(A19_093_2016_0930052_1049) AL.IT.E.E. (Q2066482): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
description / endescription / en
Project in Italy financed by DG Regio
Project Q2066482 in Italy
description / itdescription / it
Progetto in Italia finanziato da DG Regio
Progetto Q2066482 in Italia

Revision as of 14:11, 2 November 2020

Project Q2066482 in Italy
Language Label Description Also known as
English
(A19_093_2016_0930052_1049) AL.IT.E.E.
Project Q2066482 in Italy

    Statements

    0 references
    15,600.0 Euro
    0 references
    31,200.0 Euro
    0 references
    50.0 percent
    0 references
    28 July 2016
    0 references
    7 August 2018
    0 references
    28 July 2018
    0 references
    ALBERGO ITALIA DI NARDI RENZO E C. SNC
    0 references
    0 references
    0 references

    43°27'54.11"N, 11°8'54.02"E
    0 references
    L?INTERVENTO PROPOSTO, SI RIFERISCE ALLA COMPLETA SOSTITUZIONE DELLA STRUTTURA DELLA COPERTURA DELL?EDIFICIO, STRUTTURA IN PRECARIO STATO DI MANUTENZIONE. ATTUALMENTE, IL CORPO DI FABBRICA E COPERTO NELLA MAGGIOR PARTE DA UN TETTO CON STRUTTURA IN LEGNO, TAVELLE IN LATERIZIO E MANTO DI TEGOLE MARSIGLIESI, E IN PARTE DA COPERTURA IN ETERNIT POSTA SU STRUTTURA METALLICA DI MODESTA FATTURA. L?INTERVENTO PROPOSTO SARA QUINDI ARTICOLATO NELLA MANIERA SEGUENTE: 1) CANTIERIZZAZIONE DEL LUOGO DELL?INTERVENTO, CON MONTAGGIO DEL PONTEGGIO ESTERNO, SERVIZI IGIENICI, BARACCHE, GRU A TORRE 2) SMONTAGGIO DELL?ATTUALE STRUTTURA DI COPERTURA, CON CONFERIMENTO A DISCARICA DEI MATERIALI DI RESULTA 3) SMALTIMENTO DI LASTRE DI COPERTURA IN CEMENTO-AMIANTO (ETERNIT), COMPRENSIVO DELLA REDAZIONE DEL PIANO DI LAVORO ALLA ASL COMPETENTE PER ZONA, CON CONFERIMENTO A DISCARICA AUTORIZZATA 4) FORNITURA E POSA IN OPERA DI STRUTTURA METALLICA PORTANTE , OPPORTUNAMENTE FISSATA ALLA MURATURA ESISTENTE 5) FORNITURA E (Italian)
    0 references
    THE PROPOSED INTERVENTION, REFERS TO THE COMPLETE REPLACEMENT OF THE STRUCTURE OF COVER FOR THE BUILDING, WHICH IS IN A PRECARIOUS STATE OF MAINTENANCE. AT PRESENT, THE FACTORY AND COVERED MOST BY A WOODEN STRUCTURE, TAVELLE IN BRICK ROOF AND TILES OF MARSILIESI ROOFING TILES, AND PARTLY BY COVER IN ETERNIT COVER PLACED ON A SMALL METAL INVOICE. THE PROPOSED INTERVENTION WILL THEREFORE BE ARTICULATED IN THE FOLLOWING WAY: (1) CONSTRUCTION OF THE SITE OF THE OPERATION, WITH ASSEMBLY OF THE OUTER SCAFFOLDING, SANITARY FACILITIES, SHAKERS, TOWER CRANES, 2) DISMANTLING OF THE CURRENT COVER STRUCTURE, WITH THE TRANSFER TO LANDFILL OF THE REFERENCE MATERIALS OF 3) DISPOSAL OF COVER SHEETS IN CEMENT ASBESTOS (ETERNIT), INCLUDING THE DRAWING UP OF THE WORK PLAN FOR THE ASL RESPONSIBLE FOR THE AREA, WITH AUTHORISED LANDFILL 4) TO SUPPLY AND LAY DOWN THE METAL FRAME, APPROPRIATELY FIXED TO EXISTING MASONRY 5), AND (English)
    0 references

    Identifiers