Sewerage and WWTP Řepiště, 1st stage (Q60352): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed an Item: Change because item Q214247 was merged with Q4870) |
||
Property / contained in NUTS | Property / contained in NUTS | ||
Revision as of 22:12, 27 December 2020
Project Q60352 in Czech Republic
Language | Label | Description | Also known as |
---|---|---|---|
English | Sewerage and WWTP Řepiště, 1st stage |
Project Q60352 in Czech Republic |
Statements
31,144,879.45 Czech koruna
0 references
48,854,712.86 Czech koruna
0 references
63.75 percent
0 references
3 September 2018
0 references
31 December 2020
0 references
Obec Řepiště
0 references
73932
0 references
Projekt řeší vybudování gravitační splaškové kanalizace v délce 4393.52 m v centrální části obce Řepiště. Kanalizace bude vedena místními komunikacemi, podél silnice II/477, volným terénem a před napojením kanalizace na ČOV je kanalizace vedena podél řeky Datyňka. Jedná se o odkanalizování cca 139 rodinných domů, základní školy, školky, obecního úřadu, budovy TJ Řepiště a společenského centra. Výstavba ČOV bude realizována na parcele číslo: 1531/3. Bude vybudováno 713.37 m gravitačních přípojek. (Czech)
0 references
The project solves the construction of gravitational sewage sewage in the length of 4393.52 m in the central part of the village Řepiště. The sewerage will be guided by local roads, along road II/477, free terrain and before the sewerage system is connected to the WWTP, the sewerage system is led along the river Datyňka. It is a drainage of about 139 family houses, primary schools, kindergartens, municipal office, TJ Řepiště building and social centre. The construction of the WWTP will be carried out on parcel number: IT’S 1531/3. 713,37 metres of gravity connections will be built. (English)
23 October 2020
0 references
Identifiers
CZ.05.1.30/0.0/0.0/16_042/0004724
0 references