SMART GRID/NEW PRIMARY CABIN GAS PROJECT (Q2017704): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed an Item: Change because item Q2500931 was merged with Q252825)
Property / contained in NUTSProperty / contained in NUTS

Revision as of 07:59, 29 December 2020

Project Q2017704 in Italy
Language Label Description Also known as
English
SMART GRID/NEW PRIMARY CABIN GAS PROJECT
Project Q2017704 in Italy

    Statements

    0 references
    2,105,532.78 Euro
    0 references
    2,850,092.28 Euro
    0 references
    73.88 percent
    0 references
    23 May 2018
    0 references
    31 December 2020
    0 references
    E-DISTRIBUZIONE SPA
    0 references

    40°25'22.84"N, 15°44'5.53"E
    0 references
    IL PROGETTO COMPRENDE INTERVENTI SIA DI STRUTTURA CHE DI IMPLEMENTAZIONE DELLE FUNZIONALITà SMART GRID. GLI INTERVENTI STRUTTURALI MIRANO A MODIFICARE LA CONFIGURAZIONE DELL'IMPIANTO AL FINE DI MIGLIORARNE LE CONDIZIONI DI ESERCIZIO E LE PRESTAZIONI.IL PROGETTO PREVEDE L'UTILIZZO DI DISPOSITIVI DI ULTIMA GENERAZIONE CHE PERMETTANO LA SMARTIZZAZIONE DELLA CABINA PRIMARIA, DELLE CABINE SECONDARIE E DEI CENTRI SATELLITE SOTTESI. INOLTRE VERRANNO SOSTITUITE LE LINEE MT TRAMITE NUOVI CAVI IN ALLUMINIO E IN ALLUMINIO ELICORD. È PREVISTO ANCHE IL POTENZIAMENTO DELLA CABINA PRIMARIA TRAMITE L'AUMENTO DELLA CAPACITà DI TRASFORMAZIONE DELLA STESSA.IL PROGETTO SI QUALIFICA COME SMART GRID IN QUANTO PREVEDE L'INSTALLAZIONE DI DISPOSITIVI TECNOLOGICI E DI APPARECCHIATURE INTELLIGENTI FINALIZZATE AD UNA GESTIONE EVOLUTA DELLA RETE ELETTRICA, CON L'OBIETTIVO DI AGEVOLARE L'INCREMENTO DELLA QUOTA DI FABBISOGNO ENERGETICO COPERTO DA GENERAZIONE DISTRIBUITA DA FONTI RINNOVABILI. IN TAL SENSO SI IMPLE (Italian)
    0 references
    THE PROJECT COMPRISES BOTH STRUCTURAL AND OPERATIONAL MEASURES FOR SMART GRIDS. THE PURPOSE OF THE STRUCTURAL MEASURES IS TO CHANGE THE DESIGN OF THE INSTALLATION IN ORDER TO IMPROVE THE CONDITIONS FOR OPERATION AND TO IMPROVE THE DESIGN OF THE INSTALLATION. THE DESIGN OF THE INSTALLATION SHALL INCLUDE THE USE OF LAST GENERATION DEVICES ENABLING SMARTIFICATIONS OF THE PRIMARY CAB, OF THE SECONDARY CABS AND OF THE UNDERLYING SATELLITE CENTRES. IN ADDITION, THE MT LINES WILL BE REPLACED WITH NEW ALUMINIUM AND ALUMINIUM WIRE ROPES. THE PROJECT WILL ALSO COVER THE UPGRADING OF THE PRIMARY CABIN BY INCREASING THE CAPACITY OF THE PROJECT. THE PROJECT QUALIFIES AS SMART GRIDS IN SO FAR AS IT INVOLVES THE INSTALLATION OF SMART TECHNOLOGICAL EQUIPMENT AND APPLIANCES FOR THE IMPROVED MANAGEMENT OF THE ELECTRICITY NETWORK, WITH THE AIM OF FACILITATING THE INCREASE IN THE SHARE OF ENERGY DEMAND COVERED BY GENERATION FROM RENEWABLE SOURCES. IN THIS REGARD, THERE IS AN IMPLE. (English)
    0 references

    Identifiers

    F38D18000030006
    0 references