PD SERVICE SRL (Q2074825): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 13:28, 2 November 2020
Project Q2074825 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | PD SERVICE SRL |
Project Q2074825 in Italy |
Statements
75,000.0 Euro
0 references
150,000.0 Euro
0 references
50.0 percent
0 references
8 June 2018
0 references
11 July 2019
0 references
14 December 2018
0 references
P.D. SERVICE SRL
0 references
PER UN RISPARMIO DI APPROVIGIONAMENTO DI ENERGIA ELETTRICA SI INSTALLERA' UN IMPIANTO DI COGENERAZIONE A GAS METANO, CHE SODDISFA IL 100% DEI FABBISOGNI ELETTRICI DI PD SERVICE E DI GASER, CUI PD SERVICE HA AFFITTATO L - IMMOBILE E TUTTI I MACCHINARI PER I TRATTAMENTI GALVANICI, CHE COSTITUISCONO L - ATTIVITA' DELLA GASER. IL CONTRATTO DI AFFITTO PREVEDE IL SODDISFACIMENTO DI TUTTI I FABBISOGNI ENERGETICI DELLA GASER COME SERVIZIO. A GASER VENGONO FORNITI ENERGIA ELETTRICA E METANO PER LE CALDAIE AD ACQUA CALDA SURRISCALDATA; CON IL COGENERATORE LA PD SERVICE FORNIRA' DIRETTAMENTE ACQUA SURRISCALDATA. IL COGENERATORE PRODUCE 467 KW ELETTRICI NETTI, 480 KW TERMICI COME ACQUA CALDA SURRISCALDATA E CONSUMA 1.442 KW TERMICI. VERRA' INOLTRE COSTRUITO UN NUOVO FORNO INNOVATIVO PER LA TEFLONATURA A CALDO DELLA PD SERVICE, INSTALLANDO SUI FUMI DI SCARICO 4 RECUPERATORI FUMI/ARIA E INTEGRANDO NELLO STESSO, ULTERIORI 8 RECUPERI DI CALORE DA 2 DEI FORNI GIA' ESISTENTI. (Italian)
0 references
FOR SAVINGS IN ELECTRICITY SUPPLY SAVINGS, A METHANE GAS COGENERATION PLANT SHALL MEET 100 % OF THE ELECTRICITY NEEDS OF PD SERVICE AND GAVER, WHICH PD SERVICE HAS LEASED THE BUILDING AND ALL THE GALVANIC TREATMENT MACHINERY, WHICH ARE THE ACTIVITIES OF THE GAER. THE LEASE CONTRACT PROVIDES FOR THE FULFILMENT OF ALL GASSER ENERGY NEEDS AS A SERVICE. GASSER IS SUPPLIED WITH ELECTRICITY AND METHANE FOR SUPER-HEATED HOT-WATER BOILERS; UNDER THE COGENERATOR, THE PD SERVICE WILL DIRECTLY SUPPLY SUPER-HEATED WATER. THE CHP PRODUCES 467 KW NET POWER, 480 KW HEATING AS SUPERHEATED HOT WATER AND CONSUMES 1.442 KW HEAT. IN ADDITION, A NEW INNOVATIVE KILN FOR TEFLONDON PD SERVICE, INSTALLING THE 4 EXHAUST/AIR FLUE GAS RECOVERY FURNACE AND INTEGRATING IN THE SAME, AN ADDITIONAL 8 HEAT RECOVERY FROM EXISTING FURNACES IN 2. (English)
0 references
Identifiers
B77B18000120009
0 references