(A19_093_2016_0930050_1051) HOTEL LONDON (Q2066480): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 14:11, 2 November 2020

Project Q2066480 in Italy
Language Label Description Also known as
English
(A19_093_2016_0930050_1051) HOTEL LONDON
Project Q2066480 in Italy

    Statements

    0 references
    39,793.59 Euro
    0 references
    79,587.18 Euro
    0 references
    50.0 percent
    0 references
    1 August 2016
    0 references
    1 August 2018
    0 references
    1 December 2018
    0 references
    ALBERGO LONDRA S.P..A
    0 references
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    LA??OBIETTIVO CHE HA ISPIRATO I CRITERI PER LA RIQUALIFICAZIONE ENERGETICA DELLA STRUTTURA SONO STATI QUELLI DI REALIZZARE DEGLI IMPIANTI CHE RIDUCANO AL MASSIMO I CONSUMI ENERGETICI, PUR MANTENENDO ELEVATO LO STANDARD QUALITATIVO DEL SERVIZIO. QUESTI ASPETTI ENERGETICI E LA??ATTENZIONE ALLA??UTILIZZO DI MATERIALI E TECNOLOGIE A??ECOLOGICHEA?? FANNO DI QUESTO SPAZIO UNA PROPOSTA ACCOGLIENTE, STIMOLANTE ED AMBIENTALMENTE SOSTENIBILE. I PRINCIPI FONDANTI DEL SEGUENTE PROGETTO SONO I QUELLI DI 1. CONIUGARE LA MASSIMA FLESSIBILIT? DEGLI IMPIANTI CON IL CONFORT AMBIENTALE 2. LA??UTILIZZO DI TECNOLOGIE GREEN IN GRADO DI BENEFICIARE DI BASSI CONSUMI ENERGETICI E DI AGEVOLAZIONI DI NATURA FINANZIARIA E/O FISCALE. DETTAGLIO DELLE OPERE DI RIQUALIFICAZIONE ED EFFICIENTAMENTO ENERGETICO: 1. RIFACIMENTO DI PARTE DELLA COPERTURA PER UN MAGGIOR ISOLAMENTO TERMICO GRAZIE A MATERIALI LA CUI TRASMITTANZA SIA SUPERIORE AI REQUISITI MINIMI PREVISTI DAL DM 26/06/2015. 2. IMPIANTO PER LA PRODUZIONE DI ACS (Italian)
    0 references
    THE OBJECTIVE WHICH INSPIRED THE CRITERIA FOR THE ENERGY UPGRADING OF THE FACILITY IS TO SET UP INSTALLATIONS THAT MINIMISE ENERGY CONSUMPTION WHILE MAINTAINING HIGH QUALITY OF SERVICE STANDARDS. ENERGY AND? FOCUS?????????????????????????????????????????????????????????????????????????? THEY MAKE THIS AREA A WELCOMING, INSPIRING AND ENVIRONMENTALLY SUSTAINABLE PROPOSAL. THE FOUNDING PRINCIPLES OF THE FOLLOWING PROJECT ARE THOSE OF 1. HOW TO COMBINE THE MAXIM FLESISITILIT? OF INSTALLATIONS WITH ENVIRONMENTAL COMFORT 2. THE USE OF GREEN TECHNOLOGIES THAT CAN BENEFIT FROM THE DUTCH ENERGY CONSUMPTION AND FINANCIAL AND/OR TAX BENEFITS. DETAILS OF THE UPGRADING AND ENERGY EFFICIENCY WORKS: 1 REFURBISHMENT OF PART OF THE COVER FOR GREATER THERMAL INSULATION BY MEANS OF MATERIALS WHOSE TRANSMITTANCE IS GREATER THAN THE MINIMUM REQUIREMENTS LAID DOWN IN MINISTERIAL DECREE NO 26/06/2015. 2 ACS PRODUCTION PLANT (English)
    0 references

    Identifiers