SMART GRID PROJECT ON THE ‘MONTEFALCONE’ PRIMARY STATION (Q2017728): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed an Item: Change because item Q2500969 was merged with Q253080)
Property / contained in NUTSProperty / contained in NUTS

Revision as of 08:17, 29 December 2020

Project Q2017728 in Italy
Language Label Description Also known as
English
SMART GRID PROJECT ON THE ‘MONTEFALCONE’ PRIMARY STATION
Project Q2017728 in Italy

    Statements

    0 references
    2,263,639.34 Euro
    0 references
    3,064,108.56 Euro
    0 references
    73.88 percent
    0 references
    26 March 2018
    0 references
    31 December 2020
    0 references
    E-DISTRIBUZIONE SPA
    0 references

    41°19'33.56"N, 15°0'32.62"E
    0 references
    IL PROGETTO COMPRENDE INTERVENTI SIA DI STRUTTURA CHE DI IMPLEMENTAZIONE DELLE FUNZIONALITà SMART GRID. GLI INTERVENTI STRUTTURALI MIRANO A MODIFICARE LA CONFIGURAZIONE DELL'IMPIANTO AL FINE DI MIGLIORARNE LE CONDIZIONI DI ESERCIZIO E LE PRESTAZIONI.IL PROGETTO PREVEDE L'UTILIZZO DI DISPOSITIVI DI ULTIMA GENERAZIONE CHE PERMETTANO LA COMPLETA SMARTIZZAZIONE DELLA CABINA PRIMARIA, DELLE CABINE SECONDARIE E DEI CENTRI SATELLITE SOTTESI. INOLTRE VERRANNO IMPLEMENTATE NUOVE LINEE MT UTILIZZANDO I NUOVI CAVI IN ALLUMINIO E IN ALLUMINIO ELICORD. È PREVISTO ANCHE L'ACQUISTO DI UN NUOVO TRASFORMATORE AFFINCHé VENGA AMPLIATA LA CABINA PRIMARIA.IL PROGETTO SI QUALIFICA COME SMART GRID IN QUANTO PREVEDE L'INSTALLAZIONE DI DISPOSITIVI TECNOLOGICI E DI APPARECCHIATURE INTELLIGENTI FINALIZZATE AD UNA GESTIONE EVOLUTA DELLA RETE ELETTRICA, CON L'OBIETTIVO DI AGEVOLARE L'INCREMENTO DELLA QUOTA DI FABBISOGNO ENERGETICO COPERTO DA GENERAZIONE DISTRIBUITA DA FONTI RINNOVABILI. IN TAL SENSO SI IMPLEMEN (Italian)
    0 references
    THE PROJECT COMPRISES BOTH STRUCTURAL AND OPERATIONAL MEASURES FOR SMART GRIDS. THE AIM OF THE STRUCTURAL MEASURES IS TO CHANGE THE DESIGN OF THE PLANT IN ORDER TO IMPROVE THE CONDITIONS FOR OPERATION AND TO IMPROVE THE DESIGN OF THE INSTALLATION. THE PROJECT ENVISAGES THE USE OF STATE-OF-THE-ART DEVICES ENABLING THE COMPLETE SMARTISATION OF THE PRIMARY CABIN, SECONDARY AND UNDERLYING SATELLITE CENTRES. IN ADDITION, NEW MT LINES WILL BE IMPLEMENTED USING THE NEW ALUMINIUM AND ALUMINIUM WIRE ROPES. THIS WILL ALSO INCLUDE THE PURCHASE OF A NEW PROCESSOR, REFINING THE PROJECT, THE PROJECT QUALIFIES AS SMART GRIDS. IT PROVIDES FOR THE INSTALLATION OF SMART TECHNOLOGY DEVICES AND APPLIANCES FOR THE IMPROVED MANAGEMENT OF THE ELECTRICITY NETWORK, WITH THE AIM OF FACILITATING THE INCREASE IN THE SHARE OF ENERGY DEMAND COVERED BY GENERATION FROM RENEWABLE SOURCES. TO THIS END, PLEASE MAKE SURE THAT YOU DO NOT HESITATE TO CONTACT US. (English)
    0 references

    Identifiers

    F68D18000000006
    0 references