120_NULVI_431_PERFORMANCE OF SMART GRIDS OF ENERGY DISTRIBUTION (SMART GRIDS), INTERVENTIONS ON TRANSMISSION NETWORKS AND STIMULATION OF ELECTRIC POWER (Q2051958): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 10:40, 2 November 2020
Project Q2051958 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | 120_NULVI_431_PERFORMANCE OF SMART GRIDS OF ENERGY DISTRIBUTION (SMART GRIDS), INTERVENTIONS ON TRANSMISSION NETWORKS AND STIMULATION OF ELECTRIC POWER |
Project Q2051958 in Italy |
Statements
84,422.76 Euro
0 references
168,845.52 Euro
0 references
50.0 percent
0 references
15 November 2017
0 references
11 May 2019
0 references
COMUNE DI NULVI
0 references
¿REALIZZAZIONE DI MICRO GRID ELETTRICA E SUO COLLEGAMENTO REALIZZAZIONE DELLA STESSA CON INSTALLAZIONE DEL SISTEMA DI ACCUMULO DELL¿ENERGIA PRODOTTA DA IMPIANTI FOTOVOLTAICI ESISTENTI SULLE COPERTURE - INSTALLAZIONE DI N. DUE COLONNINE DI RICARICA PER AUTOVETTURE ELETTRICHE - ACQUISTO DI AUTOVETTURA ELETTRICA (Italian)
0 references
 TO IMPLEMENT AND CONNECT MICRO GRID ELECTRICITY WITH THE SYSTEM OF STORAGE OF ENERGY PRODUCED BY EXISTING PV INSTALLATIONS ON HEDGES — INSTALLATION OF N. TWO CHARGING POINTS FOR ELECTRIC CARS — PURCHASE OF ELECTRIC CARS (English)
0 references
Identifiers
B86I18000060008
0 references