address of the Radića 2/A, Hdošan, which will achieve energy savings, i.e. the energy consumption of the facilities will be reduced. The works at the main project require thermal energy for heating the buildings of the ŠKOLE and DVOSS as a functional unit compared to the current state of play, reduced by 121 539.13 kWh/a and by 54.81 % compared to the annual heating energy consumption before implementation of the above mentioned measures, which will increase the quality and comfort of the presence in the facility with positive environmental impacts. the target group of projects consists of employees and students of the primary school ‘Hoošjean’ and other educational institutions’ representatives. (English)
Property / summary: The project focuses on the energy renovation of the building and school sports hall of the Hovese Primary School, at the address of the Radića 2/A, Hdošan, which will achieve energy savings, i.e. the energy consumption of the facilities will be reduced. The works at the main project require thermal energy for heating the buildings of the ŠKOLE and DVOSS as a functional unit compared to the current state of play, reduced by 121 539.13 kWh/a and by 54.81 % compared to the annual heating energy consumption before implementation of the above mentioned measures, which will increase the quality and comfort of the presence in the facility with positive environmental impacts. the target group of projects consists of employees and students of the primary school ‘Hoošjean’ and other educational institutions’ representatives. (English) / rank
 
Normal rank
Property / summary: The project focuses on the energy renovation of the building and school sports hall of the Hovese Primary School, at the address of the Radića 2/A, Hdošan, which will achieve energy savings, i.e. the energy consumption of the facilities will be reduced. The works at the main project require thermal energy for heating the buildings of the ŠKOLE and DVOSS as a functional unit compared to the current state of play, reduced by 121 539.13 kWh/a and by 54.81 % compared to the annual heating energy consumption before implementation of the above mentioned measures, which will increase the quality and comfort of the presence in the facility with positive environmental impacts. the target group of projects consists of employees and students of the primary school ‘Hoošjean’ and other educational institutions’ representatives. (English) / qualifier
 
point in time: 3 June 2021
Timestamp+2021-06-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:56, 3 June 2021

Project Q2733244 in Croatia
Language Label Description Also known as
English
No label defined
Project Q2733244 in Croatia

    Statements

    0 references
    2,994,140.0 Croatian kuna
    0 references
    389,238.2 Euro
    2 June 2021
    0 references
    4,982,940.66 Croatian kuna
    0 references
    647,782.29 Euro
    2 June 2021
    0 references
    85.0 percent
    0 references
    19 November 2018
    0 references
    19 November 2020
    0 references
    Osnovna škola Hodošan
    0 references

    44°52'40.58"N, 15°14'51.47"E
    0 references
    40320
    0 references
    Projekt je usmjeren na energetsku obnovu zgrade i školske sportske dvorane Osnovne škole Hodošan na adresi Braće Radića 2/A, Hodošan, kojom će se postići energetske uštede, tj. smanjiti će se potrošnja energije u objektima. Radovima iz glavnog projekta potrebna toplinska energija za grijanje zgrade ŠKOLE I DVORANE kao funkcionalne cjeline u odnosu na postojeće stanje smanjuje se za 121.539,13 kWh/a, odnosno za 54,81% u odnosu na godišnju potrošnju energije za grijanje prije provedbe navedenih mjera, čime će se povećati kvaliteta i ugodnost boravka u objektu uz pozitivan utjecaj na okoliš.Ciljnu skupinu projekta čine zaposlenici i učenici Osnovne škole Hodošan te predstavnici drugih odgojno-obrazovnih ustanova. (Croatian)
    0 references
    The project focuses on the energy renovation of the building and school sports hall of the Hovese Primary School, at the address of the Radića 2/A, Hdošan, which will achieve energy savings, i.e. the energy consumption of the facilities will be reduced. The works at the main project require thermal energy for heating the buildings of the ŠKOLE and DVOSS as a functional unit compared to the current state of play, reduced by 121 539.13 kWh/a and by 54.81 % compared to the annual heating energy consumption before implementation of the above mentioned measures, which will increase the quality and comfort of the presence in the facility with positive environmental impacts. the target group of projects consists of employees and students of the primary school ‘Hoošjean’ and other educational institutions’ representatives. (English)
    3 June 2021
    0 references

    Identifiers

    KK.04.2.1.04.0533
    0 references