SCHOOL CELESTINO ROSELLI (BELMONTE IN SSABINA) (Q2035119): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed an Item: Change because item Q2500758 was merged with Q259733)
Property / contained in NUTSProperty / contained in NUTS

Revision as of 04:04, 29 December 2020

Project Q2035119 in Italy
Language Label Description Also known as
English
SCHOOL CELESTINO ROSELLI (BELMONTE IN SSABINA)
Project Q2035119 in Italy

    Statements

    0 references
    111,800.0 Euro
    0 references
    223,600.0 Euro
    0 references
    50.0 percent
    0 references
    27 September 2017
    0 references
    13 December 2018
    0 references
    COMUNE DI BELMONTE IN SABINA
    0 references
    0 references

    42°19'3.54"N, 12°53'34.01"E
    0 references
    SOSTITUZIONE CALDAIA ESISTENTE CON CALDAIE MODULARI A CONDENSAZIONE,INSTALLAZIONE TESTE TERMOSTATICHE E ADEGUAMENTO CORPI RADIANTI,SOSTITUZIONE CORPI ILLUMINANTI ESISTENTI CON CORPI ILLUMINANTI LED,ISOLAMENTO TERMICO A CAPPOTTO, SOSTITUZIIONE INFISSI (Italian)
    0 references
    EXISTING BOILER REPLACEMENT WITH MODULAR CONDENSING BOILERS (English)
    0 references

    Identifiers

    G13D17000290002
    0 references