II/377 Rájec – Jestřebí, bridge 377-008 (Q74892): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed an Item: Change because item Q214251 was merged with Q4868)
Property / contained in NUTSProperty / contained in NUTS

Revision as of 20:22, 27 December 2020

Project Q74892 in Czech Republic
Language Label Description Also known as
English
II/377 Rájec – Jestřebí, bridge 377-008
Project Q74892 in Czech Republic

    Statements

    0 references
    48,992,259.33 Czech koruna
    0 references
    1,959,690.37 Euro
    10 January 2020
    0 references
    57,844,466.06 Czech koruna
    0 references
    2,313,778.64 Euro
    10 January 2020
    0 references
    84.7 percent
    0 references
    1 April 2017
    0 references
    31 August 2018
    0 references
    31 August 2018
    0 references
    Správa a údržba silnic Jihomoravského kraje, příspěvková organizace kraje
    0 references

    49°12'8.6"N, 16°36'28.4"E
    0 references
    60200
    0 references
    Předmětem projektu je rekonstrukce silnice II/377 v extravilánovém úseku od směrového oblouku před železničním mostem po most přes řeku Svitavu. Celková délka rekonstruovaných silnic je 0,641 km, z toho úsek silnice II/377 je 0,606 km. Součástí projektu je i rekonstrukce okružní křižovatky v místě křížení se silnicí II/374, resp. III/37433 a navazujících úseků těchto silnic v délce 0,023 km, resp. 0,012 km. Projekt řeší i rekonstrukci mostu ev.č. 377-008. (Czech)
    0 references
    The object of the project is the reconstruction of road II/377 in an extravaganza section from the directional arch in front of the railway bridge to the bridge over the river Svitavu. The total length of reconstructed roads is 0.641 km, of which the section of road II/377 is 0.606 km. Part of the project is the reconstruction of the circular junction at the point of crossing with road II/374 and III/37433 and subsequent sections of these roads in the length of 0.023 km or 0.012 km respectively. The project also deals with reconstruction of the bridge no. 377-008. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.06.1.42/0.0/0.0/15_002/0001981
    0 references