ENNIO LOT — SUBSTITUTION PROCESS AND PREPARATION OF FRAMES AND INSTALLATION OF PV EQUIPMENT (Q2074793): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
||
description / en | description / en | ||
Project in Italy | Project Q2074793 in Italy | ||
description / it | description / it | ||
Progetto in Italia | Progetto Q2074793 in Italia |
Revision as of 13:28, 2 November 2020
Project Q2074793 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | ENNIO LOT — SUBSTITUTION PROCESS AND PREPARATION OF FRAMES AND INSTALLATION OF PV EQUIPMENT |
Project Q2074793 in Italy |
Statements
53,967.0 Euro
0 references
107,934.0 Euro
0 references
50.0 percent
0 references
8 June 2018
0 references
14 December 2018
0 references
ENNIO LOT - S.R.L.
0 references
SOSTITUZIONE DEI MACCHINARI DELLA LINEA DI LAVORAZIONE E PREPARAZIONE DEI TELAI, INSTALLAZIONE IMPIANTO FOTOVOLTAICO DA 137,20 KWP PER AUTOCONSUMO POSIZIONATO IN COPERTURA. (Italian)
0 references
REPLACEMENT OF MACHINES OF THE PROCESSING AND PREPARATION OF FRAMES, 137,20 KWP OF THE PHOTOVOLTAIC SYSTEM FOR SELF-CONSUMPTION LOCATED IN A COVER. (English)
0 references
Identifiers
B17B18000030009
0 references