Building modifications and insulation of the building ADAST ADAMOV Chateau (Q16168): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed an Item: Change because item Q214251 was merged with Q4868) |
||
Property / contained in NUTS | Property / contained in NUTS | ||
Revision as of 19:43, 27 December 2020
Project Q16168 in Czech Republic
Language | Label | Description | Also known as |
---|---|---|---|
English | Building modifications and insulation of the building ADAST ADAMOV Chateau |
Project Q16168 in Czech Republic |
Statements
4,563,729.03 Czech koruna
0 references
11,409,322.58 Czech koruna
0 references
40.0 percent
0 references
30 September 2020
0 references
Adast Engineering, s.r.o.
0 references
67904
0 references
Investorovým záměrem je provést energeticky úsporné úpravy budovy tak, aby vyhovovala současným tepelně-technickým požadavkům a normám. Dojde k zateplení objektu včetně výměny nevyhovujících otvorových výplní, instalaci nového zdroje tepla včetně nové otopné soustavy, výměně elektroinstalace spolu s osazením úsporného osvětlení a k dalším stavebním úpravám vedoucím ke snížení energetické náročnosti objektu. a. (Czech)
0 references
The investor’s intention is to make energy-saving modifications of the building to meet current thermal-technical requirements and standards. The building will be insulated, including replacement of unsatisfactory hole fillings, installation of new heat source including new heating system, exchange of electrical installation together with installation of energy-saving lighting and other building modifications leading to reduced energy performance of the object. a. (English)
22 October 2020
0 references
Identifiers
CZ.01.3.10/0.0/0.0/17_101/0012966
0 references