Energy renovation on the General County Hospital of the Požega Hospital in 107, Požega (Q2733027): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The general county hospital (the ‘Požega’) building is three buildings composed of five sections connecting interconnections and includes the building of the pathology in the definition of the energy functional unit. The buildings have been built in several phases since the 30s and until 1986 years old. The construction method did not meet the modern standards of saving and rational energy use. The energy renovation project will reduce the usefu...)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Energy renovation on the General County Hospital of the Požega Hospital in 107, Požega

Revision as of 12:52, 3 June 2021

Project Q2733027 in Croatia
Language Label Description Also known as
English
Energy renovation on the General County Hospital of the Požega Hospital in 107, Požega
Project Q2733027 in Croatia

    Statements

    0 references
    12,863,797.62 Croatian kuna
    0 references
    1,672,293.69 Euro
    2 June 2021
    0 references
    21,354,220.01 Croatian kuna
    0 references
    2,776,048.6 Euro
    2 June 2021
    0 references
    85.0 percent
    0 references
    9 October 2018
    0 references
    9 October 2020
    0 references
    OPĆA ŽUPANIJSKA BOLNICA POŽEGA
    0 references

    45°20'38.58"N, 17°40'34.25"E
    0 references
    34000
    0 references
    Zgradu Opće županijske bolnice Požega čine tri zgrade sastavljene od pet dijelova koje su međusobno povezane spojnim hodnicima, a pri definiranju energetski funkcionalne cjeline uključena je i zgrada patologije. Zgrade su građene u više faza u razdoblju od 30.-ih godina prošloga stoljeća pa sve do 1986. godine. Način gradnje nije odgovarao suvremenim standardima uštede i racionalnog korištenja energije. Projektom energetske obnove će se građevinskim i elektrotehničkim mjerama smanjiti korisna energija za grijanje za 1.344.585,44 kWh/a (67,04%), a godišnja emisija CO2 smanjit će se za 244.289,77 kg (65,12%). Zgrada će iz energetskog razreda F prijeći u energetski razred B, a Bolnica će svoju financijsku uštedu moći usmjeriti na zdravstvo. (Croatian)
    0 references
    The general county hospital (the ‘Požega’) building is three buildings composed of five sections connecting interconnections and includes the building of the pathology in the definition of the energy functional unit. The buildings have been built in several phases since the 30s and until 1986 years old. The construction method did not meet the modern standards of saving and rational energy use. The energy renovation project will reduce the useful heating energy of 1 344 585.44 kWh/a (67.04 %) for heating in construction and electrical engineering, and reduce annual CO2 emissions by 244 289.77 kg (65.12 %). The building will move from energy class B to energy class B and the Bolnica will be able to focus its financial savings on healthcare. (English)
    3 June 2021
    0 references

    Identifiers

    KK.04.2.1.04.0160
    0 references