PROJECT SMART GRID PRIMARY CABIN SCORDIA (Q2017770): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 03:29, 2 November 2020
Project Q2017770 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | PROJECT SMART GRID PRIMARY CABIN SCORDIA |
Project Q2017770 in Italy |
Statements
2,606,841.69 Euro
0 references
3,528,674.29 Euro
0 references
73.88 percent
0 references
23 May 2018
0 references
31 December 2020
0 references
E-DISTRIBUZIONE SPA
0 references
IL PROGETTO COMPRENDE INTERVENTI SIA DI STRUTTURA CHE DI IMPLEMENTAZIONE DELLE FUNZIONALITÃ SMART GRID. GLI INTERVENTI STRUTTURALI MIRANO A MODIFICARE LA CONFIGURAZIONE DELL'IMPIANTO AL FINE DI MIGLIORARNE LE CONDIZIONI DI ESERCIZIO E LE PRESTAZIONI.IL PROGETTO PREVEDE L'UTILIZZO DI DISPOSITIVI DI ULTIMA GENERAZIONE CHE PERMETTANO LA COMPLETA SMARTIZZAZIONE DELLA CABINA PRIMARIA E DELLE CABINE SECONDARIE SOTTESE. INOLTRE VERRANNO SOSTITUITE LE LINEE MT TRAMITE NUOVI CAVI IN ALLUMINIO E IN ALLUMINIO ELICORD. Ã PREVISTO ANCHE IL POTENZIAMENTO DELLA CABINA PRIMARIA TRAMITE L'AUMENTO DELLA CAPACITÃ DI TRASFORMAZIONE DELLA STESSA.IL PROGETTO SI QUALIFICA COME SMART GRID IN QUANTO PREVEDE L'INSTALLAZIONE DI DISPOSITIVI TECNOLOGICI E DI APPARECCHIATURE INTELLIGENTI FINALIZZATE AD UNA GESTIONE EVOLUTA DELLA RETE ELETTRICA, CON L'OBIETTIVO DI AGEVOLARE L'INCREMENTO DELLA QUOTA DI FABBISOGNO ENERGETICO COPERTO DA GENERAZIONE DISTRIBUITA DA FONTI RINNOVABILI. IN TAL SENSO SI IMPLEMENTANO LE SE (Italian)
0 references
THE PROJECT COMPRISES BOTH STRUCTURAL AND OPERATIONAL MEASURES FOR SMART GRIDS. THE PURPOSE OF THE STRUCTURAL MEASURES IS TO CHANGE THE DESIGN OF THE PLANT IN ORDER TO IMPROVE THE CONDITIONS FOR OPERATION AND TO IMPROVE THE DESIGN OF THE INSTALLATION. THE DESIGN OF THE INSTALLATION SHALL CONSIST OF THE USE OF STATE-OF-THE-ART DEVICES ENABLING THE COMPLETE SMARTISATION OF THE PRIMARY CABIN AND THE UNDERLYING CABS. IN ADDITION, THE MT LINES WILL BE REPLACED WITH NEW ALUMINIUM AND ALUMINIUM WIRE ROPES. THE PROJECT WILL ALSO COVER THE UPGRADING OF THE PRIMARY CABIN BY INCREASING THE CAPACITY OF THE PROJECT. THE PROJECT QUALIFIES AS SMART GRIDS IN SO FAR AS IT INVOLVES THE INSTALLATION OF SMART TECHNOLOGICAL EQUIPMENT AND APPLIANCES FOR THE IMPROVED MANAGEMENT OF THE ELECTRICITY NETWORK, WITH THE AIM OF FACILITATING THE INCREASE IN THE SHARE OF ENERGY DEMAND COVERED BY GENERATION FROM RENEWABLE SOURCES. THIS IS IMPLEMENTED IF: (English)
0 references
Identifiers
F48D18000040006
0 references