Reducing the energy performance of the school catering facility at TGM Primary School in Svitavy (Q72954): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed an Item: Change because item Q214256 was merged with Q4866)
Property / contained in NUTSProperty / contained in NUTS

Revision as of 19:30, 27 December 2020

Project Q72954 in Czech Republic
Language Label Description Also known as
English
Reducing the energy performance of the school catering facility at TGM Primary School in Svitavy
Project Q72954 in Czech Republic

    Statements

    0 references
    1,648,158.0 Czech koruna
    0 references
    65,926.32 Euro
    10 January 2020
    0 references
    4,120,395.0 Czech koruna
    0 references
    164,815.80 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    16 May 2018
    0 references
    31 October 2017
    0 references
    Město Svitavy
    0 references
    0 references
    0 references

    49°45'24.91"N, 16°28'14.95"E
    0 references
    56802
    0 references
    Předmětem projektu je objekt školního stravování při Základní škole T.G. Masaryka ve Svitavách, který se nachází v KÚ Svitavy - předměstí (760960) na parcele č.p. 35/27, parcelní č. st. 14. Řešený objekt má 1 NP + 1 PP (sklepní prostory). Nachází se zde kuchyň a jídelna včetně zázemí. Objekt je propojen se základní školou krátkým spojovacím krčkem. V rámci projektu bude řešeno zateplení obvodových stěn objektu, zateplení střešní konstrukce a instalace solárního systému pro ohřev TV. (Czech)
    0 references
    The object of the project is the school catering facility at the T.G. Masaryk Primary School in Svitavy, which is located in KÚ Svitavy – suburb (760960) on plot No. 35/27, parcel no. st. 14. The designed object has 1 NP + 1 PP (basic spaces). There is a kitchen and dining room including facilities. The building is connected to the primary school by a short connecting neck. The project will deal with insulation of the perimeter walls of the building, insulation of the roof structure and installation of solar system for heating TV. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/16_039/0004431
    0 references