PRIMARY SCHOOL, FRATTA — INSTALLATION FENCING SYSTEMS; REPLACEMENT OF THE BOILER WITH A CONDENSING BOILER; REPLACING ILLUMINATING DEVICES WITH LED TECHNOLOGY. (Q2071875): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 14:56, 2 November 2020

Project Q2071875 in Italy
Language Label Description Also known as
English
PRIMARY SCHOOL, FRATTA — INSTALLATION FENCING SYSTEMS; REPLACEMENT OF THE BOILER WITH A CONDENSING BOILER; REPLACING ILLUMINATING DEVICES WITH LED TECHNOLOGY.
Project Q2071875 in Italy

    Statements

    0 references
    13,416.94 Euro
    0 references
    77,465.77 Euro
    0 references
    17.32 percent
    0 references
    24 March 2017
    0 references
    26 November 2018
    0 references
    2 August 2019
    0 references
    COMUNE DI TODI
    0 references
    0 references
    0 references

    42°46'56.78"N, 12°24'22.54"E
    0 references
    SCUOLA ELEMENTARE PORTA FRATTA- INTERVENTO DI EFFICIENTAMENTO ENERGETICO (Italian)
    0 references
    PRIMARY SCHOOL BRINGS ENERGY EFFICIENCY MEASURES (English)
    0 references

    Identifiers

    J46J17000140007
    0 references