(10360.14072017.115000060) LOC. CARRAIA (Q2056984): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 12:07, 2 November 2020

Project Q2056984 in Italy
Language Label Description Also known as
English
(10360.14072017.115000060) LOC. CARRAIA
Project Q2056984 in Italy

    Statements

    0 references
    221,440.91 Euro
    0 references
    738,136.34 Euro
    0 references
    30.0 percent
    0 references
    30 March 2018
    0 references
    30 March 2020
    0 references
    16 November 2020
    0 references
    COMUNE DI CALENZANO
    0 references
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    GLI INTERVENTI PREVISTI, FINALIZZATI AL RISPARMIO ENERGETICO, OLTRE A QUELLI EDILI COMPLEMENTARI ED ALTRI DEL COMPLESSO SCOLASTICO SONO I SEGUENTI:- INSTALLAZIONE NUOVA POMPA DI CALORE PER FUNZIONAMENTO IBRIDO CON CALDAIA A METANO ESISTENTE, MODIFICHE SUGLI IMPIANTI DI DISTRIBUZIONE ED EMISSIONE DELL'IMPIANTO DI RISCALDAMENTO ED ALLACCIAMENTI ELETTRICI;- NUOVO SISTEMA DI TELECONTROLLO/TELEGESTIONE, MONITORAGGIO ENERGETICO E DIMMERIZZAZIONE CORPI ILLUMINANTI;- SOSTITUZIONE INFISSI ESISTENTI, CON DEI NUOVI CON DOPPIO VETRO E TELAIO IN ALLUMINIO A TAGLIO TERMICO PER TUTTO IL FABBRICATO;- REALIZZAZIONE DI CAPPOTTO TERMICO ESTERNO PER TUTTO IL FABBRICATO;- INSTALLAZIONE DI FRANGISOLE SU ALCUNE FINESTRE DEL COMPLESSO PER RIDUZIONE SOLEGGIAMENTO INTERNO;- REALIZZAZIONE DI TETTO VENTILATO PER RIDUZIONE SURRISCALDAMENTO ESTIVO NELLA PORZIONE CHE OSPITA LA SCUOLA MATERNA (Italian)
    0 references
    THE MEASURES ENVISAGED, WITH THE AIM OF SAVING ENERGY, IN ADDITION TO THE ADDITIONAL CONSTRUCTION AND OTHER COMPONENTS OF THE SCHOOL COMPLEX, ARE AS FOLLOWS: — NEW HEAT PUMP INSTALLATION FOR HYBRID OPERATION WITH EXISTING METHANE BOILER, CHANGES TO THE HEATING SYSTEM AND THE INSTALLATION OF THE HEATING SYSTEM AND ELECTRICAL CONNECTIONS; — NEW REMOTE MANAGEMENT, ENERGY MONITORING AND DIME SYSTEM; — REPLACEMENT OF EXISTING FIXTURES, WITH NEW, WITH TWO NEW ONES WITH DOUBLE GLASS AND THERMAL CUT ALUMINIUM FRAME FOR THE ENTIRE BUILDING; — INSTALLATION OF EXTERNAL THERMAL COAT OVER THE ENTIRE BUILDING; — ERECTION OF FRANGISOLE ON SOME WINDOWS OF THE COMPLEX FOR INDOOR REDUCTION; — IMPLEMENTATION OF VENTILATED HEATING CEILING FOR SUMMER HEATING IN THE KINDERGARTEN SECTION (English)
    0 references

    Identifiers