Sewerage and WWTP Řepiště, 1st stage (Q60352): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed an Item: Change because item Q214247 was merged with Q4870)
Property / contained in NUTSProperty / contained in NUTS

Revision as of 22:12, 27 December 2020

Project Q60352 in Czech Republic
Language Label Description Also known as
English
Sewerage and WWTP Řepiště, 1st stage
Project Q60352 in Czech Republic

    Statements

    0 references
    31,144,879.45 Czech koruna
    0 references
    1,245,795.18 Euro
    10 January 2020
    0 references
    48,854,712.86 Czech koruna
    0 references
    1,954,188.51 Euro
    10 January 2020
    0 references
    63.75 percent
    0 references
    3 September 2018
    0 references
    31 December 2020
    0 references
    Obec Řepiště
    0 references
    0 references
    0 references

    49°45'31.14"N, 18°19'30.25"E
    0 references
    73932
    0 references
    Projekt řeší vybudování gravitační splaškové kanalizace v délce 4393.52 m v centrální části obce Řepiště. Kanalizace bude vedena místními komunikacemi, podél silnice II/477, volným terénem a před napojením kanalizace na ČOV je kanalizace vedena podél řeky Datyňka. Jedná se o odkanalizování cca 139 rodinných domů, základní školy, školky, obecního úřadu, budovy TJ Řepiště a společenského centra. Výstavba ČOV bude realizována na parcele číslo: 1531/3. Bude vybudováno 713.37 m gravitačních přípojek. (Czech)
    0 references
    The project solves the construction of gravitational sewage sewage in the length of 4393.52 m in the central part of the village Řepiště. The sewerage will be guided by local roads, along road II/477, free terrain and before the sewerage system is connected to the WWTP, the sewerage system is led along the river Datyňka. It is a drainage of about 139 family houses, primary schools, kindergartens, municipal office, TJ Řepiště building and social centre. The construction of the WWTP will be carried out on parcel number: IT’S 1531/3. 713,37 metres of gravity connections will be built. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.1.30/0.0/0.0/16_042/0004724
    0 references