THE GLASS SECTOR TOWARDS TECHNOLOGICAL AND ENERGY INNOVATION (Q2073971): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 14:51, 2 November 2020

Project Q2073971 in Italy
Language Label Description Also known as
English
THE GLASS SECTOR TOWARDS TECHNOLOGICAL AND ENERGY INNOVATION
Project Q2073971 in Italy

    Statements

    0 references
    35,646.75 Euro
    0 references
    71,293.5 Euro
    0 references
    50.0 percent
    0 references
    27 November 2017
    0 references
    20 September 2018
    0 references
    16 July 2018
    0 references
    SEGUSO GIANNI
    0 references
    0 references

    45°26'13.88"N, 12°20'4.52"E
    0 references
    L INTERVENTO PRINCIPALE DEL PROGETTO DELLA STORICA VETRERIA SEGUSO CONSISTE NELLA SOSTITUZIONE DEL FORNO FUSORIO, FONDAMENTALE PER LA LAVORAZIONE DEL VETRO. L ATTUALE FORNO, A TECNOLOGIA OBSOLETA E COMPONENTE ENERGIVORO PRINCIPALE, VIENE SOSTITUITO CON UN FORNO A TECNOLOGIA AVANZATA CON UN MAGGIORE ISOLAMENTO, UN SISTEMA DI RECUPERO DI CALORE PER IL PRERISCALDO DELL ARIA E UN BRUCIATORE OTTIMIZZATO. INOLTRE, VIENE SOSTITUITO L ATTUALE IMPIANTO DI RISCALDAMENTO DEGLI ALTRI LOCALI, BASATO SU POMPE DI CALORE ELETTRICHE E CALDAIA A GAS, CON UN SISTEMA DI TELERISCALDAMENTO CHE VA A RECUPERARE IL CALORE PRODOTTO DAL FORNO, COPRENDO COMPLETAMENTE IL FABBISOGNO. (Italian)
    0 references
    THE MAIN TASK OF THE HISTORICAL PROJECT IS TO REPLACE THE MELTING FURNACE, WHICH IS ESSENTIAL FOR THE PROCESSING OF GLASS. THE CURRENT FURNACE, WITH OBSOLETE TECHNOLOGY AND MAIN ENERGY ENERGY COMPONENT, IS REPLACED BY AN ADVANCED TECHNOLOGY FURNACE WITH GREATER INSULATION, A HEAT RECOVERY SYSTEM FOR AIR HEAT DEFAULT AND AN OPTIMISED BURNER. IN ADDITION, THE CURRENT HEATING SYSTEM OF THE OTHER ROOMS, BASED ON ELECTRIC HEAT PUMPS AND GAS BOILER, IS REPLACED BY A DISTRICT HEATING SYSTEM TO RECOVER THE HEAT PRODUCED FROM THE FURNACE, FULLY COVERING THE NEEDS. (English)
    0 references

    Identifiers

    B72E17002690007
    0 references