SCHOOL NOT LATER THAN SCHOOL (Q304142): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Removed claim: summary (P836): THE GENERAL AIM OF PROGETTOFORNRE FOR SUPPORT MEASURES AND SCHOOL RECOVERY FOR THOSE CHILDREN WHO HAVE PROVEN IRREGULIT OF THE GAPS IN THE GAPS IN BASIC SKILLS GAPS IN THE CURRICULUM, AND THE FREQUENT REJECTION OF THE PROJECT WILL BE BASED ON THE USE OF TWO OPERATIONAL GUIDELINES BETWEEN TWO OPERATEDAL GUIDELINES, ON THE ONE HAND, THE PROVISION OF TRAINING COURSES DIRECTLY LINKED TO THE THEME OF LEARNING AND THE SCHOOL FOR THE RECOVERY OF BASI...)
Property / summary
THE GENERAL AIM OF PROGETTOFORNRE FOR SUPPORT MEASURES AND SCHOOL RECOVERY FOR THOSE CHILDREN WHO HAVE PROVEN IRREGULIT OF THE GAPS IN THE GAPS IN BASIC SKILLS GAPS IN THE CURRICULUM, AND THE FREQUENT REJECTION OF THE PROJECT WILL BE BASED ON THE USE OF TWO OPERATIONAL GUIDELINES BETWEEN TWO OPERATEDAL GUIDELINES, ON THE ONE HAND, THE PROVISION OF TRAINING COURSES DIRECTLY LINKED TO THE THEME OF LEARNING AND THE SCHOOL FOR THE RECOVERY OF BASIC SKILLS, AND, ON THE OTHER HAND, A PROPOSAL TO AMPLIFY THE SERVICES PROVIDED BY THOSE GI ACTIVE ON THE TERRITORY. THE STRONG INTEGRATION AND INTERCONNECTION OF THESE TWO AREAS OF WORK GIVES INNOVATION TO THE PROJECT. (English)
 
Property / summary: THE GENERAL AIM OF PROGETTOFORNRE FOR SUPPORT MEASURES AND SCHOOL RECOVERY FOR THOSE CHILDREN WHO HAVE PROVEN IRREGULIT OF THE GAPS IN THE GAPS IN BASIC SKILLS GAPS IN THE CURRICULUM, AND THE FREQUENT REJECTION OF THE PROJECT WILL BE BASED ON THE USE OF TWO OPERATIONAL GUIDELINES BETWEEN TWO OPERATEDAL GUIDELINES, ON THE ONE HAND, THE PROVISION OF TRAINING COURSES DIRECTLY LINKED TO THE THEME OF LEARNING AND THE SCHOOL FOR THE RECOVERY OF BASIC SKILLS, AND, ON THE OTHER HAND, A PROPOSAL TO AMPLIFY THE SERVICES PROVIDED BY THOSE GI ACTIVE ON THE TERRITORY. THE STRONG INTEGRATION AND INTERCONNECTION OF THESE TWO AREAS OF WORK GIVES INNOVATION TO THE PROJECT. (English) / rank
Normal rank
 

Revision as of 11:06, 6 November 2020

Project Q304142 in Italy
Language Label Description Also known as
English
SCHOOL NOT LATER THAN SCHOOL
Project Q304142 in Italy

    Statements

    0 references
    57,696.0 Euro
    0 references
    57,696.0 Euro
    0 references
    100.0 percent
    0 references
    31 August 2017
    0 references
    2 October 2018
    0 references
    ISTITO TECNICO "GUIDO CARLI"
    0 references
    0 references

    41°0'41.08"N, 14°7'29.39"E
    0 references
    OBIETTIVO GENERALE DEL PROGETTOFORNIRE AZIONI DI SUPPORTO E RECUPERO SCOLASTICO PER QUEI MINORI CHE DIMOSTRANO IRREGOLARIT DELLE FREQUENZE CARENZE EO LACUNE NELLAPPRENDIMENTO DELLE COMPETENZE DI BASE RITARDI NEL PERCORSO SCOLASTICO E FREQUENTI BOCCIATURE EO RIPETENZE.IL PROGETTO SI BASA SULLINTERAZIONE FRA DUE DIRETTRICI OPERATIVEDA UN LATO LEROGAZIONE DI OFFERTE FORMATIVE DIRETTAMENTE COLLEGATE AL TEMA DELLAPPRENDIMENTO E DELLA SCUOLA PER IL RECUPERO DELLE COMPETENZE DI BASE DALLALTRO UNA PROPOSTA ASSOCIATIVA CHE AMPLIFICHI LEFFETTO DI QUELLE STESSE OFFERTE DISTINGUENDO IL SERVIZIO EROGATO DA QUELLI GI ATTIVI SUL TERRITORIO.LA FORTE INTEGRAZIONE E INTERCONNESSIONE DI QUESTE DUE PISTE DI LAVORO CONFERISCE UN CARATTERE DI INNOVAZIONE AL PROGETTO. (Italian)
    0 references

    Identifiers