Reduction of energy intensity in NAVEL s. r. o. (Q16581): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed an Item: Change because item Q214250 was merged with Q4860) |
||
Property / contained in NUTS | Property / contained in NUTS | ||
Revision as of 15:16, 27 December 2020
Project Q16581 in Czech Republic
Language | Label | Description | Also known as |
---|---|---|---|
English | Reduction of energy intensity in NAVEL s. r. o. |
Project Q16581 in Czech Republic |
Statements
1,013,178.24 Czech koruna
0 references
1,266,472.8 Czech koruna
0 references
80 percent
0 references
1 January 2018
0 references
19 December 2018
0 references
31 December 2018
0 references
NAVEL, spol. s r.o.
0 references
38232
0 references
V rámci projektu bude vybudován fotovoltaický systém v prostorách firmy NAVEL, která sídlí v obci Velešín, kde je i realizace projektu. Firma NAVEL je zařazená mezi malé firmy. FV systém bude umístěn na střechu nově postavené výrobní haly (přístavby). Projekt bude řešený v rámci jedné etapy a bude financován z vlastních prostředků. V plánu je vybudování FV systému a uvedení do provozu během roku 2018. Celková roční výroba FVE je naplánovaná na 20 920 kWh s využitím pro vlastní spotřebu. a. (Czech)
0 references
The project will build a photovoltaic system in the premises of the company NAVEL, which is located in the village Velešín, where the project is also implemented. The company NAVEL is ranked among small companies. The FV system will be placed on the roof of the newly built production hall (ports). The project will be dealt with within one stage and will be financed from its own resources. The plan is to build an FV system and put into operation during 2018. Total annual production of FVE is planned at 20920 kWh using for own consumption. a. (English)
22 October 2020
0 references
Identifiers
CZ.01.3.10/0.0/0.0/17_138/0011493
0 references