ENERGY EFFICIENCY IN PRE-PRIMARY STATE SCHOOLS IN THE COURSE OF THE CAMPAIGN (Q2072795): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 13:38, 2 November 2020
Project Q2072795 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | ENERGY EFFICIENCY IN PRE-PRIMARY STATE SCHOOLS IN THE COURSE OF THE CAMPAIGN |
Project Q2072795 in Italy |
Statements
137,745.91 Euro
0 references
344,364.77 Euro
0 references
40.0 percent
0 references
1 September 2014
0 references
13 March 2019
0 references
30 September 2018
0 references
COMUNE DI GALLIERA VENETA
0 references
EFFICIENTAMENTO ENERGETICO MEDIANTE COIBENTAZIONE MURATURE PERIMETRALI E SOFFITTI; ELIMINAZIONE PONTI TERMICI; SOSTITUZIONE SERRAMENTI; SOSTITUZIONE PLAFONIERE CON CORPI ILLUMINANTI A LED. (Italian)
0 references
ENERGY EFFICIENCY BY INSULATION OF PERIMETER AND CEILING REQUIREMENTS; THERMAL BRIDGES; REPLACEMENT OF WINDOW FRAMES; EXTENSION OF THE CEILING FOR LIGHTS TO BE USED FOR LED LIGHTING. (English)
0 references
Identifiers
G64H14000530006
0 references