(10360.14072017.115000131) EFF. ENER. SC.PRIMARI ‘MARTI’ (Q2057034): Difference between revisions
Jump to navigation
Jump to search
(Created claim: intervention field (P888): Generic productive investment in small and medium–sized enterprises (‘SMEs’) (Q200641), Adding CoI) |
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
||
description / en | description / en | ||
Project in Italy | Project Q2057034 in Italy | ||
description / it | description / it | ||
Progetto in Italia | Progetto Q2057034 in Italia |
Revision as of 11:33, 2 November 2020
Project Q2057034 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | (10360.14072017.115000131) EFF. ENER. SC.PRIMARI ‘MARTI’ |
Project Q2057034 in Italy |
Statements
93,995.51 Euro
0 references
208,878.9 Euro
0 references
45.0 percent
0 references
30 March 2018
0 references
30 March 2020
0 references
16 November 2020
0 references
COMUNE DI MONTOPOLI IN VAL D'ARNO
0 references
L?EDIFICIO IN OGGETTO ? UBICATO IN LOCALIT? MARTI, NEL COMUNE DI MONTOPOLI IN VAL D?ARNO,PIAZZA MARTIRI DELL?INTIFADA, ED ? ATTUALMENTE DESTINATO A PI? ATTIVIT? TRA LE QUALI LA PRINCIPALE ? SEDEDEL PLESSO SCOLASTICO DENOMINATO SCUOLA PRIMARIA DI MARTI.GLI INTERVENTI PROPOSTI SONO:? SOSTITUZIONE DEI VECCHI INFISSI CON NUOVI PI? PERFORMANTI;? INSTALLAZIONE DI SOLARE TERMICO;? SOSTITUZIONE DI CALDAIA A BASAMENTO CON CALDAIA A CONDENSAZIONE.? MESSA IN OPERA VALVOLE TERMOSTATICHE E DETENTORI;? SOSTITUZIONE POMPE DI SPINTA CON ELETTROPOMPE AD INVERTER.CON L?ATTUAZIONE DI TALI INTERVENTI SI HA UN ABBATTIMENTO DEL FABBISOGNO DI ENERGIA PRIMARIAGLOBALE NON RINNOVABILE DI 78,812 KWH/M2ANNO. (Italian)
0 references
L?? LOCATED IN ITS PREMISES? MARTI, IN THE MUNICIPALITY OF MONTOPOLI IN VAL D? ARNO, PIAZZA MARTYRS OF THE INTIFADA, AND? CURRENTLY USED FOR PI? ACTIVIT? AMONG WHICH ARE THE MAIN ONES? DO YOU PROPOSE A SCHOOL SCHEME KNOWN AS THE PRIMARY SCHOOL ON MARTIS.THE PROPOSED ACTIONS ARE: REPLACEMENT OF OLD FRAMES BY NEW ONES? GOOD PERFORMERS; SOLAR THERMAL INSTALLATION; REPLACEMENT OF A BOILER BOX WITH A CONDENSING BOILER? INSTALLATION OF THERMOSTATIC CONTROL VALVES AND KEEPERS; REPLACEMENT PUMPS WITH ELECTRICAL PUMPS USING ELECTRIC PUMPS TO INVERTER.CON L ARE REPLACED BY THE ABATEMENT OF THE NON-RENEWABLE PRIMARAGLONS ENERGY REQUIREMENT OF 78.812 KWH/M2YEAR. (English)
0 references
Identifiers
E17F18000080006
0 references